UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C.  20549
FORM 10-K
(Mark One)
x
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2016
or
¨
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
Commission File Number: 001-3034
Xcel Energy Inc.
(Exact name of registrant as specified in its charter)
Minnesota
 
41-0448030
(State or other jurisdiction of incorporation or organization)
 
(I.R.S. Employer Identification No.)
414 Nicollet Mall
Minneapolis, MN 55401
(Address of principal executive offices)
Registrant’s telephone number, including area code: 612-330-5500
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
 
Name of each exchange on which registered
Common Stock, $2.50 par value per share
 
New York Stock Exchange
Securities registered pursuant to section 12(g) of the Act: None
 
 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.  x Yes  ¨ No
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.  ¨ Yes  x No
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.  x Yes  ¨ No
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 and Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).  x Yes  ¨ No
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulations S-K (§229.405 of this chapter) is not contained herein, and will not be contained, to the best of the registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company.  See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.  x Large accelerated filer  ¨ Accelerated filer  ¨ Non-accelerated filer (Do not check if a smaller reporting company) ¨ Smaller Reporting Company
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).  ¨ Yes x No
As of June 30, 2016, the aggregate market value of the voting common stock held by non-affiliates of the Registrants was $22,746,126,160 and there were 507,952,795 shares of common stock outstanding.
As of Feb. 20, 2017, there were 507,222,795 shares of common stock outstanding, $2.50 par value.
DOCUMENTS INCORPORATED BY REFERENCE

The Registrant’s Definitive Proxy Statement for its 2017 Annual Meeting of Shareholders is incorporated by reference into Part III of this Form 10-K.
 


Table of Contents

TABLE OF CONTENTS
Index
PART I
 
 
Item 1 —
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Item 1A —
Item 1B —
Item 2 —
Item 3 —
Item 4 —
 
 
 
PART II
 
 
Item 5 —
Item 6 —
Item 7 —
Item 7A —
Item 8 —
Item 9 —
Item 9A —
Item 9B —
 
 
 
PART III
 
 
Item 10 —
Item 11 —
Item 12 —
Item 13 —
Item 14 —
 
 
 
PART IV
 
 
Item 15 —
 
 

2

Table of Contents

PART I

Item 1 — Business

DEFINITION OF ABBREVIATIONS AND INDUSTRY TERMS
Xcel Energy Inc.’s Subsidiaries and Affiliates (current and former)
Capital Services
Capital Services, LLC
Eloigne
Eloigne Company
NCE
New Century Energies, Inc.
NSP-Minnesota
Northern States Power Company, a Minnesota corporation
NSP System
The electric production and transmission system of NSP-Minnesota and NSP-Wisconsin operated on an integrated basis and managed by NSP-Minnesota
NSP-Wisconsin
Northern States Power Company, a Wisconsin corporation
Operating companies
NSP-Minnesota, NSP-Wisconsin, PSCo and SPS
PSCo
Public Service Company of Colorado
SPS
Southwestern Public Service Co.
Utility subsidiaries
NSP-Minnesota, NSP-Wisconsin, PSCo and SPS
WGI
WestGas InterState, Inc.
WYCO
WYCO Development, LLC
Xcel Energy
Xcel Energy Inc. and its subsidiaries
XETD
Xcel Energy Transmission Development Company, LLC
XEST
Xcel Energy Southwest Transmission Company, LLC
XEWT
Xcel Energy West Transmission Company, LLC
 
 
Federal and State Regulatory Agencies
ASLB
Atomic Safety and Licensing Board
CFTC
Commodity Futures Trading Commission
CPUC
Colorado Public Utilities Commission
D.C. Circuit
United States Court of Appeals for the District of Columbia Circuit
DOC
Minnesota Department of Commerce
DOE
United States Department of Energy
DOT
United States Department of Transportation
EPA
United States Environmental Protection Agency
FERC
Federal Energy Regulatory Commission
IRS
Internal Revenue Service
MPCA
Minnesota Pollution Control Agency
MPSC
Michigan Public Service Commission
MPUC
Minnesota Public Utilities Commission
NDPSC
North Dakota Public Service Commission
NERC
North American Electric Reliability Corporation
NMPRC
New Mexico Public Regulation Commission
NRC
Nuclear Regulatory Commission
PHMSA
Pipeline and Hazardous Materials Safety Administration
PNM
Public Service Company of New Mexico
PSCW
Public Service Commission of Wisconsin
PUCT
Public Utility Commission of Texas
SDPUC
South Dakota Public Utilities Commission
SEC
Securities and Exchange Commission

3

Table of Contents


Electric, Purchased Gas and Resource Adjustment Clauses
CIP
Conservation improvement program
DCRF
Distribution cost recovery factor
DSM
Demand side management
DSMCA
Demand side management cost adjustment
ECA
Retail electric commodity adjustment
EE
Energy efficiency
EECRF
Energy efficiency cost recovery factor
EIR
Environmental improvement rider (recovers the costs associated with investments in
environmental improvements to fossil fuel generation plants)
EPU
Extended power uprate
ERP
Electric resource plan
FCA
Fuel clause adjustment
FPPCAC
Fuel and purchased power cost adjustment clause
GCA
Gas cost adjustment
GUIC
Gas utility infrastructure cost rider
PCCA
Purchased capacity cost adjustment
PCRF
Power cost recovery factor (recovers the costs of certain purchased power costs)
PGA
Purchased gas adjustment
QSP
Quality of service plan
RDF
Renewable development fund
RER
Renewable energy rider
RES
Renewable energy standard (recovers the costs of new renewable generation)
RESA
Renewable energy standard adjustment
SCA
Steam cost adjustment
TCA
Transmission cost adjustment
TCR
Transmission cost recovery adjustment
TCRF
Transmission cost recovery factor (recovers transmission infrastructure improvement costs
and changes in wholesale transmission charges)
 
 
Other Terms and Abbreviations
AFUDC
Allowance for funds used during construction
ATM
At-the-market
ALJ
Administrative law judge
APBO
Accumulated postretirement benefit obligation
ARO
Asset retirement obligation
ASU
FASB Accounting Standards Update
BART
Best available retrofit technology
C&I
Commercial and Industrial
CAA
Clean Air Act
CACJA
Clean Air Clean Jobs Act
CAIR
Clean Air Interstate Rule
CapX2020
Alliance of electric cooperatives, municipals and investor-owned utilities in the upper
Midwest involved in a joint transmission line planning and construction effort
CCN
Certificate of convenience and necessity
CIG
Colorado Interstate Gas Company, LLC
CO2
Carbon dioxide

4

Table of Contents

CON
Certificate of need
CPCN
Certificate of public convenience and necessity
CPP
Clean Power Plan
CSAPR
Cross-State Air Pollution Rule
CWIP
Construction work in progress
EEI
Edison Electric Institute
EGU
Electric generating unit
EPS
Earnings per share
ERCOT
Electric Reliability Council of Texas
ETR
Effective tax rate
FASB
Financial Accounting Standards Board
FIP
Federal implementation plan
FTR
Financial transmission right
GAAP
Generally accepted accounting principles
GHG
Greenhouse gas
Golden Spread
Golden Spread Electric Cooperative, Inc.
HTY
Historic test year
IM
Integrated market
IPP
Independent power producers
ISFSI
Independent Spent Fuel Storage Installation
ITC
Investment Tax Credit
LCM
Life cycle management
LLW
Low-level radioactive waste
LNG
Liquefied natural gas
MGP
Manufactured gas plant
MISO
Midcontinent Independent System Operator, Inc.
Moody’s
Moody’s Investor Services
MYP
Multi-year plan
NAAQS
National Ambient Air Quality Standard
Native load
Customer demand of retail and wholesale customers that a utility has an obligation to serve
under statute or long-term contract
NAV
Net asset value
NOL
Net operating loss
NOx
Nitrogen oxide
NOV
Notice of violation
NTC
Notifications to construct
NYISO
New York Independent System Operator
O&M
Operating and maintenance
OCC
Office of Consumer Counsel
OCI
Other comprehensive income
PCB
Polychlorinated biphenyl
PFS
Private Fuel Storage, LLC
PI
Prairie Island nuclear generating plant
PJM
PJM Interconnection, LLC
PM
Particulate matter
PPA
Purchased power agreement
PRP
Potentially responsible party
PTC
Production tax credit
PV
Photovoltaic
QF
Qualifying facilities
R&E
Research and experimentation
REC
Renewable energy credit

5

Table of Contents

RFP
Request for proposal
ROE
Return on equity
RPS
Renewable portfolio standards
RTO
Regional Transmission Organization
SIP
State implementation plan
SO2
Sulfur dioxide
SPP
Southwest Power Pool, Inc.
S&P
Standard & Poor’s Ratings Services
TO
Transmission owner
TransCo
Transmission-only subsidiary
TSR
Total shareholder return
 
 
Measurements
 
Bcf
Billion cubic feet
GWh
Gigawatt hours
KV
Kilovolts
KWh
Kilowatt hours
Mcf
Thousand cubic feet
MMBtu
Million British thermal units
MW
Megawatts
MWh
Megawatt hours


6

Table of Contents

COMPANY OVERVIEW

Xcel Energy Inc. is a holding company with subsidiaries engaged primarily in the utility business. In 2016, Xcel Energy Inc.’s continuing operations included the activity of four wholly owned utility subsidiaries that serve electric and natural gas customers in eight states. These utility subsidiaries are NSP-Minnesota, NSP-Wisconsin, PSCo and SPS, and serve customers in portions of Colorado, Michigan, Minnesota, New Mexico, North Dakota, South Dakota, Texas and Wisconsin. Along with WYCO, a joint venture formed with CIG to develop and lease natural gas pipelines, storage, and compression facilities, and WGI, an interstate natural gas pipeline company, these companies comprise the regulated utility operations.

Xcel Energy Inc. was incorporated under the laws of Minnesota in 1909. Xcel Energy’s executive offices are located at 414 Nicollet Mall, Minneapolis, Minn. 55401. Its website address is www.xcelenergy.com. Xcel Energy makes available, free of charge through its website, its annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and all amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 as soon as reasonably practicable after the reports are electronically filed with or furnished to the SEC. The public may read and copy any materials that Xcel Energy files with the SEC at the SEC’s Public Reference Room at 100 F Street, N.E., Washington, D.C. 20549. The public may obtain information on the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330. The SEC also maintains an internet site that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC at http://www.sec.gov.

NSP-Minnesota

NSP-Minnesota is a utility primarily engaged in the generation, purchase, transmission, distribution and sale of electricity in Minnesota, North Dakota and South Dakota. The wholesale customers served by NSP-Minnesota comprised approximately 13 percent of its total KWh sold in 2016. NSP-Minnesota also purchases, transports, distributes and sells natural gas to retail customers and transports customer-owned natural gas in Minnesota and North Dakota. NSP-Minnesota provides electric utility service to approximately 1.5 million customers and natural gas utility service to approximately 0.5 million customers. Approximately 88 percent of NSP-Minnesota’s retail electric operating revenues were derived from operations in Minnesota during 2016 and 2015. Although NSP-Minnesota’s large C&I electric retail customers are comprised of many diversified industries, a significant portion of NSP-Minnesota’s large C&I electric sales include the following industries: petroleum, coal and food products. For small C&I customers, significant electric retail sales include the following industries: real estate and educational services. Generally, NSP-Minnesota’s earnings contribute approximately 35 percent to 45 percent of Xcel Energy’s consolidated net income.

The electric production and transmission costs of the entire NSP System are shared by NSP-Minnesota and NSP-Wisconsin. A FERC-approved Interchange Agreement between the two companies provides for the sharing of all generation and transmission costs of the NSP System.

NSP-Minnesota owns the following direct subsidiary: United Power and Land Company, which holds real estate.

NSP-Wisconsin

NSP-Wisconsin is a utility primarily engaged in the generation, transmission, distribution and sale of electricity in portions of northwestern Wisconsin and in the western portion of the Upper Peninsula of Michigan. NSP-Wisconsin purchases, transports, distributes and sells natural gas to retail customers and transports customer-owned natural gas in this service territory. NSP-Wisconsin provides electric utility service to approximately 257,000 customers and natural gas utility service to approximately 113,000 customers. Approximately 98 percent of NSP-Wisconsin’s retail electric operating revenues were derived from operations in Wisconsin during 2016 and 2015. Although NSP-Wisconsin’s large C&I electric retail customers are comprised of many diversified industries, a significant portion of NSP-Wisconsin’s large C&I electric sales include the following industries: food products, paper, allied products and petroleum pipelines. For small C&I customers, significant electric retail sales include the following industries: grocery and dining establishments, educational services and health services. Generally, NSP-Wisconsin’s earnings contribute approximately five percent to 10 percent of Xcel Energy’s consolidated net income.

The management of the electric production and transmission system of NSP-Wisconsin is integrated with NSP-Minnesota.

NSP-Wisconsin owns the following direct subsidiaries: Chippewa and Flambeau Improvement Co., which operates hydro reservoirs; Clearwater Investments Inc., which owns interests in affordable housing; and NSP Lands, Inc., which holds real estate.


7

Table of Contents

PSCo

PSCo is a utility engaged primarily in the generation, purchase, transmission, distribution and sale of electricity in Colorado. The wholesale customers served by PSCo comprised approximately 14 percent of its total KWh sold in 2016. PSCo also purchases, transports, distributes and sells natural gas to retail customers and transports customer-owned natural gas. PSCo provides electric utility service to approximately 1.4 million customers and natural gas utility service to approximately 1.4 million customers. All of PSCo’s retail electric operating revenues were derived from operations in Colorado during 2016. Although PSCo’s large C&I electric retail customers are comprised of many diversified industries, a significant portion of PSCo’s large C&I electric sales include the following industries: fabricated metal products, communications and health services. For small C&I customers, significant electric retail sales include the following industries: real estate and dining establishments. Generally, PSCo’s earnings contribute approximately 35 percent to 45 percent of Xcel Energy’s consolidated net income.

PSCo owns the following direct subsidiaries: 1480 Welton, Inc. and United Water Company, both of which own certain real estate interests; and Green and Clear Lakes Company, which owns water rights and certain real estate interests. PSCo also holds a controlling interest in several other relatively small ditch and water companies.

SPS

SPS is a utility engaged primarily in the generation, purchase, transmission, distribution and sale of electricity in portions of Texas and New Mexico. The wholesale customers served by SPS comprised approximately 31 percent of its total KWh sold in 2016. SPS provides electric utility service to approximately 389,000 retail customers in Texas and New Mexico. Approximately 71 percent of SPS’ retail electric operating revenues were derived from operations in Texas during 2016 and 2015. Although SPS’ large C&I electric retail customers are comprised of many diversified industries, a significant portion of SPS’ large C&I electric sales include the following industries: oil and gas extraction, as well as petroleum and natural gas products. For small C&I customers, significant electric retail sales include the following industries: oil and gas extraction, grocery and dining establishments. Generally, SPS’ earnings contribute approximately 10 percent to 15 percent of Xcel Energy’s consolidated net income.

Other Subsidiaries

WGI is a small interstate natural gas pipeline company engaged in transporting natural gas from the PSCo system near Chalk Bluffs, Colo., to Cheyenne, Wyo.

WYCO was formed as a joint venture with CIG to develop and lease natural gas pipeline, storage, and compression facilities. Xcel Energy has a 50 percent ownership interest in WYCO. The gas pipeline and storage facilities are leased under a FERC-approved agreement to CIG.

Xcel Energy Services Inc. is the service company for Xcel Energy Inc.

XETD and XEST are transmission-only subsidiaries that will, respectively, participate in MISO and SPP competitive bidding processes for transmission projects. XEWT is a transmission-only subsidiary formed to competitively bid on transmission projects in the western United States.
Xcel Energy Inc.’s nonregulated subsidiaries are Eloigne and Capital Services. Eloigne invests in rental housing projects that qualify for low-income housing tax credits, and Capital Services procures equipment for construction of renewable generation facilities at other subsidiaries.
Xcel Energy conducts its utility business in the following reportable segments: regulated electric utility, regulated natural gas utility and all other. See Note 17 to the consolidated financial statements for further discussion relating to comparative segment revenues, income from operations and related financial information.


8

Table of Contents

ELECTRIC UTILITY OPERATIONS

NSP-Minnesota
Public Utility Regulation

Summary of Regulatory Agencies and Areas of Jurisdiction Retail rates, services and other aspects of NSP-Minnesota’s operations are regulated by the MPUC, the NDPSC and the SDPUC within their respective states. The MPUC also has regulatory authority over security issuances, property transfers, mergers, dispositions of assets and transactions between NSP-Minnesota and its affiliates. In addition, the MPUC reviews and approves NSP-Minnesota’s ERPs for meeting customers’ future energy needs. The MPUC also certifies the need and siting for generating plants greater than 50 MW and transmission lines greater than 100 KV that will be located within the state. No large power plant or transmission line may be constructed in Minnesota except on a site or route designated by the MPUC. The NDPSC and SDPUC have regulatory authority over generation and transmission facilities, along with the siting and routing of new generation and transmission facilities in North Dakota and South Dakota, respectively.

NSP-Minnesota is subject to the jurisdiction of the FERC with respect to its wholesale electric operations, hydroelectric licensing, accounting practices, wholesale sales for resale, transmission of electricity in interstate commerce, compliance with NERC electric reliability standards, asset transfers and mergers, and natural gas transactions in interstate commerce. NSP-Minnesota operates within the MISO RTO and MISO wholesale market and is authorized to make wholesale electric sales at market-based prices. NSP-Minnesota is a transmission owning member of the MISO RTO.

Fuel, Purchased Energy and Conservation Cost-Recovery Mechanisms NSP-Minnesota has several retail adjustment clauses that recover fuel, purchased energy and other resource costs:

CIP — Recovers the costs of conservation and demand-side management programs that help customers save energy.
EIR — Recovers the costs of environmental improvement projects.
RDF — Allocates money collected from retail customers to support the research and development of emerging renewable energy projects and technologies.
RES — Recovers the cost of renewable generation in Minnesota.
RER — Recovers the cost of renewable generation in North Dakota.
SEP — Recovers costs related to various energy policies approved by the Minnesota legislature.
TCR — Recovers costs associated with investments in electric transmission and distribution grid modernization costs.
Infrastructure rider — Recovers costs for investments in generation and incremental property taxes in South Dakota.

NSP-Minnesota’s retail electric rates in Minnesota, North Dakota and South Dakota include a FCA for monthly billing adjustments to recover changes in prudently incurred costs of fuel related items and purchased energy. In general, capacity costs are recovered through base rates and are not recovered through the FCA. In addition, costs associated with MISO are generally recovered through either the FCA or base rates.

Minnesota state law requires NSP-Minnesota to invest two percent of its state electric revenues and half a percent of its state gas revenues in CIP. These costs are recovered through an annual cost-recovery mechanism for electric conservation and energy management program expenditures. Minnesota state law also requires NSP-Minnesota to submit a CIP plan at least every three years.

CIP Triennial Plan In 2016, the DOC approved NSP-Minnesota’s 2017 through 2019 CIP Triennial Plan, which maintained the energy savings goals and allowed for slight budget increases over the previous plan. The plan sets an annual energy savings goal for electric of saving the equivalent of 1.5 percent of the volume of electric energy sales and an annual natural gas goal of saving 1.0 percent of the volume of gas energy sales.

Capacity and Demand

Uninterrupted system peak demand for the NSP System’s electric utility for each of the last three years and the forecast for 2017, assuming normal weather conditions, is as follows:
 
System Peak Demand (in MW)
 
2014
 
2015
 
2016
 
2017 Forecast
NSP System
8,848

 
8,621

 
9,002

 
9,179



9

Table of Contents

The peak demand for the NSP System typically occurs in the summer. The 2016 system peak demand for the NSP System occurred on July 20, 2016. The 2016 system peak demand increased from the previous year due to customer growth and warmer summer weather. The 2017 forecast assumes normal peak day weather, which would be warmer than 2016.

Energy Sources and Related Transmission Initiatives

NSP-Minnesota expects to use existing power plants, power purchases, CIP options, new generation facilities and expansion of existing power plants to meet its system capacity requirements.

Purchased Power NSP-Minnesota has contracts to purchase power from other utilities and independent power producers. Generally, long-term dispatchable purchased power contracts require a periodic capacity payment and a charge for the delivered associated energy. Some long-term purchased power contracts only contain a charge for the purchased energy. NSP-Minnesota also makes short-term purchases to meet system load and energy requirements, to replace generation from company-owned units under maintenance or during outages, to meet operating reserve obligations, or to obtain energy at a lower cost.

Purchased Transmission Services NSP-Minnesota and NSP-Wisconsin have contracts with MISO and other regional transmission service providers to deliver power and energy to their customers.

Courtenay Wind Farm In November 2016, NSP-Minnesota placed into service the Courtenay wind farm, a 200 MW NSP-Minnesota owned project in North Dakota. In July and August 2015, the MPUC and NDPSC, respectively, approved the Courtenay wind farm with recovery up to $300 million of capital costs. Total project costs were approximately $286 million, which were included in the Minnesota RES rider and the North Dakota RER.

NSP System Resource Plans — In January 2017, the MPUC approved NSP-Minnesota’s Integrated Resource Plan that includes:

Retirement of Sherco Unit 2 in 2023 and Sherco Unit 1 in 2026. The resulting need for 750 MW of capacity in 2026 will be addressed in a future CON proceeding;
Acquisition of at least 1,000 MW of wind by 2019 and possibly as much as 1,500 MW dependent on price, bidder qualifications, rate impact, transmission availability and location. The mix of purchased power and owned facilities was not specified;
Acquisition of 650 MW of solar by 2021 either through the community solar gardens program or other cost-effective resources. The mix of purchased power and owned facilities was not specified;
Acquisition of at least 400 MW of additional demand response by 2023, and a study of the technical and economic achievability of 1,000 MW of additional demand response in total by 2025; and
Achievement of at least 444 GWh of energy efficiency in all planning years.

In 2016, Minnesota legislators introduced a bill which would allow NSP-Minnesota to build a natural gas combined-cycle power plant at NSP-Minnesota’s Sherco site. The bill passed the House and Senate in February 2017 but will require approval from the Governor to become effective. A final resolution is expected later in 2017 and cost recovery would be subject to MPUC approval.

Request for Proposal (RFP) In September 2016, NSP-Minnesota issued a RFP for 1,500 MW of wind generation. The RFP requests both PPAs and build-own-transfer proposals.

In October 2016, NSP-Minnesota submitted a petition for approval to the MPUC of a 750 MW self-build wind farm portfolio. RFP bids were received in October 2016 and have been evaluated in conjunction with the self-build proposal.

In January 2017, NSP-Minnesota completed the bid evaluation process. NSP-Minnesota evaluated the bid proposals based on a completeness review, a levelized cost of electricity economic evaluation and a non-price qualitative review. NSP-Minnesota believes its self-build wind projects were competitive and should complement the RFP portfolio.

An overview of the anticipated RFP schedule is as follows:

Project proposal selection and negotiation during the first quarter of 2017;
NSP-Minnesota’s recommendation for proposed wind additions to the MPUC later in the first quarter of 2017; and
MPUC approval is expected by July 2017.


10

Table of Contents

Jurisdictional Cost Recovery Allocation — In December 2016, NSP-Minnesota filed a resource treatment framework with the NDPSC and MPUC. The filing proposed a framework to allow North Dakota and Minnesota to gradually become more independent of one another with respect to future generation resource selection while also identifying a path for cost sharing of current resources.   NSP-Minnesota’s filing identified two options: a legal separation, creating a separate North Dakota operating company; or a pseudo separation, which maintains the current corporate structure but directly assigns the costs and benefits of each resource to the jurisdiction that supports it. The annual costs for a legal separation and pseudo separation are estimated to be approximately $3 million and $1 million, respectively. A one-time cost of approximately $10 million would also be incurred to establish a North Dakota operating company under legal separation. Costs are not expected to be incurred until 2020 and are anticipated to be recoverable through rates. The filing proposed a procedural schedule that considers an order in mid-2018.

CapX2020 — The estimated cost of the five major CapX2020 transmission projects listed below is $2 billion.  NSP-Minnesota and NSP-Wisconsin are responsible for approximately $1.06 billion of the total investment and the majority of this investment has occurred. The projects are as follows:

Hampton, Minn. to Rochester, Minn. to La Crosse, Wis. 161/345 KV transmission lines — The final 161 KV and 345 KV segments of the project went into service in January 2016 and September 2016, respectively;
Brookings County, S.D. to Hampton, Minn. 345 KV transmission line — The project was placed in service in March 2015;
Bemidji, Minn. to Grand Rapids, Minn. 230 KV transmission line — The project was placed in service in September 2012;
Monticello, Minn. to Fargo, N.D. 345 KV transmission line — The final portion of the project was placed in service in April 2015; and
Big Stone South to Brookings County, S.D. 345 KV transmission line — Construction of the line began in September 2015, with completion anticipated in September 2017.

Nuclear Power Operations and Waste Disposal

NSP-Minnesota owns two nuclear generating plants: the Monticello plant and the PI plant. Nuclear power plant operations produce gaseous, liquid and solid radioactive wastes which are controlled by federal regulation. High-level radioactive wastes primarily include used nuclear fuel. LLW consists primarily of demineralizer resins, paper, protective clothing, rags, tools and equipment that have become contaminated through use in a plant.

NRC Regulation — The NRC regulates the nuclear operations of NSP-Minnesota. Decisions by the NRC can significantly impact the operations of the nuclear generating plants. The costs of complying with NRC orders and requirements can affect both operating expenses and capital investments of the plants. NSP-Minnesota has obtained recovery of these compliance costs in customer rates, and expects the costs associated with compliance will continue to be recoverable from customers. Estimates of the future nuclear capital expenditures related to costs of NRC compliance are included in Xcel Energy’s capital forecast for electric generation. See Item 7 for further discussion of capital requirements.

Nuclear Regulatory Performance The NRC has a Reactor Oversight Process that classifies U.S. nuclear reactors into various categories (referred to as Columns, from 1 to 5).  Issues are evaluated as either green, white, yellow, or red based on their safety significance, with green representing the least safety concern and red representing the most concern. 

At Dec. 31, 2016, PI Units 1 and 2 were in Column 1 (licensee response) with all green performance indicators and no greater than green findings or violations. Plants in Column 1 are subject to only a pre-defined set of basic NRC inspections.

In the fourth quarter of 2016, Monticello moved from Column 1 to Column 2 (regulatory response) due to a white performance indicator related to an oil leak in a backup cooling system in 2016. Plants in Column 2 are subject to special NRC inspections to review and validate that performance issues or inspection findings have been properly addressed. Monticello has addressed the issues leading to the finding and will be eligible to return to Column 1 once the NRC completes an inspection to close the issue. NSP-Minnesota currently expects the inspection to occur, and Monticello to return to Column 1 in mid-2017.


11

Table of Contents

Monticello Spent Fuel Storage - Dry Shielded Canisters In 2013, NSP-Minnesota’s Monticello nuclear generating plant conducted a spent fuel loading campaign which resulted in five storage canisters being loaded and placed in the ISFSI and a sixth one being loaded but remaining in the plant pending resolution of weld inspection issues. Successful pressure and leak testing demonstrated the safety and integrity of all six canisters involved. The NRC conducted an investigation and determined that two contractor technicians at Monticello deliberately violated NRC requirements and failed to follow procedure in performing Non-Destructive Examinations (NDE) on the six spent fuel storage canisters (Dry Shielded Canisters #11-16) in accordance with procedural requirements and falsified records when recording the NDE results. NSP-Minnesota took several actions to assure that compliance with the NRC’s regulations and Monticello’s storage license can be demonstrated.

In December 2016, the NRC issued a confirmatory order formally approving a settlement in which NSP-Minnesota agreed to a timeline for attaining compliance on all six canisters as well as additional training and communications. As a result, the NRC will not issue a notice of violation or impose a civil penalty to NSP-Minnesota and will consider the terms of its order as an escalated enforcement action for a period of one year. During 2016, the NRC approved an exemption request for the completion of the final canister #16. That canister is now considered in compliance, and was placed in the ISFSI during 2016.

Costs attributable to Monticello canisters #11-15 achieving full regulatory compliance within five years, as agreed to in the settlement, are currently being evaluated. No public safety issues have been raised, or are believed to exist, related to handling of spent nuclear fuel at Monticello in regard to this matter.

LLW Disposal LLW from NSP-Minnesota’s Monticello and PI nuclear plants is currently disposed at the Clive facility located in Utah and Waste Control Specialists facility located in Texas. If off-site LLW disposal facilities become unavailable, NSP-Minnesota has storage capacity available on-site at PI and Monticello that would allow both plants to continue to operate until the end of their current licensed lives.

High-Level Radioactive Waste Disposal The federal government has the responsibility to permanently dispose of domestic spent nuclear fuel and other high-level radioactive wastes. The Nuclear Waste Policy Act requires the DOE to implement a program for nuclear high-level waste management. This includes the siting, licensing, construction and operation of a repository for spent nuclear fuel from civilian nuclear power reactors and other high-level radioactive wastes at a permanent federal storage or disposal facility. The federal government has been evaluating a nuclear geologic repository at Yucca Mountain, Nevada for many years. At this time, there are no definitive plans for a permanent federal storage site at Yucca Mountain or any other site.

Nuclear Spent Fuel Storage
NSP-Minnesota has interim on-site storage for spent nuclear fuel at its Monticello and PI nuclear generating plants. As of Dec. 31, 2016, there were 40 casks loaded and stored at the PI plant and 16 canisters loaded and stored at the Monticello plant. An additional 24 casks for PI and 14 canisters for Monticello have been authorized by the State of Minnesota. This currently authorized storage capacity is sufficient to allow NSP-Minnesota to operate until the end of the operating licenses in 2030 for Monticello, 2033 for PI Unit 1, and 2034 for PI Unit 2. Authorizations for additional spent fuel storage capacity may be required at each site to support either continued operation or decommissioning if the federal government does not begin operation of a consolidated interim storage installation.

NRC Waste Confidence Decision (WCD) — In 2014, the NRC published a Generic Environmental Impact Statement and revised WCD rule, now called the Continued Storage Rule (CSR) on the temporary on-site storage of spent nuclear fuel. The CSR assesses how long temporary on-site storage can remain safe and when facilities for the disposal of nuclear waste will become available. Issuance of the CSR now allows the NRC to proceed with final license decisions regarding the new and renewed plant and ISFSI operating licenses without the need to litigate contentions related to the continued storage of spent nuclear fuel on-site. This may facilitate potential future spent fuel licensing needs for NSP-Minnesota. The CSR was challenged before the U.S. Court of Appeals for the D.C. Circuit on the grounds that the environmental impact statement is inadequate to satisfy the National Environmental Policy Act. In June 2016, the D.C. Circuit’s decision upheld the CSR.

See Note 14 to the consolidated financial statements for further discussion regarding nuclear related items.

12

Table of Contents


Energy Source Statistics
 
Year Ended Dec. 31
 
2016
 
2015
 
2014
NSP System
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
Nuclear
14,191

 
30
%
 
12,425

 
27
%
 
13,434

 
29
%
Coal
13,681

 
28

 
15,961

 
35

 
18,079

 
39

Wind (a)
7,897

 
16

 
6,235

 
14

 
6,243

 
14

Natural Gas
7,810

 
16

 
6,689

 
15

 
3,402

 
7

Hydroelectric
3,203

 
7

 
3,326

 
7

 
3,560

 
8

Other (b)
1,480

 
3

 
1,083

 
2

 
1,417

 
3

Total
48,262

 
100
%
 
45,719

 
100
%
 
46,135

 
100
%
 
 
 
 
 
 
 
 
 
 
 
 
Owned generation
36,381

 
75
%
 
33,818

 
74
%
 
33,641

 
73
%
Purchased generation
11,881

 
25

 
11,901

 
26

 
12,494

 
27

Total
48,262

 
100
%
 
45,719

 
100
%
 
46,135

 
100
%
(a) 
This category includes wind energy de-bundled from RECs and also includes Windsource® RECs. The NSP System uses RECs to meet or exceed state resource requirements and may sell surplus RECs.
(b) 
Includes energy from other sources, including solar, biomass, oil and refuse. Distributed generation from the Solar*Rewards® program is not included, and was approximately 21, eight and seven million net KWh for 2016, 2015, and 2014, respectively.

Fuel Supply and Costs

The following table shows the delivered cost per MMBtu of each significant category of fuel consumed for owned electric generation, the percentage of total fuel requirements represented by each category of fuel and the total weighted average cost of all fuels.
 
 
Coal (a)
 
Nuclear
 
Natural Gas
 
Weighted
Average Owned Fuel Cost
NSP System Generating Plants
 
Cost
 
Percent
 
Cost
 
Percent
 
Cost
 
Percent
 
2016
 
$
2.03

 
42
%
 
$
0.80

 
44
%
 
$
3.30

 
14
%
 
$
1.67

2015
 
2.15

 
47

 
0.83

 
40

 
3.89

 
13

 
1.85

2014
 
2.23

 
52

 
0.89

 
42

 
6.27

 
6

 
1.94

(a) 
Includes refuse-derived fuel and wood.

The cost of natural gas in 2016 decreased due to lower wholesale commodity prices.

See Items 1A and 7 for further discussion of fuel supply and costs.

Fuel Sources

Nuclear — NSP-Minnesota secures contracts for uranium concentrates, uranium conversion, uranium enrichment and fuel fabrication to operate its’ nuclear plants. The contract strategy involves a portfolio of spot purchases and medium and long-term contracts for uranium concentrates, conversion services and enrichment services with multiple producers and with a focus on diversification to minimize potential impacts caused by supply interruptions due to geographical and world political issues.

Current nuclear fuel supply contracts cover 100 percent of uranium concentrates requirements through 2019 and approximately 53 percent of the requirements for 2020 through 2030;
Current contracts for conversion services cover 100 percent of the requirements through 2021 and approximately 49 percent of the requirements for 2022 through 2030; and
Current enrichment service contracts cover 100 percent of the requirements through 2025 and approximately 28 percent of the requirements for 2026 through 2030.

Fabrication services for Monticello and PI are 100 percent committed through 2030 and 2019, respectively. 


13

Table of Contents

NSP-Minnesota expects sufficient uranium concentrates, conversion services and enrichment services to be available for the total fuel requirements of its nuclear generating plants. Some exposure to market price volatility will remain due to index-based pricing structures contained in certain supply contracts.

Coal — The NSP System normally maintains approximately 41 days of coal inventory. Coal supply inventories at Dec. 31, 2016 and 2015 were approximately 55 and 67 days of usage, respectively. At Dec. 31, 2016, milder weather, purchase commitments and relatively low natural gas prices resulted in coal inventories being above optimal levels. NSP-Minnesota’s generation stations use low-sulfur western coal purchased primarily under contracts with suppliers operating in Wyoming and Montana. During 2016 and 2015, coal requirements for the NSP System’s major coal-fired generating plants were approximately 7.5 million tons and 8.3 million tons, respectively. Coal requirements for 2016 decreased primarily due to relatively low natural gas prices during the year. The estimated coal requirements for 2017 are approximately 8.9 million tons. The increase is primarily due to higher expected natural gas prices in 2017.

NSP-Minnesota and NSP-Wisconsin have contracted for coal supplies to provide 74 percent of their estimated coal requirements in 2017 and a declining percentage of the requirements in subsequent years. The NSP System’s general coal purchasing objective is to contract for approximately 80 percent of requirements for the first year, 50 percent of requirements in year two and 25 percent of requirements in year three. Remaining requirements will be filled through the procurement process or over-the-counter transactions.

NSP-Minnesota and NSP-Wisconsin have a number of coal transportation contracts that provide for delivery of 100 percent of their coal requirements in 2017 and 2018. Coal delivery may be subject to interruptions or reductions due to operation of the mines, transportation problems, weather and availability of equipment.

Natural gas — The NSP System uses both firm and interruptible natural gas supply and standby oil in combustion turbines and certain boilers. Natural gas supplies, transportation and storage services for power plants are procured under contracts to provide an adequate supply of fuel. However, as natural gas primarily serves intermediate and peak demand, remaining forecasted requirements are able to be procured through a liquid spot market. Generally, natural gas supply contracts have variable pricing that is tied to various natural gas indices. Most transportation contract pricing is based on FERC approved transportation tariff rates. Certain natural gas supply and transportation agreements include obligations for the purchase and/or delivery of specified volumes of natural gas or to make payments in lieu of delivery. At Dec. 31, 2016 and 2015, the NSP System did not have any commitments related to gas supply contracts; however commitments related to gas transportation and storage contracts were approximately $382 million and $276 million, respectively. Commitments related to gas transportation and storage contracts expire in various years from 2017 to 2028.

The NSP System also has limited on-site fuel oil storage facilities and primarily relies on the spot market for incremental supplies.

Renewable Energy Sources

The NSP System’s renewable energy portfolio includes wind, hydroelectric, biomass and solar power from both owned generating facilities and PPAs. As of Dec. 31, 2016, the NSP System was in compliance with mandated RPS, which require generation from renewable resources of 18.0 percent and 12.9 percent of NSP-Minnesota and NSP-Wisconsin electric retail sales, respectively.

Renewable energy comprised 26.1 percent and 23.3 percent of the NSP System’s total energy for 2016 and 2015, respectively;
Wind energy comprised 16.4 percent and 13.6 percent of the total energy for 2016 and 2015, respectively;
Hydroelectric energy comprised 6.6 percent and 7.3 percent of the total energy for 2016 and 2015, respectively; and
Biomass and solar power comprised approximately 3.1 percent and 2.4 percent of the total energy for 2016 and 2015, respectively.

The NSP System also offers customer-focused renewable energy initiatives. Windsource allows customers in Minnesota, Wisconsin and Michigan to purchase a portion or all of their electricity from renewable sources. In 2016, the number of customers utilizing Windsource increased to approximately 54,000 from 50,000 in 2015.


14

Table of Contents

Additionally, to encourage the growth of solar energy on the system, customers are offered incentives to install solar panels on their homes and businesses under the Solar*Rewards program. Over 2,063 PV systems with approximately 25.2 MW of aggregate capacity have been installed in Minnesota as of Dec. 31, 2016 and over 1,458 PV systems with approximately 18.3 MW of aggregate capacity have been installed as of Dec. 31, 2015. The community solar gardens program is another option made available to encourage use of solar energy in Minnesota. This program allows for offsite development of solar and bill credits to customers based on an approved tariffed rate. Although very few MW came on line in 2016, an increase in the MW supplied through this program is expected in 2017.

Wind  The NSP System acquires the majority of its wind energy from PPAs with wind farm owners, primarily located in Southwestern Minnesota. Currently, the NSP System has more than 125 of these agreements in place, with facilities ranging in size from under one MW to more than 200 MW. The NSP System owns and operates five wind farms which have the capacity to generate 852 MW.

The NSP System had approximately 2,602 and 2,210 MW of wind energy on its system at the end of 2016 and 2015, respectively. In addition to receiving purchased wind energy under these agreements, the NSP System also typically receives wind RECs, which are used to meet state renewable resource requirements.

The average cost per MWh of wind energy under existing contracts was approximately $43 and $42 for 2016 and 2015, respectively.  The cost per MWh of wind energy varies by contract and may be influenced by a number of factors including regulation, state-specific renewable resource requirements and the year of contract execution. Generally, contracts executed in 2016 continued to benefit from improvements in technology, excess capacity among manufacturers and motivation to commence new construction prior to the anticipated expiration of the federal PTCs. In December 2015, the federal PTCs were extended through 2019 with a phase down beginning in 2017.

Hydroelectric  The NSP System acquires its hydroelectric energy from both owned generation and PPAs. The NSP System owns 20 hydroelectric plants throughout Wisconsin and Minnesota which provide 277.5 MW of capacity. For 2016, PPAs provided approximately 34 MW of hydroelectric capacity. Additionally, the NSP System purchases approximately 725 MW of generation from Manitoba Hydro, which is sourced primarily from its fleet of hydroelectric facilities.

Wholesale and Commodity Marketing Operations

NSP-Minnesota conducts various wholesale marketing operations, including the purchase and sale of electric capacity, energy, ancillary services and energy-related products. NSP-Minnesota uses physical and financial instruments to minimize commodity price and credit risk and hedge sales and purchases. NSP-Minnesota also engages in trading activity unrelated to hedging and sharing of any margins is determined through state regulatory proceedings as well as the operation of the FERC approved joint operating agreement. NSP-Minnesota does not serve any wholesale requirements customers at cost-based regulated rates. See Item 7 for further discussion.

NSP-Wisconsin
Public Utility Regulation

Summary of Regulatory Agencies and Areas of Jurisdiction Retail rates, services and other aspects of NSP-Wisconsin’s operations are regulated by the PSCW and the MPSC, within their respective states. In addition, each of the state commissions certifies the need for new generating plants and electric transmission lines before the facilities may be sited and built. NSP-Wisconsin is subject to the jurisdiction of the FERC with respect to its wholesale electric operations, hydroelectric generation licensing, accounting practices, wholesale sales for resale, the transmission of electricity in interstate commerce, compliance with NERC electric reliability standards, asset transactions and mergers and natural gas transactions in interstate commerce. NSP-Wisconsin and NSP-Minnesota have been granted continued joint authorization from the FERC to make wholesale electric sales at market-based prices. NSP-Wisconsin is a transmission owning member of the MISO RTO.

The PSCW has a biennial base rate filing requirement. By June of each odd numbered year, NSP-Wisconsin must submit a rate filing for the test year beginning the following January. In recent years, NSP-Wisconsin has been submitting rate filings each year.


15

Table of Contents

Fuel and Purchased Energy Cost Recovery Mechanisms NSP-Wisconsin does not have an automatic electric fuel adjustment clause for Wisconsin retail customers. Instead, under Wisconsin rules, utilities submit a forward-looking annual fuel cost plan to the PSCW for approval. Once the PSCW approves the fuel cost plan, utilities defer the amount of any fuel cost under-collection or over-collection in excess of a two percent annual tolerance band, for future rate recovery or refund. Approval of a fuel cost plan and any rate adjustment for refund or recovery of deferred costs is determined by the PSCW after an opportunity for a hearing. Rate recovery of deferred fuel cost is subject to an earnings test based on the utility’s most recently authorized ROE. Fuel cost under-collections that exceed the two percent annual tolerance band for a calendar year may not be recovered if the utility earnings for that year exceed the authorized ROE.

NSP-Wisconsin’s retail electric rate schedules for Michigan customers include power supply cost recovery factors, which are based on 12-month projections. After each 12-month period, a reconciliation is submitted whereby over-collections are refunded and any under-collections are collected from the customers over the subsequent 12-month period.

Wisconsin Energy Efficiency Program In Wisconsin, the primary energy efficiency program is funded by the state’s utilities, but operated by independent contractors subject to oversight by the PSCW and the utilities. NSP-Wisconsin recovers these costs in rates charged to Wisconsin retail customers.

Capacity and Demand

NSP-Wisconsin operates an integrated system with NSP-Minnesota. See NSP-Minnesota Capacity and Demand.

Energy Sources and Related Transmission Initiatives

NSP-Wisconsin operates an integrated system with NSP-Minnesota. See NSP-Minnesota Energy Sources and Related Transmission Initiatives.

NSP-Wisconsin / American Transmission Company, LLC (ATC) - La Crosse to Madison, Wis. Transmission Line — In 2013, NSP-Wisconsin and ATC jointly filed an application with the PSCW for a CPCN for a new 345 KV transmission line that would extend from La Crosse, Wis. to Madison, Wis.  NSP-Wisconsin’s half of the line will be shared with three co-owners, Dairyland Power Cooperative, WPPI Energy and Southern Minnesota Municipal Power Agency-Wisconsin.

In 2015, the PSCW issued its order approving a CPCN and route for the project. Subsequently, the PSCW denied two requests for rehearing. Two groups have appealed the CPCN Order to county circuit court. Court action is pending in one remaining appeal and the CPCN remains in full effect unless one of the parties seeks and receives a stay from the court and posts a bond to cover damages the utilities may incur due to delay. The 180-mile project is expected to cost approximately $541 million. NSP-Wisconsin’s portion of the investment, which includes AFUDC, is estimated to be approximately $200 million. Updated forecast costs are primarily due to better material pricing than originally anticipated. Construction on the line began in January 2016, with completion anticipated by late 2018.

2016 Electric Fuel Cost Recovery — NSP-Wisconsin’s electric fuel costs for the year ended Dec. 31, 2016 were lower than authorized in rates and outside the two percent annual tolerance band established in the Wisconsin fuel cost recovery rules, primarily due to lower sales volume and lower purchased power costs coupled with moderate weather. Under the fuel cost recovery rules, NSP-Wisconsin may retain the amount of over-recovery up to two percent of authorized annual fuel costs, or approximately $3.4 million. However, NSP-Wisconsin must defer the amount of over-recovery in excess of the two percent annual tolerance band for future refund to customers. Accordingly, NSP-Wisconsin recorded a deferral of approximately $9.8 million through Dec. 31, 2016. In March 2017 NSP-Wisconsin will file a reconciliation of 2016 fuel costs with the PSCW. The amount of any potential refund is subject to review and approval by the PSCW, which is not expected until mid-2017.

Fuel Supply and Costs

NSP-Wisconsin operates an integrated system with NSP-Minnesota. See NSP-Minnesota Fuel Supply and Costs.

Wholesale and Commodity Marketing Operations

NSP-Wisconsin operates an integrated system with NSP-Minnesota. NSP-Wisconsin does not serve any wholesale requirements customers at cost-based regulated rates. See NSP-Minnesota Wholesale and Commodity Marketing Operations.


16

Table of Contents

PSCo
Public Utility Regulation

Summary of Regulatory Agencies and Areas of Jurisdiction PSCo is regulated by the CPUC with respect to its facilities, rates, accounts, services and issuance of securities. PSCo is regulated by the FERC with respect to its wholesale electric operations, accounting practices, hydroelectric licensing, wholesale sales for resale, the transmission of electricity in interstate commerce, compliance with the NERC electric reliability standards, asset transactions and mergers and natural gas transactions in interstate commerce. PSCo is authorized to make wholesale electric sales at market-based prices to customers outside its balancing authority area.

Fuel, Purchased Energy and Conservation Cost-Recovery Mechanisms — PSCo has several retail adjustment clauses that recover fuel, purchased energy and other resource costs:

ECA — Recovers fuel and purchased energy costs. Short-term sales margins are shared with retail customers through the ECA. The ECA is revised quarterly.
PCCA — Recovers purchased capacity payments.
SCA — Recovers the difference between PSCo’s actual cost of fuel and the amount of these costs recovered under its base steam service rates. The SCA rate is revised on a quarterly basis.
DSMCA — Recovers DSM, interruptible service option credit costs and performance initiatives for achieving various energy savings goals.
RESA — Recovers the incremental costs of compliance with the RES with a maximum of two percent of the customer’s total bill.
Wind Energy Service — Premium service for customers who choose to pay an additional charge for renewable resources.
TCA — Recovers costs associated with transmission investment outside of rate cases.
CACJA — Recovers costs associated with implementing its compliance plan under the CACJA.

PSCo recovers fuel and purchased energy costs from its wholesale electric customers through a fuel cost adjustment clause approved by the FERC. PSCo’s wholesale customers have agreed to pay the full cost of certain renewable energy purchase and generation costs through a fuel clause and in exchange receive RECs associated with those resources. The wholesale customers pay their jurisdictional allocation of production costs through a fully forecasted formula rate with true-up.

QSP Requirements The CPUC established an electric QSP that provides for bill credits to customers if PSCo does not achieve certain performance targets relating to electric reliability and customer service. PSCo monitors and records, as necessary, an estimated customer refund obligation under the QSP. The CPUC extended the terms of the current QSP through 2018.

Capacity and Demand

Uninterrupted system peak demand for PSCo’s electric utility for each of the last three years and the forecast for 2017, assuming normal weather conditions, is as follows:
 
System Peak Demand (in MW)
 
2014
 
2015
 
2016
 
2017 Forecast
PSCo
6,152

 
6,284

 
6,585

 
6,439


The peak demand for PSCo’s system typically occurs in the summer. The 2016 system peak demand for PSCo occurred on Aug. 3, 2016. The 2016 system peak demand was higher due to Comanche Unit 3 not running at full capacity, which increased PSCo’s system load for the backup power provided by PSCo to the joint owners. The forecast of system peak assumes normal weather conditions.

Energy Sources and Related Transmission Initiatives

PSCo expects to meet its system capacity requirements through existing electric generating stations, power purchases, new generation facilities, DSM options and phased expansion of existing generation at select power plants.


17

Table of Contents

Purchased Power PSCo has contracts to purchase power from other utilities and independent power producers. Long-term purchased power contracts typically require a periodic capacity charge and an energy charge for energy actually purchased. PSCo also makes short-term purchases to meet system load and energy requirements, to replace generation from company-owned units under maintenance or during outages, to meet operating reserve obligations, or to obtain energy at a lower cost.

Purchased Transmission Services In addition to using its own transmission system, PSCo has contracts with regional transmission service providers to deliver energy to PSCo’s customers.

Rush Creek Wind Ownership Proposal — In 2016, PSCo filed an application for a CPCN to build, own and operate a 600 MW wind generation facility at Rush Creek for a cost of approximately $1 billion, including transmission investment.

In 2016, the CPUC approved a settlement between PSCo and various parties and granted a CPCN, which allows PSCo to commence the project on a timely basis and capture the full PTC benefit for customers.

Key terms of the settlement are listed below:

The Rush Creek project satisfies the reasonable cost standard and is in the public interest;
The project should be placed in service by Oct. 31, 2018;
The useful life of the project should be set at 25 years;
A hard cost-cap on the $1.096 billion investment (which includes the capital investment and AFUDC); 
A capital cost sharing mechanism for every $10 million below the cost-cap, with 82.5 percent retained by customers and 17.5 percent retained by PSCo on a net present value basis over the life of the project;
Amounts retained by PSCo under the capital cost sharing mechanism as well as overall facility revenue requirements may each be reduced for lower than projected long term generating output (i.e., higher degradation);
The Pawnee-Daniels transmission line (estimated project cost of $178 million) should be accelerated and operations are expected to begin by October 2019; and
PSCo committed to develop a rate for third-party access to available capacity in the Rush Creek transmission line to be filed at the FERC.

Colorado 2016 ERP — In May 2016, PSCo filed its 2016 ERP which identified approximately 600 MW of additional resource needs by the summer of 2023; the level of resource need is driven by load growth, retiring generation facilities, expiring purchased power contracts and the impacts of customer-facing programs. In its initial filing, PSCo proposed a competitive acquisition process in which all generation resources, except coal-fired generation, could compete. PSCo has expressed an interest in owning incremental generation through self-build proposals, purchase of existing assets some of which are currently subject to PPAs or through build-own-transfer projects. In February 2017, the CPUC held hearings regarding PSCo’s proposal and an initial decision is anticipated by March 2017. The actual range of need to be filled in the competitive acquisition process will be determined once a final decision is received from the CPUC and prior to the beginning of the competitive acquisition phase of the ERP process.

Brush to Castle Pines 345 KV Transmission Line — In 2015, the CPUC granted a CPCN to construct a new 345 KV transmission line originating from Pawnee generating station, near Brush, CO to the Daniels Park substation, near Castle Pines, CO to be placed in service by May 2022. The estimated project cost is $178.3 million. The CPUC granted the parties’ requests for consolidation with the Rush Creek project and approved for construction to begin in the first half of 2017.

PSCo Global Settlement Agreement — In August 2016, PSCo and various intervenors entered into a global settlement agreement regarding three pending filings with the CPUC, including the Phase II electric rate case (which is related to the rate design portion of the 2015 Electric rate case), the Renewable*Connect proposal and the 2017 Renewable Energy Plan. Key terms of the agreement include that participating customers in the proposed Renewable*Connect program would pay ordinary tariff electric rates in addition to a voluntary tariff solar charge, and receive bill credits related to avoided cost savings for a new 50 MW solar resource. It was also agreed that PSCo’s 2017 Renewable Energy Plan would include 2017 to 2019 acquisition of a total of 225 MW of renewable energy from sources including rooftop solar, solar gardens and recycled energy.
In December 2016, the CPUC approved the global settlement agreement. In January 2017, PSCo began implementing the terms of the settlement.

18

Table of Contents

Joint Dispatch Agreement (JDA) — In February 2016, the FERC approved a JDA between PSCo, Black Hills/Colorado Electric Utility Company, LP and Platte River Power Authority. Through the JDA, energy is dispatched to economically serve the combined electric customer loads of the three systems. In circumstances where PSCo is the lowest cost producer, it will sell its excess generation to other JDA counterparties. The agreement results in a reduction in total energy costs for the parties, of which approximately $1.4 million would be allocated to PSCo’s customers. As part of the agreement, PSCo will earn a management fee to administer the JDA. In January 2017, the CPUC approved the JDA.

Advanced Grid Intelligence and Security In August 2016, PSCo filed a request with the CPUC to approve a CPCN for implementation of its advanced grid initiative. The project incorporates installing advanced meters, implementing a combination of hardware and software applications to allow the distribution system to operate at a lower voltage (integrated volt-var optimization) and installing necessary communications infrastructure to implement this hardware. These major projects are expected to improve customer experience, enhance grid reliability and enable the implementation of new and innovative programs and rate structures. The estimated capital investment for the project is approximately $500 million. PSCo anticipates a CPUC decision by mid-2017. If approval is received, the project is expected to be completed by 2021.

Decoupling Filing — In July 2016, PSCo filed a request with the CPUC to approve a partial decoupling mechanism for a five-year period, effective Jan. 1, 2017.  The proposed decoupling adjustment would allow PSCo to adjust annual revenues based on changes in weather normalized average use per customer for the residential and small C&I classes.  The proposed decoupling mechanism is symmetric and may result in potential refunds to customers if there were an increase in average use per customer. PSCo did not request that revenue be adjusted as a result of weather related sales fluctuations.

In January 2017, the CPUC Staff (Staff) and various intervenors, including the OCC, filed direct testimony. 

The Staff recommended a portion of PSCo’s request be approved and suggested the CPUC should lower PSCo’s ROE by 30 basis points to account for lower risk associated with annual revenues, if the full proposal were approved;
The OCC opposed PSCo’s decoupling request; and
Other intervening parties generally supported PSCo’s proposal, but recommended various modifications, such as the use of actual sales data instead of weather-normalized sales.

A CPUC decision is expected in April 2017.

Boulder, Colo. Municipalization In 2011, a ballot measure was passed which authorized the formation and operation of a municipal utility and the issuance of enterprise revenue bonds. In 2014, the City of Boulder (Boulder) City Council passed an ordinance to establish an electric utility. PSCo challenged the formation of this utility as premature because costs and system separation plans were not final, but the case was dismissed. PSCo appealed this decision and in September 2016, the Colorado Court of Appeals preserved PSCo’s ability to challenge the utility while vacating the lower court’s decision.

In 2013, the CPUC ruled that Boulder may not be the retail service provider to any PSCo customers located outside Boulder city limits unless Boulder can establish that PSCo is unwilling or unable to serve those customers. The CPUC also ruled that it has jurisdiction over the transfer of any facilities to Boulder that currently serve any customers located outside Boulder city limits and will determine separation matters. The CPUC has declared that Boulder must receive CPUC transfer approval prior to any eminent domain actions. Boulder appealed this ruling to the Boulder District Court. In January 2015, the Boulder District Court affirmed the CPUC decision. The Boulder District Court also dismissed a condemnation action that Boulder had filed. The CPUC must complete the separation plan proceeding before Boulder may refile a condemnation proceeding.

In July 2015, Boulder filed an application with the CPUC requesting approval of its proposed separation plan. In August 2015, PSCo filed a motion to dismiss Boulder’s separation proposal, arguing Boulder’s request was not permissible under Colorado law. In December 2015, the CPUC granted the motion to dismiss the application in part, holding that Boulder had no right to acquire PSCo facilities used exclusively to serve customers located outside Boulder city limits. Other portions of Boulder’s application were not dismissed, but were stayed until Boulder supplemented its application. Boulder filed its amended application in September 2016.


19

Table of Contents

In February 2017, PSCo and other intervenors filed answer testimony which addressed several legal issues posed by the CPUC. Overall, PSCo believes that Boulder’s plan is not consistent with and cannot be effectively administered under Colorado law and that from a reliability perspective it is an inappropriate way to separate the two distribution systems and poses significant risks to PSCo and its remaining customers. The remaining key dates in the procedural schedule are as follows:

Rebuttal testimony — March 30, 2017;
Hearings — April 26 through May 5, 2017;
Statements of position — May 17, 2017; and
Final decision — June 15, 2017.

Depreciation and Amortization Proceeding — In April 2016, PSCo filed for approval of depreciation rates and amortization schedules for its electric and common plant. In January 2017, the CPUC approved a comprehensive settlement agreement. The new depreciation and amortization rates are expected to be implemented in conjunction with PSCo’s next rate case or through a separate proceeding in 2018, with an expected annual increase of approximately $33 million.

RES Compliance Plan — Colorado law mandates that at least 20 percent of PSCo’s energy sales are supplied by renewable energy through 2019, with the percentage increasing to 30 percent by 2020 and includes a distributed generation standard. PSCo was in compliance with the RES as of Dec. 31, 2016.

Energy Source Statistics
 
Year Ended Dec. 31
 
2016
 
2015
 
2014
PSCo
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
Coal
15,895

 
47
%
 
18,601

 
54
%
 
18,274

 
53
%
Natural Gas
8,632

 
25

 
7,948

 
23

 
8,601

 
25

Wind (a)
8,106

 
24

 
6,699

 
19

 
6,472

 
19

Hydroelectric
1,179

 
3

 
662

 
2

 
617

 
2

Other (b)
393

 
1

 
705

 
2

 
294

 
1

Total
34,205

 
100
%
 
34,615

 
100
%
 
34,258

 
100
%
 
 
 
 
 
 
 
 
 
 
 
 
Owned generation
22,753

 
67
%
 
22,981

 
66
%
 
23,023

 
67
%
Purchased generation
11,452

 
33

 
11,634

 
34

 
11,235

 
33

Total
34,205

 
100
%
 
34,615

 
100
%
 
34,258

 
100
%
(a) 
This category includes wind energy de-bundled from RECs and also includes Windsource RECs. PSCo uses RECs to meet or exceed state resource requirements and may sell surplus RECs.
(b) 
Distributed generation from the Solar*Rewards program is not included, and was approximately 396, 245 and 197 million net KWh for 2016, 2015, and 2014, respectively.

Fuel Supply and Costs

The following table shows the delivered cost per MMBtu of each significant category of fuel consumed for owned electric generation, the percentage of total fuel requirements represented by each category of fuel and the total weighted average cost of all fuels.
 
 
Coal
 
Natural Gas
 
Weighted Average Owned Fuel Cost
PSCo Generating Plants
 
Cost
 
Percent
 
Cost
 
Percent
 
2016
 
$
1.75

 
72
%
 
$
3.79

 
28
%
 
$
2.33

2015
 
1.75

 
75

 
3.89

 
25

 
2.29

2014
 
1.82

 
75

 
5.32

 
25

 
2.68


See Items 1A and 7 for further discussion of fuel supply and costs.


20

Table of Contents

Fuel Sources

Coal  PSCo normally maintains approximately 41 days of coal inventory. Coal supply inventories at Dec. 31, 2016 and 2015 were approximately 36 and 49 days of usage, respectively. At Dec. 31, 2016, stockpile reductions in preparation for unit retirements at the Cherokee and Valmont stations in 2017 resulted in coal inventories being slightly below optimal levels. PSCo’s generation stations use low-sulfur western coal purchased primarily under contracts with suppliers operating in Colorado and Wyoming. During 2016 and 2015, PSCo’s coal requirements for existing plants were approximately 9.9 million tons and 10.5 million tons, respectively. The estimated coal requirements for 2017 are approximately 10.0 million tons. The increase is primarily due to higher expected natural gas prices in 2017.

PSCo has contracted for coal supply to provide 84 percent of its estimated coal requirements in 2017, and a declining percentage of requirements in subsequent years. PSCo’s general coal purchasing objective is to contract for approximately 80 percent of requirements for the first year, 50 percent of requirements in year two, and 25 percent of requirements in year three. Remaining requirements will be filled through the procurement process or over-the-counter transactions.

PSCo has coal transportation contracts that provide for delivery of 100 percent its coal requirements in 2017 and 2018. Coal delivery may be subject to interruptions or reductions due to operation of the mines, transportation problems, weather and availability of equipment.

Natural gas  PSCo uses both firm and interruptible natural gas supply and standby oil in combustion turbines and certain boilers. Natural gas supplies for PSCo’s power plants are procured under contracts to provide an adequate supply of fuel. However, as natural gas primarily serves intermediate and peak demand, any remaining forecasted requirements are able to be procured through a liquid spot market. The majority of natural gas supply under contract is covered by a long-term agreement with Anadarko Energy Services Company, the balance of natural gas supply contracts have variable pricing features tied to changes in various natural gas indices. PSCo hedges a portion of that risk through financial instruments. See Note 11 to the consolidated financial statements for further discussion.

Most transportation contract pricing is based on FERC approved transportation tariff rates. Certain natural gas supply and transportation agreements include obligations for the purchase and/or delivery of specified volumes of natural gas or to make payments in lieu of delivery.

At Dec. 31, 2016, PSCo’s commitments related to gas supply contracts, which expire in various years from 2017 through 2023, were approximately $654 million and commitments related to gas transportation and storage contracts, which expire in various years from 2017 through 2060, were approximately $573 million.
At Dec. 31, 2015, PSCo’s commitments related to gas supply contracts were approximately $750 million and commitments related to gas transportation and storage contracts were approximately $684 million.

PSCo has limited on-site fuel oil storage facilities and primarily relies on the spot market for incremental supplies.

Renewable Energy Sources

PSCo’s renewable energy portfolio includes wind, hydroelectric, biomass and solar power from both owned generating facilities and PPAs. As of Dec. 31, 2016, PSCo was in compliance with mandated RPS, which requires generation from renewable resources of 20.0 percent of electric retail sales.

Renewable energy comprised 28.3 percent and 22.0 percent of PSCo’s total energy for 2016 and 2015, respectively;
Wind energy comprised 23.7 percent and 19.4 percent of the total energy for 2016 and 2015, respectively; and
Hydroelectric, biomass and solar power comprised approximately 4.6 percent and 2.6 percent of the total energy for 2016 and 2015.

PSCo also offers customer-focused renewable energy initiatives. Windsource allows customers to purchase a portion or all of their electricity from renewable sources. In 2016, the number of customers utilizing Windsource increased to approximately 46,000 from 45,000 in 2015.


21

Table of Contents

Additionally, to encourage the growth of solar energy on the system, customers are offered incentives to install solar panels on their homes and businesses under the Solar*Rewards program. Over 32,500 PV systems with approximately 276 MW of aggregate capacity and over 29,500 PV systems with approximately 258 MW of aggregate capacity have been installed in Colorado under this program as of Dec. 31, 2016 and 2015, respectively. Additionally, 25 community solar gardens with 18.1 MW of capacity and 24 gardens with 16.6 MW of capacity have been completed in Colorado as of Dec. 31, 2016 and 2015, respectively.

Wind — PSCo acquires the majority of its wind energy from PPAs with wind farm owners, primarily located in Colorado. Currently, PSCo has 19 of these agreements in place, with facilities ranging in size from two MW to over 300 MW.

PSCo had approximately 2,560 MW of wind energy on its system at the end of 2016 and 2015. In addition to receiving purchased wind energy under these agreements, PSCo also typically receives wind RECs which are used to meet state renewable resource requirements.
The average cost per MWh of wind energy under these contracts was approximately $42 in 2016 and 2015. The cost per MWh of wind energy varies by contract and may be influenced by a number of factors including regulation, state-specific renewable resource requirements, and the year of contract execution. Generally, contracts executed in 2016 continued to benefit from improvements in wind technology, excess capacity among manufacturers, and motivation to commence new construction prior to the anticipated expiration of the federal PTCs. In December 2015, the federal PTCs were extended through 2019 with a phase down beginning in 2017.

Wholesale and Commodity Marketing Operations

PSCo conducts various wholesale marketing operations, including the purchase and sale of electric capacity, energy, ancillary services and energy related products. PSCo uses physical and financial instruments to minimize commodity price and credit risk and hedge sales and purchases. PSCo also engages in trading activity unrelated to hedging and sharing of any margins is determined through state regulatory proceedings as well as the operation of the FERC approved joint operating agreement. See Item 7 for further discussion.

SPS
Public Utility Regulation

Summary of Regulatory Agencies and Areas of Jurisdiction The PUCT and NMPRC regulate SPS’ retail electric operations and have jurisdiction over its retail rates and services and the construction of transmission or generation in their respective states. The municipalities in which SPS operates in Texas have original jurisdiction over SPS’ rates in those communities. Each municipality can deny SPS’ rate increases. SPS can then appeal municipal rate decisions to the PUCT, which hears all municipal rate denials in one hearing. The NMPRC also has jurisdiction over the issuance of securities. SPS is regulated by the FERC with respect to its wholesale electric operations, accounting practices, wholesale sales for resale, the transmission of electricity in interstate commerce, compliance with NERC electric reliability standards, asset transactions and mergers, and natural gas transactions in interstate commerce. As approved by the FERC, SPS operates within the SPP RTO and SPP IM wholesale market. SPS is authorized to make wholesale electric sales at market-based prices.

Fuel, Purchased Energy and Conservation Cost-Recovery Mechanisms SPS has several retail adjustment clauses that recover fuel, purchased energy and other resource costs:

DCRF — Recovers certain distribution costs in Texas that are not included in base rates.
EECRF — Recovers costs associated with providing energy efficiency programs in Texas.
EE rider — Recovers costs associated with providing energy efficiency programs in New Mexico.
FPPCAC — Adjusts monthly to recover the actual fuel and purchased power costs.
PCRF — Allows recovery of certain purchased power costs in Texas that are not included in base rates.
RPS — Recovers deferred costs associated with renewable energy programs in New Mexico.
TCRF — Recovers certain transmission infrastructure improvement costs and changes in wholesale transmission charges in Texas that are not included in base rates.

Fuel and purchased energy costs are recovered in Texas through a fixed fuel and purchased energy recovery factor, which is part of SPS’ retail electric tariff. SO2 and NOx allowance revenues and costs are also recovered through the fixed fuel and purchased energy recovery factor. The regulations allow retail fuel factors to change up to three times per year.


22

Table of Contents

The fixed fuel and purchased energy recovery factor provides for the over- or under-recovery of fuel and purchased energy expenses. Regulations also require refunding or surcharging over- or under- recovery amounts, including interest, when they exceed four percent of the utility’s annual fuel and purchased energy costs on a rolling 12-month basis, if this condition is expected to continue.

PUCT regulations require periodic examination of SPS’ fuel and purchased energy costs, the efficient use of fuel and purchased energy, fuel acquisition and management policies and purchased energy commitments. SPS is required to file an application for the PUCT to retrospectively review fuel and purchased energy costs at least every three years. In June 2016, SPS filed its fuel reconciliation application which reconciles fuel and purchased power costs for 2013 through 2015. In February 2017, an unopposed stipulation was reached which resolves all issues in this case. The stipulation is pending PUCT approval, which is expected in the first half of 2017.

Each New Mexico utility operating with a FPPCAC must periodically file an application for continued use. In October 2015, the NMPRC granted SPS authority to continue using its FPPCAC to collect its fuel and purchase power costs. SPS will be required to file a request for continuation of its FPPCAC by October 2019.

SPS recovers fuel and purchased energy costs from its wholesale customers through a monthly wholesale fuel and purchased economic energy cost adjustment clause accepted for filing by the FERC.

Capacity and Demand

Uninterrupted system peak demand for SPS for each of the last three years and the forecast for 2017, assuming normal weather conditions, is as follows:
 
System Peak Demand (in MW)
 
2014
 
2015
 
2016
 
2017 Forecast
SPS
4,871

 
4,678

 
4,836

 
4,484


The peak demand for the SPS system typically occurs in the summer. The 2016 system peak demand for SPS occurred on July 13, 2016. The 2016 peak demand increased due to warmer than normal July summer weather. The 2017 forecast assumes normal peak day weather. In addition, the partial requirement contract with Golden Spread ends May 2017, causing a lower 2017 forecast peak demand for SPS.

Energy Sources and Related Transmission Initiatives

SPS expects to use existing electric generating stations, power purchases, DSM and new generation options to meet its system capacity requirements.

Purchased Power SPS has contracts to purchase power from other utilities and independent power producers. Long-term purchased power contracts typically require a periodic capacity charge and an energy charge for energy actually purchased. SPS also makes short-term purchases to meet system load and energy requirements, to replace generation from company-owned units under maintenance or during outages, to meet operating reserve obligations or to obtain energy at a lower cost.

Purchased Transmission Services SPS has contractual arrangements with SPP and regional transmission service providers to deliver power and energy to its native load customers.

High Priority Incremental Load Study Report In 2014, the SPP Board of Directors approved the High Priority Incremental Load Study Report, a reliability assessment that evaluated the anticipated transmission needs of certain parts of the SPP region resulting from expected load growth. As a result of this study, SPS has received NTCs and conditional NTCs for 44 new transmission projects at an estimated cost of approximately $557 million to be placed into service by 2020. As of Dec. 31, 2016, 16 of these projects have been completed at an original estimated cost of $88 million. SPS is developing plans for the remaining 28 projects and submitting CCNs to the PUCT and the NMPRC. The original estimated cost for these remaining projects is $469 million. These projects are intended to provide regional reliability benefits as well as the ability to serve the increase in load in southeastern New Mexico.


23

Table of Contents

TUCO Substation to Yoakum County Substation to Hobbs Plant Substation 345 KV Transmission Line In March 2016, the PUCT approved SPS’ CCN for the 33-mile Yoakum County to Texas/New Mexico State line portion of this 345 KV line project. A CCN for the 111-mile TUCO to Yoakum County substation segment was filed in June 2016. Assuming approval of this CCN, this segment is scheduled to be in service in 2019. A 36-mile CCN for the Texas/New Mexico state line to Hobbs Plant segment is planned to be filed later in the first quarter of 2017. The estimated project cost for all three segments is approximately $242 million.

Hobbs Plant Substation to China Draw Substation 345 KV Transmission Line — In November 2016, the NMPRC approved SPS’ CCN for the Hobbs Plant to China Draw transmission line. The estimated project cost is approximately $163 million. The line is anticipated to be in service in 2018.

SPS Resource Plans — SPS was required to develop and implement a renewable portfolio plan by 2015, in which 15 percent of its energy to serve its New Mexico retail customers is produced by renewable resources.  The requirement was met through PPAs, including wind, solar and distributed generation. In 2020, the renewable resource production requirement increases to 20 percent. In addition, SPS indicated that it was evaluating water supply issues at its Tolk facility and if additional investment is required to operate the plant through its existing life. The Ogallala aquifer in this region of the country has depleted more rapidly than expected and SPS is currently seeking a permit for a horizontal well configuration pilot program that could help to delay the need for a more substantial investment solution. As a result of this issue and environmental issues currently facing the plant, SPS is seeking a decrease to the remaining useful life of the facility in its current New Mexico rate case proceeding (see Note 12).

Wholesale Customer Participation in ERCOT — In March 2016, the PUCT Staff requested comments on Lubbock Power & Light’s (LP&L’s) proposal to transition a portion of its load (approximately 430 MW on a peak basis) to the ERCOT in June 2019. LP&L’s proposal would result in an approximate seven percent reduction of load in SPS, or a loss of approximately $18 million in wholesale transmission revenue.  The remaining portion of LP&L’s load (approximately 170 MW) would continue to be served by SPS. Should LP&L join ERCOT, costs to SPS’ remaining customers would increase as SPS’ transmission costs would be spread across a smaller base of customers. 

The PUCT has indicated there will be a two-step process regarding LP&L’s possible transfer to ERCOT. The first step will be a proceeding to determine whether the proposed transfer is in the public interest and to consider certain protections for non-LP&L customers who would be affected by LP&L’s transfer. If the PUCT determines the transfer is in the public interest, the second step will be for LP&L to file a CCN application for transmission facilities to connect with ERCOT. The PUCT asked SPP and ERCOT to perform reliability and economic studies to better understand the implications of LP&L’s proposal. SPS intends to participate in the PUCT’s processes to protect its customers’ interests.

In May 2016, SPS submitted a filing to the FERC seeking approval to impose an Interconnection Switching Fee (exit fee) associated with LP&L’s proposal.  In September 2016, FERC dismissed SPS’ petition without prejudice to refile, finding the petition premature since LP&L has not made a final decision to move to ERCOT and the terms of the transition have not been determined.


24

Table of Contents

Energy Source Statistics
 
Year Ended Dec. 31
 
2016
 
2015
 
2014
SPS
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
Coal
10,990

 
39
%
 
12,441

 
44
%
 
12,770

 
48
%
Natural Gas
10,909

 
38

 
10,514

 
36

 
10,068

 
37

Wind (a)
6,120

 
22

 
5,252

 
19

 
3,762

 
14

Other (b)
347

 
1

 
150

 
1

 
180

 
1

Total
28,366

 
100
%
 
28,357

 
100
%
 
26,780

 
100
%
 
 
 
 
 
 
 
 
 
 
 
 
Owned generation
15,015

 
53
%
 
16,480

 
58
%
 
16,956

 
63
%
Purchased generation
13,351

 
47

 
11,877

 
42

 
9,824

 
37

Total
28,366

 
100
%
 
28,357

 
100
%
 
26,780

 
100
%
(a) 
This category includes wind energy de-bundled from RECs and also includes Windsource RECs. SPS uses RECs to meet or exceed state resource requirements and may sell surplus RECs.
(b) 
Distributed generation from the Solar*Rewards program is not included, was approximately 14, 13 and 10 million net KWh for 2016, 2015, and 2014, respectively.

Fuel Supply and Costs

The following table shows the delivered cost per MMBtu of each significant category of fuel consumed for owned electric generation, the percentage of total fuel requirements represented by each category of fuel and the total weighted average cost of all fuels.
 
 
Coal
 
Natural Gas
 
Weighted
Average Owned Fuel Cost
SPS Generating Plants
 
Cost
 
Percent
 
Cost
 
Percent
 
2016
 
$
2.12

 
70
%
 
$
2.81

 
30
%
 
$
2.32

2015
 
2.12

 
73

 
3.11

 
27

 
2.39

2014
 
2.07

 
71

 
4.76

 
29

 
2.85


See Items 1A and 7 for further discussion of fuel supply and costs.

Fuel Sources

Coal  SPS purchases all of the coal requirements for its two coal facilities, Harrington and Tolk electric generating stations, from TUCO. TUCO arranges for the purchase, receiving, transporting, unloading, handling, crushing, weighing and delivery of coal to meet SPS’ requirements. TUCO is responsible for negotiating and administering contracts with coal suppliers, transporters and handlers. The coal supply contract with TUCO expires in December 2017 for both Harrington and Tolk. SPS normally maintains approximately 43 days of coal inventory. As of Dec. 31, 2016 and 2015, coal inventories at SPS were approximately 64 and 76 days supply, respectively. At Dec. 31, 2016, milder weather, purchase commitments and relatively low natural gas prices resulted in coal inventories being above optimal levels. SPS’ generation stations primarily use low-sulfur western coal from mines operating in Wyoming. TUCO has coal agreements to supply 65 percent of SPS’ estimated coal requirements in 2017. SPS’ general coal purchasing objective is to contract for approximately 80 percent of requirements for the first year.

Natural gas  SPS uses both firm and interruptible natural gas supply and standby oil in combustion turbines and certain boilers. Natural gas for SPS’ power plants is procured under contracts to provide an adequate supply of fuel; which typically is purchased with terms of one year or less. The transportation and storage contracts expire in various years from 2017 to 2033. All of the natural gas supply contracts have variable pricing that is tied to various natural gas indices.

Most transportation contract pricing is based on FERC and Railroad Commission of Texas approved transportation tariff rates. Certain natural gas supply and transportation agreements include obligations for the purchase and/or delivery of specified volumes of natural gas or to make payments in lieu of delivery. SPS’ commitments related to gas supply contracts were approximately $17 million and $10 million and commitments related to gas transportation and storage contracts were approximately $161 million and $192 million at Dec. 31, 2016 and 2015, respectively.


25

Table of Contents

SPS has limited on-site fuel oil storage facilities and primarily relies on the spot market for incremental supplies.

Renewable Energy Sources

SPS’ renewable energy portfolio includes wind and solar power from both owned generating facilities and PPAs. As of Dec. 31, 2016, SPS is in compliance with mandated RPS, which require generation from renewable resources of 3.7 percent of Texas electric retail sales and 15.0 percent of New Mexico electric retail sales.

Renewable energy comprised 22.8 percent and 19.0 percent of SPS’ total energy for 2016 and 2015, respectively;
Wind energy comprised 21.6 percent and 18.5 percent of the total energy for 2016 and 2015, respectively; and
Solar power comprised approximately 1.2 percent and 0.5 percent of the total energy for 2016 and 2015, respectively.

SPS also offers customer-focused renewable energy initiatives. Windsource allows customers in New Mexico to purchase a portion or all of their electricity from renewable sources. The number of customers utilizing Windsource increased to approximately 900 in 2016 from 880 in 2015.

Additionally, to encourage the growth of solar energy on the system in New Mexico, customers are offered incentives to install solar panels on their homes and businesses under the Solar*Rewards program. Over 147 PV systems with approximately 8.1 MW of aggregate capacity and over 144 PV systems with approximately 8.0 MW of aggregate capacity have been installed in New Mexico under this program as of Dec. 31, 2016 and 2015, respectively.

Wind — SPS acquires its wind energy from IPP contracts and QF tariffs with wind farm owners, primarily located in the Texas Panhandle area of Texas and New Mexico.  SPS currently has 24 of these agreements in place, with facilities ranging in size from under two MW to 250 MW for a total capacity greater than 1,500 MW.

SPS had approximately 1,500 MW and 1,755 MW of wind energy on its system at the end of 2016 and 2015, respectively. This decrease is primarily due to the timing of supplier contracts expiring. In addition to receiving purchased wind energy under these agreements, SPS also typically receives wind RECs, which are used to meet state renewable resource requirements. 
The average cost per MWh of wind energy under the IPP contracts and QF tariffs was approximately $25 and $24 for 2016 and 2015, respectively.  The cost per MWh of wind energy varies by contract and may be influenced by a number of factors including regulation, state-specific renewable resource requirements and the year of contract execution.  Generally, contracts executed in 2016 continued to benefit from improvements in technology, excess capacity among manufacturers, and motivation to commence new construction prior to the anticipated expiration of the federal PTCs. In December 2016, the federal PTCs were extended through 2019 with a phase down beginning in 2017.

Wholesale and Commodity Marketing Operations

SPS conducts various wholesale marketing operations, including the purchase and sale of electric capacity, energy, ancillary services and energy related products. SPS uses physical and financial instruments to minimize commodity price and credit risk and hedge sales and purchases. See Item 7 for further discussion.

Summary of Recent Federal Regulatory Developments

The FERC has jurisdiction over rates for electric transmission service in interstate commerce and electricity sold at wholesale, hydro facility licensing, natural gas transportation, asset transactions and mergers, accounting practices and certain other activities of Xcel Energy Inc.’s utility subsidiaries and transmission-only subsidiaries, including enforcement of NERC mandatory electric reliability standards. State and local agencies have jurisdiction over many of Xcel Energy Inc.’s utility subsidiaries’ activities, including regulation of retail rates and environmental matters. In addition to the matters discussed below, see Note 12 to the accompanying consolidated financial statements for a discussion of other regulatory matters.

Status of FERC Commissioners — The FERC is comprised of five commissioners appointed by the President and subject to confirmation by the Senate. There are today only two sitting commissioners.  It is uncertain when the President will appoint new commissioners to the open seats or when those appointments may be confirmed.  Without three sitting commissioners, the FERC will not have a quorum to act on contested matters. The lack of a quorum could affect the timing of FERC decisions on proposed rules or pending, newly submitted and future filings involving, among other things, contested electric rate matters and CPCNs for construction of interstate natural gas pipeline facilities to serve the utility subsidiaries.  

26

Table of Contents


FERC Order, ROE Policy — The FERC has adopted a two-step ROE methodology for electric utilities. The issue of how to apply the FERC ROE methodology is being contested in various complaint proceedings. There are two ROE complaints against the MISO TOs, which include NSP-Minnesota and NSP-Wisconsin. In September 2016, the FERC issued an order in the first MISO ROE complaint, which upheld the initial decision made by the ALJ in December 2015, establishing an ROE of 10.32 percent for the period Nov. 12, 2013 to Feb. 11, 2015, and prospectively. The second complaint is pending FERC action after issuance of an initial decision by the ALJ in June 2016, recommending an ROE of 9.7 percent for the period Feb. 12, 2015 to May 11, 2016. The FERC is expected to issue an order in the second litigated MISO ROE complaint proceeding during 2017. See Note 12 to the consolidated financial statements for discussion of the MISO ROE Complaints.

NERC Critical Infrastructure Protection Requirements — The FERC has approved Version 5 of NERC’s critical infrastructure protection standards, which added additional requirements to strengthen grid security controls. Xcel Energy applied the requirements to high and medium impact assets by the July 1, 2016 deadline. Requirements must be applied to low impact assets through a staggered implementation beginning April 1, 2017 through September 2018. Xcel Energy is currently in the process of implementing initiatives to meet the compliance deadline. The additional cost for compliance is anticipated to be recoverable through rates.

NERC Physical Security Requirements — In 2014, the FERC approved NERC’s proposed critical infrastructure protection standard related to physical security for bulk electric system facilities. The new standard became enforceable in October 2015 with staggered milestone deliverable dates through 2016. Xcel Energy has developed physical security plans in accordance with the requirements of the standard. The additional cost for compliance is anticipated to be recoverable through rates.

Formula Rate Treatment of Accumulated Deferred Income Taxes (ADIT) — In 2015, NSP-Minnesota, NSP-Wisconsin, SPS and PSCo filed changes to their transmission formula rates and PSCo filed changes to its production formula rate to comply with IRS guidance regarding how ADIT must be reflected in formula rates using future test years and a true-up. The filings were intended to ensure that NSP-Minnesota, NSP-Wisconsin, PSCo and SPS are in compliance with IRS rules and may continue to use accelerated tax depreciation. Each filing requested a Jan. 1, 2016 effective date.

In 2015, the FERC partially accepted and partially rejected the proposed NSP-Minnesota and NSP-Wisconsin transmission formula rate changes. In September 2016, the FERC clarified their order, but required NSP-Minnesota and NSP-Wisconsin to submit a new tariff change filing to implement the treatment of ADIT in the formula rate true-up. In November 2016, NSP-Minnesota and NSP-Wisconsin filed the changes proposing a Jan. 1, 2017 effective date, but requesting authority to calculate the 2016 true-up pursuant to the new ADIT tariff provisions. In December 2016, the FERC issued an order which approved the tariff revisions, effective Jan. 1, 2017, but rejected the portion of their application related to the 2016 true-up.

In April 2016, the FERC accepted the SPS and PSCo ADIT formula rate changes, effective Jan. 1, 2016, subject to a compliance filing. In August 2016, the FERC approved PSCo and SPS’ compliance filings.

Xcel Energy believes its wholesale formula rates are in compliance with the IRS ADIT rules.

Public Utility Regulatory Policies Act (PURPA) Enforcement Complaint against CPUC In December 2016, Sustainable Power Group, LLC (sPower) petitioned the FERC to initiate an enforcement action in federal court against the CPUC under PURPA. The petition asserts that a December 2016 CPUC ruling, which indicated that a QF must be a successful bidder in a PSCo resource acquisition bidding process, violated PURPA and FERC rules. In January 2017, PSCo filed a motion to intervene and protest, arguing that the FERC should decline the petition. The CPUC filed a similar pleading. sPower has proposed to construct 800 MW of solar generation and 700 MW of wind generation in Colorado and seeks to require PSCo to contract for these resources under PURPA. If sPower were to prevail, PSCo’s ability to select generation resources through competitive bidding would be negatively affected. FERC action is pending.


27

Table of Contents

Electric Operating Statistics

Electric Sales Statistics
 
Year Ended Dec. 31
 
2016
 
2015
 
2014
Electric sales (Millions of KWh)
 
 
 
 
 
Residential
24,726

 
24,498

 
24,857

Large C&I
27,664

 
27,719

 
27,657

Small C&I
35,830

 
35,806

 
36,022

Public authorities and other
1,103

 
1,071

 
1,104

Total retail
89,323

 
89,094

 
89,640

Sales for resale
18,694

 
15,283

 
14,931

Total energy sold
108,017

 
104,377

 
104,571

 
 
 
 
 
 
Number of customers at end of period
 
 
 
 
 
Residential
3,053,732

 
3,023,494

 
2,994,075

Large C&I
1,228

 
1,229

 
1,128

Small C&I
432,012

 
429,617

 
426,289

Public authorities and other
68,935

 
68,595

 
68,306

Total retail
3,555,907

 
3,522,935

 
3,489,798

Wholesale
52

 
47

 
44

Total customers
3,555,959

 
3,522,982

 
3,489,842

 
 
 
 
 
 
Electric revenues (Thousands of Dollars)
 
 
 
 
 
Residential
$
2,965,681

 
$
2,891,371

 
$
2,956,576

Large C&I
1,706,546

 
1,689,695

 
1,789,742

Small C&I
3,327,562

 
3,303,838

 
3,382,750

Public authorities and other
140,464

 
136,730

 
143,442

Total retail
8,140,253

 
8,021,634

 
8,272,510

Wholesale
693,101

 
660,590

 
795,425

Other electric revenues
666,427

 
593,762

 
397,955

Total electric revenues
$
9,499,781

 
$
9,275,986

 
$
9,465,890

 
 
 
 
 
 
KWh sales per retail customer
25,120

 
25,290

 
25,686

Revenue per retail customer
$
2,289

 
$
2,277

 
$
2,370

Residential revenue per KWh

11.99
¢
 

11.80
¢
 

11.89
¢
Large C&I revenue per KWh
6.17

 
6.10

 
6.47

Small C&I revenue per KWh
9.29

 
9.23

 
9.39

Total retail revenue per KWh
9.11

 
9.00

 
9.23

Wholesale revenue per KWh
3.71

 
4.32

 
5.33


28

Table of Contents

Energy Source Statistics
 
Year Ended Dec. 31
 
2016
 
2015
 
2014
Xcel Energy
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
 
Millions of
KWh
 
Percent of
Generation
Coal
40,566

 
36
%
 
47,003

 
43
%
 
49,123

 
46
%
Natural Gas
27,351

 
25

 
25,151

 
23

 
22,071

 
21

Wind (a)
22,123

 
20

 
18,186

 
17

 
16,478

 
15

Nuclear
14,191

 
13

 
12,895

 
12

 
13,503

 
12

Hydroelectric
4,435

 
4

 
4,001

 
4

 
4,203

 
4

Other (b)
2,167

 
2

 
1,456

 
1

 
1,795

 
2

Total
110,833

 
100
%
 
108,692

 
100
%
 
107,173

 
100
%
 
 
 
 
 
 
 
 
 
 
 
 
Owned generation
74,149

 
67
%
 
73,279

 
67
%
 
73,620

 
69
%
Purchased generation
36,684

 
33

 
35,413

 
33

 
33,553

 
31

Total
110,833

 
100
%
 
108,692

 
100
%
 
107,173

 
100
%
(a) 
This category includes wind energy de-bundled from RECs and also includes Windsource RECs. Xcel Energy uses RECs to meet or exceed state resource requirements and may sell surplus RECs.
(b) 
Includes energy from other sources, including solar, biomass, oil and refuse. Distributed generation from the Solar*Rewards program is not included, and was approximately 430, 266 and 222 million net KWh for 2016, 2015 and 2014, respectively.

NATURAL GAS UTILITY OPERATIONS

Overview

The most significant developments in the natural gas operations of the utility subsidiaries are uncertainty regarding political and regulatory developments that impact hydraulic fracturing, safety requirements for natural gas pipelines and the continued trend of declining use per residential and small C&I customer, as a result of improved building construction technologies, higher appliance efficiencies and conservation. From 2000 to 2016, average annual sales to the typical residential customer declined 18 percent, while sales to the typical small C&I customer declined 12 percent, each on a weather-normalized basis. Although wholesale price increases do not directly affect earnings because of natural gas cost-recovery mechanisms, high prices can encourage further efficiency efforts by customers.

The Pipeline and Hazardous Materials Safety Administration

Protecting our Infrastructure of Pipelines and Enhancing Safety Act (PIPES) Act The PIPES Act, signed into law in June 2016, requires the DOT PHMSA to issue regulations on the construction and operation of the nation’s underground gas storage fields. The act also grants PHMSA emergency order authority for pipeline operators, which would require operators to make immediate changes to assets or operations. The act also directs PHMSA to continue work on a variety of mandates from the 2012 Pipeline Safety, Regulatory Certainty, and Job Creation Act (Pipeline Safety Act), many of which have not been completed.

PHMSA issued interim final rules for underground storage operators in December 2016. PSCo operates three underground storage fields in Colorado and PSCo is developing a plan to meet the storage rules. PSCo does not expect these changes to have a material impact on costs or operating reliability.

Pipeline Safety Act The Pipeline Safety Act requires additional verification of pipeline infrastructure records by pipeline owners and operators to confirm the maximum allowable operating pressure of lines located in high consequence areas or more-densely populated areas. The DOT PHMSA will require operators to re-confirm the maximum allowable operating pressure if records are inadequate. This process could cause temporary or permanent limitations on throughput for affected pipelines.


29

Table of Contents

In addition, the Pipeline Safety Act requires PHMSA to issue reports and develop new regulations including: requiring use of automatic or remote-controlled shut-off valves; requiring testing of certain previously untested transmission lines; and expanding integrity management requirements. The Pipeline Safety Act also raises the maximum penalty for violating pipeline safety rules to $2 million per day for related violations. Xcel Energy is taking actions that are intended to comply with the Pipeline Safety Act and any related PHMSA regulations as they become effective. Xcel Energy cannot predict the ultimate impact the Pipeline Safety Act will have on its costs, operations or financial results. PSCo and NSP-Minnesota can generally recover costs to comply with the transmission and distribution integrity management programs through the PSIA and GUIC riders, respectively.

NSP-Minnesota
Public Utility Regulation

Summary of Regulatory Agencies and Areas of Jurisdiction Retail rates, services and other aspects of NSP-Minnesota’s retail natural gas operations are regulated by the MPUC and the NDPSC within their respective states. The MPUC has regulatory authority over security issuances, certain property transfers, mergers with other utilities and transactions between NSP-Minnesota and its affiliates. In addition, the MPUC reviews and approves NSP-Minnesota’s natural gas supply plans for meeting customers’ future energy needs. NSP-Minnesota is subject to the jurisdiction of the FERC with respect to certain natural gas transactions in interstate commerce. NSP-Minnesota is subject to the DOT, the Minnesota Office of Pipeline Safety, the NDPSC and the SDPUC for pipeline safety compliance, including pipeline facilities used in electric utility operations for fuel deliveries.

Purchased Gas and Conservation Cost-Recovery Mechanisms NSP-Minnesota’s retail natural gas rates for Minnesota and North Dakota include a PGA clause that provides for prospective monthly rate adjustments to reflect the forecasted cost of purchased natural gas, transportation service and storage service. The annual difference between the natural gas cost revenues collected through PGA rates and the actual natural gas costs is collected or refunded over the subsequent 12-month period.

NSP-Minnesota also recovers costs associated with transmission and distribution pipeline integrity management programs through its GUIC rider. Costs recoverable under the GUIC rider include funding for pipeline assessments as well as deferred costs from NSP-Minnesota’s existing sewer separation and pipeline integrity management programs. The MPUC and NDPSC have the authority to disallow recovery of certain costs if they find the utility was not prudent in its procurement activities.

Minnesota state law requires utilities to invest 0.5 percent of their state natural gas revenues in CIP. These costs are recovered through customer base rates and an annual cost-recovery mechanism for the CIP expenditures.

Capability and Demand

Natural gas supply requirements are categorized as firm or interruptible (customers with an alternate energy supply). The maximum daily send-out (firm and interruptible) for NSP-Minnesota was 800,232 MMBtu, which occurred on Jan. 18, 2016 and 774,044 MMBtu, which occurred on Jan. 12, 2015.

NSP-Minnesota purchases natural gas from independent suppliers, generally based on market indices that reflect current prices. The natural gas is delivered under transportation agreements with interstate pipelines. These agreements provide for firm deliverable pipeline capacity of 624,123 MMBtu per day. In addition, NSP-Minnesota contracts with providers of underground natural gas storage services. These agreements provide storage for approximately 26 percent of winter natural gas requirements and 29 percent of peak day firm requirements of NSP-Minnesota.

NSP-Minnesota also owns and operates one LNG plant with a storage capacity of 2.0 Bcf equivalent and three propane-air plants with a storage capacity of 1.3 Bcf equivalent to help meet its peak requirements. These peak-shaving facilities have production capacity equivalent to 246,000 MMBtu of natural gas per day, or approximately 30 percent of peak day firm requirements. LNG and propane-air plants provide a cost-effective alternative to annual fixed pipeline transportation charges to meet the peaks caused by firm space heating demand on extremely cold winter days.

NSP-Minnesota is required to file for a change in natural gas supply contract levels to meet peak demand, to redistribute demand costs among classes, or to exchange one form of demand for another. In February 2016, the MPUC approved NSP-Minnesota’s contract demand levels for the 2015 through 2016 heating season. Demand levels for the 2016 through 2017 heating season were approved by the MPUC in February 2017.


30

Table of Contents

Natural Gas Supply and Costs

NSP-Minnesota actively seeks natural gas supply, transportation and storage alternatives to yield a diversified portfolio that provides increased flexibility, decreased interruption and financial risk and economical rates. In addition, NSP-Minnesota conducts natural gas price hedging activity that has been approved by the MPUC.

The following table summarizes the average delivered cost per MMBtu of natural gas purchased for resale by NSP-Minnesota’s regulated retail natural gas distribution business:
2016
$
3.47

2015
4.07

2014
6.17


The cost of natural gas in 2016 decreased due to lower wholesale commodity prices.

NSP-Minnesota has firm natural gas transportation contracts with several pipelines, which expire in various years from 2017 through 2033.

NSP-Minnesota has certain natural gas supply, transportation and storage agreements that include obligations for the purchase and/or delivery of specified volumes of natural gas or to make payments in lieu of delivery. At Dec. 31, 2016, NSP-Minnesota was committed to approximately $528 million in such obligations under these contracts.

NSP-Minnesota purchases firm natural gas supply utilizing long-term and short-term agreements from approximately 29 domestic and Canadian suppliers. This diversity of suppliers and contract lengths allows NSP-Minnesota to maintain competition from suppliers and minimize supply costs.

See Items 1A and 7 for further discussion of natural gas supply and costs.

NSP-Wisconsin
Public Utility Regulation

Summary of Regulatory Agencies and Areas of Jurisdiction NSP-Wisconsin is regulated by the PSCW and the MPSC. The PSCW has a biennial base-rate filing requirement. By June of each odd-numbered year, NSP-Wisconsin must submit a rate filing for the test year period beginning the following January. NSP-Wisconsin is subject to the jurisdiction of the FERC with respect to certain natural gas transactions in interstate commerce. NSP-Wisconsin is subject to the DOT, the PSCW and the MPSC for pipeline safety compliance.

Natural Gas Cost-Recovery Mechanisms NSP-Wisconsin has a retail PGA cost-recovery mechanism for Wisconsin operations to recover the actual cost of natural gas and transportation and storage services. The PSCW has the authority to disallow certain costs if it finds NSP-Wisconsin was not prudent in its procurement activities.

NSP-Wisconsin’s natural gas rate schedules for Michigan customers include a natural gas cost-recovery factor, which is based on 12-month projections.

Capability and Demand

Natural gas supply requirements are categorized as firm or interruptible (customers with an alternate energy supply). The maximum daily send-out (firm and interruptible) for NSP-Wisconsin was 155,583 MMBtu, which occurred on Jan. 18, 2016, and 158,719 MMBtu, which occurred on Jan. 7, 2015.

NSP-Wisconsin purchases natural gas from independent suppliers, generally based on market indices that reflect current prices. The natural gas is delivered under transportation agreements with interstate pipelines. These agreements provide for firm deliverable pipeline capacity of approximately 140,143 MMBtu per day. In addition, NSP-Wisconsin contracts with providers of underground natural gas storage services. These agreements provide storage for approximately 32 percent of winter natural gas requirements and 34 percent of peak day firm requirements of NSP-Wisconsin.


31

Table of Contents

NSP-Wisconsin also owns and operates one LNG plant with a storage capacity of 270,000 Mcf equivalent and one propane-air plant with a storage capacity of 2,700 Mcf equivalent to help meet its peak requirements. These peak-shaving facilities have production capacity equivalent to 18,408 MMBtu of natural gas per day, or approximately 12 percent of peak day firm requirements. LNG and propane-air plants provide a cost-effective alternative to annual fixed pipeline transportation charges to meet the peaks caused by firm space heating demand on extremely cold winter days.

NSP-Wisconsin is required to file a natural gas supply plan with the PSCW annually to change natural gas supply contract levels to meet peak demand. NSP-Wisconsin’s winter 2016-2017 supply plan was approved by the PSCW in October 2016.

Natural Gas Supply and Costs

NSP-Wisconsin actively seeks natural gas supply, transportation and storage alternatives to yield a diversified portfolio that provides increased flexibility, decreased interruption and financial risk and economical rates. In addition, NSP-Wisconsin conducts natural gas price hedging activity that has been approved by the PSCW.

The following table summarizes the average delivered cost per MMBtu of natural gas purchased for resale by NSP-Wisconsin’s regulated retail natural gas distribution business:
2016
$
3.62

2015
4.11

2014
6.52


The cost of natural gas in 2016 decreased due to lower wholesale commodity prices.

The cost of natural gas supply, transportation service and storage service is recovered through various cost-recovery adjustment mechanisms. NSP-Wisconsin has firm natural gas transportation contracts with several pipelines, which expire in various years from 2017 through 2029.

NSP-Wisconsin has certain natural gas supply, transportation and storage agreements that include obligations for the purchase and/or delivery of specified volumes of natural gas or to make payments in lieu of delivery. At Dec. 31, 2016, NSP-Wisconsin was committed to approximately $103 million in such obligations under these contracts.

NSP-Wisconsin purchased firm natural gas supply utilizing long-term and short-term agreements from approximately nine domestic and Canadian suppliers. This diversity of suppliers and contract lengths allows NSP-Wisconsin to maintain competition from suppliers and minimize supply costs.

See Items 1A and 7 for further discussion of natural gas supply and costs.

PSCo
Public Utility Regulation

Summary of Regulatory Agencies and Areas of Jurisdiction PSCo is regulated by the CPUC with respect to its facilities, rates, accounts, services and issuance of securities. PSCo holds a FERC certificate that allows it to transport natural gas in interstate commerce without PSCo becoming subject to full FERC jurisdiction under the Federal Natural Gas Act. PSCo is subject to the DOT and the CPUC with regards to pipeline safety compliance.

Purchased Natural Gas and Conservation Cost-Recovery Mechanisms PSCo has retail adjustment clauses that recover purchased natural gas and other resource costs:

GCA — Recovers the actual costs of purchased natural gas and transportation to meet the requirements of its customers and is revised quarterly to allow for changes in natural gas rates.
DSMCA — Recovers costs of DSM and performance initiatives to achieve various energy savings goals.
PSIA — Recovers costs associated with transmission and distribution pipeline integrity management programs and two projects to replace large transmission pipelines. The rider has been extended through 2018.


32

Table of Contents

QSP Requirements — The CPUC established a natural gas QSP that provides for bill credits to customers if PSCo does not achieve certain performance targets relating to natural gas leak repair time and customer service. The CPUC has extended the terms of the QSP through 2018.

Capability and Demand

Natural gas supply requirements are categorized as firm or interruptible (customers with an alternate energy supply). The maximum daily send-out (firm and interruptible) for PSCo was 1,932,070 MMBtu, which occurred on Dec. 17, 2016 and 1,633,493 MMBtu, which occurred on March 4, 2015.

PSCo purchases natural gas from independent suppliers, generally based on market indices that reflect current prices. The natural gas is delivered under transportation agreements with interstate pipelines. These agreements provide for firm deliverable pipeline capacity of approximately 1,818,151 MMBtu per day, which includes 854,852 MMBtu of natural gas held under third-party underground storage agreements. In addition, PSCo operates three company-owned underground storage facilities, which provide approximately 43,500 MMBtu of natural gas supplies on a peak day. The balance of the quantities required to meet firm peak day sales obligations are primarily purchased at PSCo’s city gate meter stations.

PSCo is required by CPUC regulations to file a natural gas purchase plan each year projecting and describing the quantities of natural gas supplies, upstream services and the costs of those supplies and services for the 12-month period of the following year. PSCo is also required to file a natural gas purchase report by October of each year reporting actual quantities and costs incurred for natural gas supplies and upstream services for the previous 12-month period.

Natural Gas Supply and Costs

PSCo actively seeks natural gas supply, transportation and storage alternatives to yield a diversified portfolio that provides increased flexibility, decreased interruption and financial risk and economical rates. In addition, PSCo conducts natural gas price hedging activities that have been approved by the CPUC.

The following table summarizes the average delivered cost per MMBtu of natural gas purchased for resale by PSCo’s regulated retail natural gas distribution business:
2016
$
3.27

2015
3.92

2014
4.91


The cost of natural gas in 2016 decreased due to lower wholesale commodity prices.

PSCo has natural gas supply, transportation and storage agreements that include obligations for the purchase and/or delivery of specified volumes of natural gas or to make payments in lieu of delivery. At Dec. 31, 2016, PSCo was committed to approximately $884 million in such obligations under these contracts, which expire in various years from 2017 through 2029.

PSCo purchases natural gas by optimizing a balance of long-term and short-term natural gas purchases, firm transportation and natural gas storage contracts. During 2016, PSCo purchased natural gas from approximately 32 suppliers.

See Items 1A and 7 for further discussion of natural gas supply and costs.

SPS
Natural Gas Facilities Used for Electric Generation

SPS does not provide retail natural gas service, but purchases and transports natural gas for certain of its generation facilities and operates natural gas pipeline facilities connecting the generation facilities to interstate natural gas pipelines. SPS is subject to the jurisdiction of the FERC with respect to certain natural gas transactions in interstate commerce; and to the jurisdiction of the PHMSA and the PUCT for pipeline safety compliance.

See Items 1A and 7 for further discussion of natural gas supply and costs.


33

Table of Contents

Natural Gas Operating Statistics
 
Year Ended Dec. 31
 
2016
 
2015
 
2014
Natural gas deliveries (Thousands of MMBtu)
 
 
 
 
 
Residential
132,853

 
135,394

 
152,269

C&I
84,082

 
86,093

 
95,879

Total retail
216,935

 
221,487

 
248,148

Transportation and other
133,498

 
125,263

 
124,000

Total deliveries
350,433

 
346,750

 
372,148

 
 
 
 
 
 
Number of customers at end of period
 
 
 
 
 
Residential
1,835,507

 
1,814,321

 
1,795,190

C&I
157,286

 
156,306

 
155,515

Total retail
1,992,793

 
1,970,627

 
1,950,705

Transportation and other
7,316

 
6,981

 
6,594

Total customers
2,000,109

 
1,977,608

 
1,957,299

 
 
 
 
 
 
Natural gas revenues (Thousands of Dollars)
 
 
 
 
 
Residential
$
929,889

 
$
1,042,884

 
$
1,320,207

C&I
468,977

 
547,165

 
727,071

Total retail
1,398,866

 
1,590,049

 
2,047,278

Transportation and other
132,546

 
82,032

 
95,460

Total natural gas revenues
$
1,531,412

 
$
1,672,081

 
$
2,142,738

 
 
 
 
 
 
MMBtu sales per retail customer
108.86

 
112.39

 
127.21

Revenue per retail customer
$
702

 
$
807

 
$
1,050

Residential revenue per MMBtu
7.00

 
7.70

 
8.67

C&I revenue per MMBtu
5.58

 
6.36

 
7.58

Transportation and other revenue per MMBtu
0.99

 
0.65

 
0.77


GENERAL

Seasonality

The demand for electric power and natural gas is affected by seasonal differences in the weather. In general, peak sales of electricity occur in the summer months, and peak sales of natural gas occur in the winter months. As a result, the overall operating results may fluctuate substantially on a seasonal basis. Additionally, Xcel Energy’s operations have historically generated less revenues and income when weather conditions are milder in the winter and cooler in the summer. See Item 7 for further discussion.

Competition

Xcel Energy is a vertically integrated utility in all of its jurisdictions, subject to traditional cost-of-service regulation by state public utilities commissions. However, Xcel Energy is subject to different public policies that promote competition and the development of energy markets. Xcel Energy’s industrial and large commercial customers have the ability to own or operate facilities to generate their own electricity. In addition, customers may have the option of substituting other fuels, such as natural gas, steam or chilled water for heating, cooling and manufacturing purposes, or the option of relocating their facilities to a lower cost region. Customers also have the opportunity to supply their own power with solar generation (depending on jurisdiction, rooftop solar or solar gardens) and in most jurisdictions can currently avoid paying for most of the fixed production, transmission and distribution costs incurred to serve them. Several states have policies designed to promote the development of solar and other distributed energy resources through significant incentive policies; with these incentives and federal tax subsidies, distributed generating resources are potential competitors to Xcel Energy’s electric service business.


34

Table of Contents

The FERC has continued to promote competitive wholesale markets through open access transmission and other means. As a result, Xcel Energy Inc.’s utility subsidiaries and their wholesale customers can purchase the output from generation resources of competing wholesale suppliers and use the transmission systems of the utility subsidiaries on a comparable basis to serve their native load. State public utilities commissions have created resource planning programs that promote competition in the acquisition of electricity generation resources used to provide service to retail customers. In addition, FERC Order 1000 seeks to establish competition for construction and operation of certain new electric transmission facilities. Xcel Energy Inc.’s utility subsidiaries also have franchise agreements with certain cities subject to periodic renewal. If a city elected not to renew the franchise agreement, it could seek alternative means for its citizens to access electric power or gas, such as municipalization. While each of Xcel Energy Inc.’s utility subsidiaries faces these challenges, Xcel Energy believes their rates and services are competitive with currently available alternatives.

ENVIRONMENTAL MATTERS

Xcel Energy’s facilities are regulated by federal and state environmental agencies. These agencies have jurisdiction over air emissions, water quality, wastewater discharges, solid wastes and hazardous substances. Various company activities require registrations, permits, licenses, inspections and approvals from these agencies. Xcel Energy has received all necessary authorizations for the construction and continued operation of its generation, transmission and distribution systems. Xcel Energy’s facilities have been designed and constructed to operate in compliance with applicable environmental standards. However, it is not possible to determine when or to what extent additional facilities or modifications of existing or planned facilities will be required as a result of changes to environmental regulations, interpretations or enforcement policies or what effect future laws or regulations may have upon Xcel Energy’s operations. See Item 7 and Notes 12 and 13 to the consolidated financial statements for further discussion.

There are significant present and future environmental regulations to encourage the use of clean energy technologies and regulate emissions of GHGs to address climate change. Xcel Energy has undertaken a number of initiatives to meet current requirements and prepare for potential future regulations, reduce GHG emissions and respond to state renewable and energy efficiency goals. If these future environmental regulations do not provide credit for the investments we have already made to reduce GHG emissions, or if they require additional initiatives or emission reductions, then their requirements would potentially impose additional substantial costs. Xcel Energy believes, based on prior state commission practice, it would recover the cost of these initiatives through rates.

Xcel Energy is committed to addressing climate change and potential climate change regulation through efforts to reduce its GHG emissions in a balanced, cost-effective manner. Xcel Energy adopted a methodology for calculating CO2 emissions based on the reporting protocols of The Climate Registry, a nonprofit organization that provides and compiles GHG emissions data from reporting entities. Starting in 2011, Xcel Energy began reporting GHG emissions to the EPA under the EPA’s mandatory GHG Reporting Program.

Based on The Climate Registry’s current reporting protocol, Xcel Energy estimated that its current electric generating portfolio emitted approximately 53.0 million and 56.6 million tons of CO2 in 2016 and 2015, respectively. Xcel Energy also estimated emissions associated with electricity purchased for resale to Xcel Energy customers from generation facilities owned by third parties. Xcel Energy estimates these non-owned facilities emitted approximately 9.0 million and 10.2 million tons of CO2 in 2016 and 2015, respectively. Estimated total CO2 emissions associated with service to Xcel Energy electric customers decreased by 4.9 million tons in 2016 compared to 2015, and this decrease in emissions was associated with an increase of 2.1 million net MWh of generation in 2016 compared to 2015. Since 2012, the average annual decrease in CO2 emissions is approximately 2.8 million tons of CO2 per year.

CAPITAL SPENDING AND FINANCING

See Item 7 for a discussion of expected capital expenditures and funding sources.

EMPLOYEES

As of Dec. 31, 2016, Xcel Energy had 11,440 full-time employees and 72 part-time employees, of which 5,428 were covered under collective-bargaining agreements. See Note 9 to the consolidated financial statements for further discussion.


35

Table of Contents


EXECUTIVE OFFICERS

Ben Fowke, 58, Chairman of the Board, President and Chief Executive Officer and Director, Xcel Energy Inc., August 2011 to present. Chief Executive Officer, NSP-Minnesota, NSP-Wisconsin, PSCo, and SPS, January 2015 to present. Previously, President and Chief Operating Officer, Xcel Energy Inc., August 2009 to August 2011.

Christopher B. Clark, 50, President and Director, NSP-Minnesota, January 2015 to present. Previously, Regional Vice President, Rates and Regulatory Affairs, NSP-Minnesota, October 2012 to December 2014; Managing Director, Government and Regulatory Affairs, NSP-Minnesota, January 2012 to October 2012; Managing Attorney, Xcel Energy Inc., November 2007 to January 2012.

David L. Eves, 58, President and Director, PSCo, January 2015 to present. Previously, President, Director and Chief Executive Officer, PSCo, December 2009 to December 2014.

Robert C. Frenzel, 46, Executive Vice President, Chief Financial Officer, Xcel Energy Inc., May 2016 to present.  Previously, Senior Vice President and Chief Financial Officer, Luminant, a subsidiary of Energy Future Holdings Corp., an electric utility and power generation company, February 2012 to April 2016; Senior Vice President for Corporate Development, Strategy and Mergers and Acquisitions, Energy Future Holdings Corp., February 2009 to February 2012.  In April 2014, Energy Future Holdings Corp., the majority of its subsidiaries, including Texas Competitive Energy Holdings (TCEH) the parent company of Luminant, filed a voluntary bankruptcy petition under Chapter 11 of the United States Bankruptcy Code.  TCEH emerged from Chapter 11 in October 2016. 

David T. Hudson, 56, President and Director, SPS, January 2015 to present. Previously, President, Director and Chief Executive Officer, SPS, January 2014 to December 2014; Director, Community Service & Economic Development, SPS, April 2011 to January 2014; Director, Strategic Planning, SPS, May 2008 to April 2011.

Kent T. Larson, 57, Executive Vice President and Group President Operations, Xcel Energy Inc., January 2015 to present. Previously, Senior Vice President, Group President Operations, Xcel Energy Services Inc., August 2014 to December 2014; Senior Vice President Operations, Xcel Energy Services Inc., September 2011 to August 2014; Chief Energy Supply Officer, Xcel Energy Services Inc., March 2010 to September 2011.

Marvin E. McDaniel, Jr., 57, Executive Vice President, Group President, Utilities, and Chief Administrative Officer, Xcel Energy Inc., January 2015 to present. Previously, Senior Vice President, Chief Administrative Officer, Xcel Energy Inc., August 2012 to December 2014; Senior Vice President and Chief Administrative Officer, Xcel Energy Services Inc., September 2011 to August 2012; Vice President and Chief Administrative Officer, Xcel Energy Services Inc., August 2009 to September 2011 and Vice President, Talent and Technology Business Areas, Xcel Energy Services Inc., August 2009 to September 2011.

Timothy O’Connor, 57, Senior Vice President, Chief Nuclear Officer, Xcel Energy Services Inc., February 2013 to present. Previously, Acting Chief Nuclear Officer, NSP-Minnesota, September 2012 to February 2013; Vice President, Engineering and Nuclear Regulatory Compliance and Licensing July 2012 to September 2012; Monticello Site Vice President, May 2007 to July 2012.

Judy M. Poferl, 57, Senior Vice President, Corporate Secretary and Executive Services, Xcel Energy Inc., January 2015 to present. Previously, Vice President, Corporate Secretary, Xcel Energy Inc., May 2013 to December 2014; President, Director and Chief Executive Officer, NSP-Minnesota, August 2009 to May 2013.

Jeffrey S. Savage, 45, Senior Vice President, Controller, Xcel Energy Inc., January 2015 to present. Previously, Vice President, Controller, Xcel Energy Inc., September 2011 to December 2014; Senior Director, Financial Reporting, Corporate and Technical Accounting, Xcel Energy Services Inc., December 2009 to September 2011.

Mark E. Stoering, 56, President and Director, NSP-Wisconsin, January 2015 to present. Previously, President, Director and Chief Executive Officer, NSP-Wisconsin, January 2012 to December 2014; Vice President, Portfolio Strategy and Business Development, Xcel Energy Services Inc., August 2000 to December 2011.

Scott M. Wilensky, 60, Executive Vice President, General Counsel, Xcel Energy Inc., January 2015 to present. Previously, Senior Vice President, General Counsel, Xcel Energy Inc., September 2011 to December 2014; Vice President, Regulatory and Resource Planning, Xcel Energy Services Inc., September 2009 to September 2011.

No family relationships exist between any of the executive officers or directors.

36

Table of Contents


Item 1A — Risk Factors

Xcel Energy is subject to a variety of risks, many of which are beyond our control. Important risks that may adversely affect the business, financial condition and results of operations are further described below. These risks should be carefully considered together with the other information set forth in this report and in future reports that Xcel Energy files with the SEC.

Oversight of Risk and Related Processes

A key accountability of the Board of Directors is the oversight of material risk, and our Board of Directors employs an effective process for doing so. Management and each Board of Directors’ committee has responsibility for overseeing the identification and mitigation of key risks and reporting its assessments and activities to the full Board of Directors.

Management identifies and analyzes risks to determine materiality and other attributes such as timing, probability and controllability. Management broadly considers our business, the utility industry, the domestic and global economies and the environment when identifying, assessing, managing and mitigating risk. Identification and analysis occurs formally through a key risk assessment process conducted by senior management, the financial disclosure process, the hazard risk management process and internal auditing and compliance with financial and operational controls. Management also identifies and analyzes risk through its business planning process and development of goals and key performance indicators, which include risk identification to determine barriers to implementing Xcel Energy’s strategy. The business planning process also identifies areas in which there is a potential for a business area to take inappropriate risk to meet goals, and determines how to prevent inappropriate risk-taking.

At a threshold level, Xcel Energy has developed a robust compliance program and promotes a culture of compliance, including tone at the top, which mitigates risk. The process for risk mitigation includes adherence to our code of conduct and other compliance policies, operation of formal risk management structures and groups and overall business management to mitigate the risks inherent in the implementation strategy. Building on this culture of compliance, Xcel Energy manages and further mitigates risks through operation of formal risk management structures and groups, including management councils, risk committees and the services of internal corporate areas such as internal audit, the corporate controller and legal services.

Management communicates regularly with the Board of Directors and key stakeholders regarding risk. Senior management presents a periodic assessment of key risks to the Board of Directors. The presentation and the discussion of the key risks provides the Board of Directors with information on the risks management believes are material, including the earnings impact, timing, likelihood and controllability. Management also provides information to the Board of Directors in presentations and communications over the course of the year.

The Board of Directors approaches oversight, management and mitigation of risk as an integral and continuous part of its governance of Xcel Energy. First, the Board of Directors regularly reviews management’s key risk assessment and analyzes areas of existing and future risks and opportunities. In addition, the Board of Directors assigns oversight of certain critical risks to each of its four standing committees to ensure these risks are well understood and given focused oversight by the appropriate committee. The Audit Committee is responsible for reviewing the adequacy of risk oversight and affirming that appropriate oversight occurs. New risks are considered and assigned as appropriate during the annual Board of Directors’ and committee evaluation process, and committee charters and annual work plans are updated accordingly. Committees regularly report on their oversight activities and certain risk issues may be brought to the full Board of Directors for consideration where deemed appropriate to ensure broad Board of Directors’ understanding of the nature of the risk. Finally, the Board of Directors conducts an annual strategy session where Xcel Energy’s future plans and initiatives are reviewed and confirmed.
 

37

Table of Contents

Risks Associated with Our Business

Environmental Risks

We are subject to environmental laws and regulations, with which compliance could be difficult and costly.

We are subject to environmental laws and regulations that affect many aspects of our past, present and future operations, including air emissions, water quality, wastewater discharges and the generation, transport and disposal of solid wastes and hazardous substances. These laws and regulations require us to obtain and comply with a wide variety of environmental requirements including those for protected natural and cultural resources (such as wetlands, endangered species and other protected wildlife, and archaeological and historical resources), licenses, permits, inspections and other approvals. Environmental laws and regulations can also require us to restrict or limit the output of certain facilities or the use of certain fuels, shift generation to lower-emitting, but potentially more costly facilities, install pollution control equipment at our facilities, clean up spills and other contamination and correct environmental hazards. Environmental regulations may also lead to shutdown of existing facilities, either due to the difficulty in assuring compliance or that the costs of compliance makes operation of the units no longer economical. Both public officials and private individuals may seek to enforce the applicable environmental laws and regulations against us. We may be required to pay all or a portion of the cost to remediate (i.e., clean-up) sites where our past activities, or the activities of certain other parties, caused environmental contamination. At Dec. 31, 2016, these sites included:

Sites of former MGPs operated by our subsidiaries, predecessors or other entities; and
Third party sites, such as landfills, for which we are alleged to be a PRP that sent hazardous materials and wastes.

We are also subject to mandates to provide customers with clean energy, renewable energy and energy conservation offerings. Failure to meet the requirements of these mandates may result in fines or penalties, which could have a material effect on our results of operations. If our regulators do not allow us to recover all or a part of the cost of capital investment or the O&M costs incurred to comply with the mandates, it could have a material effect on our results of operations, financial position or cash flows.

In addition, existing environmental laws or regulations may be revised, and new laws or regulations may be adopted or become applicable to us, including but not limited to, regulation of mercury, NOx, SO2, CO2 and other GHGs, particulates, cooling water intakes, water discharges and ash management. We may also incur additional unanticipated obligations or liabilities under existing environmental laws and regulations.

We are subject to physical and financial risks associated with climate change.

Climate change can create physical and financial risk. Physical risks from climate change can include changes in weather conditions, changes in precipitation and extreme weather events.

Our customers’ energy needs vary with weather conditions, primarily temperature and humidity. For residential customers, heating and cooling represent their largest energy use. To the extent weather conditions are affected by climate change, customers’ energy use could increase or decrease. Increased energy use due to weather changes may require us to invest in additional generating assets, transmission and other infrastructure to serve increased load. Decreased energy use due to weather changes may result in decreased revenues. Extreme weather conditions in general require more system backup, adding to costs, and can contribute to increased system stress, including service interruptions. Weather conditions outside of our service territory could also have an impact on our revenues. We buy and sell electricity depending upon system needs and market opportunities. Extreme weather conditions creating high energy demand may raise electricity prices, which would increase the cost of energy we provide to our customers.

Severe weather impacts our service territories, primarily when thunderstorms, tornadoes and snow or ice storms occur. To the extent the frequency of extreme weather events increases, this could increase our cost of providing service. Changes in precipitation resulting in droughts or water shortages, whether caused by climate change or otherwise, could adversely affect our operations, principally our fossil generating units. A negative impact to water supplies due to long-term drought conditions could adversely impact our ability to provide electricity to customers, as well as increase the price they pay for energy. We may not recover all costs related to mitigating these physical and financial risks.


38

Table of Contents

Climate change may impact a region’s economic health, which could impact our revenues. Our financial performance is tied to the health of the regional economies we serve. The price of energy has an impact on the economic health of our communities. The cost of additional regulatory requirements, such as regulation of CO2 emissions under the CAA, or additional environmental regulation could impact the availability of goods and prices charged by our suppliers which would normally be borne by consumers through higher prices for energy and purchased goods. To the extent financial markets view climate change and emissions of GHGs as a financial risk, this could negatively affect our ability to access capital markets or cause us to receive less than ideal terms and conditions.

Financial Risks

Our profitability depends in part on the ability of our utility subsidiaries to recover their costs from their customers and there may be changes in circumstances or in the regulatory environment that impair the ability of our utility subsidiaries to recover costs from their customers.

We are subject to comprehensive regulation by federal and state utility regulatory agencies. The utility commissions in the states where we operate regulate many aspects of our utility operations, including siting and construction of facilities, customer service and the rates that we can charge customers. The FERC has jurisdiction, among other things, over wholesale rates for electric transmission service, the sale of electric energy in interstate commerce and certain natural gas transactions in interstate commerce.

The profitability of our utility operations is dependent on our ability to recover the costs of providing energy and utility services to our customers and earn a return on our capital investment. Our utility subsidiaries provide service at rates approved by one or more regulatory commissions. These rates are generally regulated and based on an analysis of the utility’s costs incurred in a test year. Our utility subsidiaries are subject to both future and historical test years depending upon the regulatory mechanisms approved in each jurisdiction. Thus, the rates a utility is allowed to charge may or may not match its costs at any given time. While rate regulation is premised on providing an opportunity to earn a reasonable rate of return on invested capital, in a continued low interest rate environment there has been pressure pushing down ROE. There can also be no assurance that the applicable regulatory commission will judge all the costs of our utility subsidiaries to have been prudent, which could result in cost disallowances, or that the regulatory process in which rates are determined will always result in rates that will produce full recovery of such costs. Changes in the long-term cost-effectiveness or changes to the operating conditions of our assets may result in early retirements and while regulation typically provides relief for these types of changes, there is no assurance that regulators would allow full recovery of all remaining costs leaving all or a portion of these asset costs stranded. Rising fuel costs could increase the risk that our utility subsidiaries will not be able to fully recover their fuel costs from their customers. Furthermore, there could be changes in the regulatory environment that would impair the ability of our utility subsidiaries to recover costs historically collected from their customers.

Management currently believes these prudently incurred costs are recoverable given the existing regulatory mechanisms in place. However, adverse regulatory rulings or the imposition of additional regulations could have an adverse impact on our results of operations and hence could materially and adversely affect our ability to meet our financial obligations, including debt payments and the payment of dividends on our common stock.

Any reductions in our credit ratings could increase our financing costs and the cost of maintaining certain contractual relationships.

We cannot be assured that any of our current ratings or our subsidiaries’ ratings will remain in effect for any given period of time, or that a rating will not be lowered or withdrawn entirely by a rating agency. In addition, our credit ratings may change as a result of the differing methodologies or change in the methodologies used by the various rating agencies. Any downgrade could lead to higher borrowing costs. Also, our utility subsidiaries may enter into certain procurement and derivative contracts that require the posting of collateral or settlement of applicable contracts if credit ratings fall below investment grade.


39

Table of Contents

We are subject to capital market and interest rate risks.

Utility operations require significant capital investment. As a result, we frequently need to access capital markets. Any disruption in capital markets could have a material impact on our ability to fund our operations. Capital markets are global in nature and are impacted by numerous issues and events throughout the world economy. Capital market disruption events and resulting broad financial market distress could prevent us from issuing new securities or cause us to issue securities with less than ideal terms and conditions, such as higher interest rates.

Higher interest rates on short-term borrowings with variable interest rates could also have an adverse effect on our operating results. Changes in interest rates may also impact the fair value of the debt securities in the nuclear decommissioning fund and master pension trust, as well as our ability to earn a return on short-term investments of excess cash.

We are subject to credit risks.

Credit risk includes the risk that our customers will not pay their bills, which may lead to a reduction in liquidity and an increase in bad debt expense. Credit risk is comprised of numerous factors including the price of products and services provided, the overall economy and local economies in the geographic areas we serve, including local unemployment rates.

Credit risk also includes the risk that various counterparties that owe us money or product will breach their obligations. Should the counterparties to these arrangements fail to perform, we may be forced to enter into alternative arrangements. In that event, our financial results could be adversely affected and we could incur losses.

One alternative available to address counterparty credit risk is to transact on liquid commodity exchanges. The credit risk is then socialized through the exchange central clearinghouse function. While exchanges do remove counterparty credit risk, all participants are subject to margin requirements, which create an additional need for liquidity to post margin as exchange positions change value daily. The Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) requires broad clearing of financial swap transactions through a central counterparty, which could lead to additional margin requirements that would impact our liquidity. However, we have taken advantage of an exception to mandatory clearing afforded to commercial end-users who are not classified as a major swap participant. The Board of Directors has authorized Xcel Energy and its subsidiaries to take advantage of this end-user exception.

We may at times have direct credit exposure in our short-term wholesale and commodity trading activity to various financial institutions trading for their own accounts or issuing collateral support on behalf of other counterparties. We may also have some indirect credit exposure due to participation in organized markets, such as SPP, PJM, MISO and ERCOT, in which any credit losses are socialized to all market participants.

We do have additional indirect credit exposures to various domestic and foreign financial institutions in the form of letters of credit provided as security by power suppliers under various long-term physical purchased power contracts. If any of the credit ratings of the letter of credit issuers were to drop below the designated investment grade rating stipulated in the underlying long-term purchased power contracts, the supplier would need to replace that security with an acceptable substitute. If the security were not replaced, the party could be in technical default under the contract, which would enable us to exercise our contractual rights.

Increasing costs associated with our defined benefit retirement plans and other employee benefits may adversely affect our results of operations, financial position or liquidity.

We have defined benefit pension and postretirement plans that cover most of our employees. Assumptions related to future costs, return on investments, interest rates and other actuarial assumptions, including mortality tables, have a significant impact on our funding requirements related to these plans. These estimates and assumptions may change based on economic conditions, actual stock and bond market performance, changes in interest rates and changes in governmental regulations. In addition, the Pension Protection Act changed the minimum funding requirements for defined benefit pension plans with modifications that allowed additional flexibility in the timing of contributions. Therefore, our funding requirements and related contributions may change in the future. Also, the payout of a significant percentage of pension plan liabilities in a single year due to high retirements or employees leaving Xcel Energy could trigger settlement accounting and could require Xcel Energy to recognize material incremental pension expense related to unrecognized plan losses in the year these liabilities are paid.


40

Table of Contents

Increasing costs associated with health care plans may adversely affect our results of operations.

Our self-insured costs of health care benefits for eligible employees have increased in recent years. Increasing levels of large individual health care claims and overall health care claims could have an adverse impact on our operating results, financial position and liquidity. We believe that our employee benefit costs, including costs related to health care plans for our employees and former employees, will continue to rise. Changes in industry standards utilized by management in key assumptions (e.g., mortality tables) could have a significant impact on future liabilities and benefit costs. Legislation related to health care could also significantly change our benefit programs and costs.

We must rely on cash from our subsidiaries to make dividend payments.

We are a holding company and our investments in our subsidiaries are our primary assets. Substantially all of our operations are conducted by our subsidiaries. Consequently, our operating cash flow and our ability to service our indebtedness and pay dividends depends upon the operating cash flows of our subsidiaries and the payment dividends to us. Our subsidiaries are separate legal entities that have no obligation to pay any amounts due pursuant to our obligations or to make any funds available for dividends on our common stock. In addition, each subsidiary’s ability to pay dividends to us depends on any statutory and/or contractual restrictions which may include requirements to maintain minimum levels of equity ratios, working capital or assets. Also, our utility subsidiaries are regulated by various state utility commissions, which possess broad powers to ensure that the needs of the utility customers are being met.

If our utility subsidiaries were to cease making dividend payments, our ability to pay dividends on our common stock or otherwise meet our financial obligations could be adversely affected.

Changes in federal tax law may significantly impact our business.

There are a number of provisions in federal tax law designed to incentivize capital investments which have benefited our customers by keeping rates lower than without such provisions. Examples of these include the use of accelerated and bonus depreciation for most of our capital investments, PTCs for wind energy, investment tax credits for solar energy and research and development tax credits and deductions. Changes to current federal tax law have the ability to benefit or adversely affect our earnings and our customer costs. Significant changes in corporate tax rates could result in the impairment of deferred tax assets that are established based on existing law. Changes to the value of various tax credits could change the economics of resources and our resource selections. While regulation allows us to incorporate changes in tax law into the rate-setting process, there could be timing delays before realization of the changes.

Operational Risks

We are subject to commodity risks and other risks associated with energy markets and energy production.

We engage in wholesale sales and purchases of electric capacity, energy and energy-related products as well as natural gas. As a result we are subject to market supply and commodity price risk. Commodity price changes can affect the value of our commodity trading derivatives. We mark certain derivatives to estimated fair market value on a daily basis (mark-to-market accounting). Actual settlements can vary significantly from estimated fair values recorded, and significant changes from the assumptions underlying our fair value estimates could cause significant earnings variability.

If we encounter market supply shortages or our suppliers are otherwise unable to meet their contractual obligations, we may be unable to fulfill our contractual obligations to our customers at previously anticipated costs. Therefore, a significant disruption could cause us to seek alternative supply services at potentially higher costs or suffer increased liability for unfulfilled contractual obligations. Any significantly higher energy or fuel costs relative to corresponding sales commitments could have a negative impact on our cash flows and potentially result in economic losses. Potential market supply shortages may not be fully resolved through alternative supply sources and may cause short-term disruptions in our ability to provide electric and/or natural gas services to our customers. The impact of these cost and reliability issues vary in magnitude for each operating subsidiary depending upon unique operating conditions such as generation fuels mix, availability of water for cooling, availability of fuel transportation including rail shipments of coal, electric generation capacity, transmission, natural gas pipeline capacity, etc.


41

Table of Contents

Our subsidiary, NSP-Minnesota, is subject to the risks of nuclear generation.

NSP-Minnesota’s two nuclear stations, PI and Monticello, subject it to the risks of nuclear generation, which include:

The risks associated with use of radioactive material in the production of energy, the management, handling, storage and disposal and the current lack of a long-term disposal solution for radioactive materials;
Limitations on the amounts and types of insurance available to cover losses that might arise in connection with nuclear operations; and
Uncertainties with respect to the technological and financial aspects of decommissioning nuclear plants at the end of their licensed lives. For example, similar to pensions, interest rate and other assumptions regarding decommissioning costs may change based on economic conditions and changes in the expected life of the asset may cause our funding obligations to change.

The NRC has authority to impose licensing and safety-related requirements for the operation of nuclear generation facilities. In the event of non-compliance, the NRC has the authority to impose fines and/or shut down a unit until compliance is achieved. Revised NRC safety requirements could necessitate substantial capital expenditures or a substantial increase in operating expenses. In addition, the Institute for Nuclear Power Operations reviews NSP-Minnesota’s nuclear operations and nuclear generation facilities. Compliance with the Institute for Nuclear Power Operations’ recommendations could result in substantial capital expenditures or a substantial increase in operating expenses.

If an incident did occur, it could have a material effect on our results of operations or financial condition. Furthermore, the non-compliance of other nuclear facilities operators or the occurrence of a serious nuclear incident at other facilities could result in increased regulation of the industry, which could then increase NSP-Minnesota’s compliance costs and impact the results of operations of its facilities.

NSP-Wisconsin’s production and transmission system is operated on an integrated basis with NSP-Minnesota’s production and transmission system, and NSP-Wisconsin may be subject to risks associated with NSP-Minnesota’s nuclear generation.

Our utility operations are subject to long-term planning risks.

Most electric utility investments are long-lived and are planned to be used for decades. Transmission and generation investments typically have long lead times, and therefore are planned well in advance of when they are brought in-service subject to long-term resource plans. These plans are based on numerous assumptions over the planning horizon such as: sales growth, customer usage, economic activity, costs, regulatory mechanisms, customer behavior, available technology and public policy. The electric utility sector is undergoing a period of significant change. For example, public policy has driven increases in appliance and lighting efficiency and energy efficient buildings, wider adoption and lower cost of renewable generation and distributed generation, including community solar gardens and customer-sited solar, shifts away from coal generation to decrease CO2 emissions and increasing use of natural gas in electric generation driven by lower natural gas prices. Over time, customer adoption of these technologies and increased energy efficiency could result in excess transmission and generation resources as well as stranded costs if Xcel Energy is not able to fully recover the costs and investments. These changes also introduce additional uncertainty into long-term planning which gives rise to a risk that the magnitude and timing of resource additions and growth in customer demand may not coincide, and that the preference for the types of additions may change from planning to execution. In addition, we are also subject to longer-term availability of the natural resource inputs such as coal, natural gas, uranium and water to cool our facilities. Lack of availability of these resources during the planning period could jeopardize long-term operations of our facilities or make them uneconomic to operate.

The resource plans reviewed and approved by our state regulators assume continuation of the traditional utility cost of service model under which utility costs are recovered from customers as they receive the benefit of service. Xcel Energy is engaged in significant and ongoing infrastructure investment programs to accommodate distributed generation and maintain high system reliability. Xcel Energy is also investing in renewable and natural gas-fired generation to reduce our CO2 emissions profile. The inability of coal mining companies to attract capital could disrupt longer-term supplies. Early plant retirements that may result from these changes could expose us to premature financial obligations, which could result in less than full recovery of all remaining costs. Both decreasing use per customer driven by appliance and lighting efficiency and the availability of cost-effective distributed generation puts downward pressure on load growth. This could lead to under recovery of costs, excess resources to meet customer demand and increases in electric rates.


42

Table of Contents

Our natural gas and electric transmission and distribution operations involve numerous risks that may result in accidents and other operating risks and costs.

Our natural gas transmission and distribution activities include a variety of inherent hazards and operating risks, such as leaks, explosions and mechanical problems, which could cause substantial financial losses. Our electric transmission and distribution activities also include inherent hazards and operating risks such as contact, fire and widespread outages which could cause substantial financial losses. In addition, these natural gas and electric risks could result in loss of human life, significant damage to property, environmental pollution, impairment of our operations and substantial losses to us. We maintain insurance against some, but not all, of these risks and losses.

The occurrence of any of these events not fully covered by insurance could have a material effect on our financial position and results of operations. For our natural gas transmission or distribution lines located near populated areas, the level of potential damages resulting from these risks is greater.

Additionally, for natural gas the operating or other costs that may be required in order to comply with potential new regulations, including the Pipeline Safety Act, could be significant. The Pipeline Safety Act requires verification of pipeline infrastructure records by pipeline owners and operators to confirm the maximum allowable operating pressure of lines located in high consequence areas or more-densely populated areas. We have programs in place to comply with the Pipeline Safety Act and for systematic infrastructure monitoring and renewal over time. A significant incident could increase regulatory scrutiny and result in penalties and higher costs of operations.

Public Policy Risks

We may be subject to legislative and regulatory responses to climate change and emissions, with which compliance could be difficult and costly.

Increased public awareness and concern regarding climate change may result in more state, regional and/or federal requirements to reduce or mitigate the effects of GHGs. Legislative and regulatory responses related to climate change and new interpretations of existing laws through climate change litigation create financial risk as our electric generating facilities may be subject to additional regulation at either the state or federal level in the future. Such regulations could impose substantial costs on our system. International agreements could have an impact to the extent they lead to future federal or state regulations.

In 2015, the 21st Conference of the Parties to the United Nations Framework Convention on Climate Change reached consensus among 190 nations on an agreement (the Paris Agreement) that establishes a framework for GHG mitigation actions by all countries (“nationally determined contributions”), with a goal of holding the increase in global average temperature to below 2o Celsius above pre-industrial levels and an aspiration to limit the increase to 1.5o Celsius. If implemented, the Paris Agreement could result in future additional GHG reductions in the United States.

We have been, and in the future may be, subject to climate change lawsuits. An adverse outcome in any of these cases could require substantial capital expenditures and could possibly require payment of substantial penalties or damages. Defense costs associated with such litigation can also be significant. Such payments or expenditures could affect results of operations, cash flows and financial condition if such costs are not recovered through regulated rates.

The EPA has proposed the CPP, which would regulate GHGs from power plants by mandating state plans to achieve state-specific emission reduction goals. The legality of the CPP has been challenged in the courts, and the Supreme Court stayed the rule while those challenges proceed. If the rule is ultimately implemented, uncertainties remain regarding implementation plans, including available opportunities to reduce costs, availability of emission trading, how states will allocate the reduction burden among utilities, what actions are creditable and the indirect impact of carbon regulation on natural gas and coal prices.

Some states have indicated a desire to continue to pursue climate policies even in the absence of federal mandates. All of the steps that Xcel Energy has taken to date to reduce GHG emissions, including energy efficiency measures, adding renewable generation or retiring or converting coal plants to natural gas, occurred under state-endorsed resource plans, renewable energy standards and other state policies. While those actions likely would have put Xcel Energy in a good position to meet federal standards under the CPP or the Paris Agreement, repeal of these policies would not impact those state-endorsed actions and plans.


43

Table of Contents

Whether under state or federal programs, an important factor is our ability to recover the costs incurred to comply with any regulatory requirements in a timely manner. If our regulators do not allow us to recover all or a part of the cost of capital investment or the O&M costs incurred to comply with the mandates, it could have a material effect on our results of operations.

We are also subject to a significant number of proposed and potential rules that will impact our coal-fired and other generation facilities. These include rules associated with emissions of SO2 and NOx, mercury, regional haze, ozone and PM, water intakes, water discharges and ash management. The costs of investment to comply with these rules could be substantial and in some cases would lead to early retirement of coal units. We may not be able to timely recover all costs related to complying with regulatory requirements imposed on us.

Increased risks of regulatory penalties could negatively impact our business.

The Energy Act increased civil penalty authority for violation of FERC statutes, rules and orders. The FERC can now impose penalties of up to $1.2 million per violation per day, particularly as it relates to energy trading activities for both electricity and natural gas. Under statute, the FERC can adjust penalties for inflation. In addition, NERC electric reliability standards and critical infrastructure protection requirements are mandatory and subject to potential financial penalties by regional entities, the NERC or the FERC for violations. Additionally, the PHMSA, the Occupational Safety and Health Administration and other federal agencies also have penalty authority. In the event of serious incidents, these agencies have become more active in pursuing penalties. Some states have the authority to impose substantial penalties in the event of non-compliance. If a serious reliability or safety incident did occur, it could have a material effect on our operations or financial results.

We attempt to mitigate the risk of regulatory penalties through formal training on such prohibited practices and a compliance function that reviews our interaction with the markets under FERC and CFTC jurisdictions. We are also managing natural gas risk on our system by removing types of pipe (e.g. cast iron) with known problem tendencies and by testing transmission pipelines in high consequence areas. However, there is no guarantee our compliance programs will be sufficient to ensure against violations.

Macroeconomic Risks

Economic conditions impact our business.

Our operations are affected by local, national and worldwide economic conditions. Growth in our customer base is correlated with economic conditions. While the number of customers is growing, sales growth is relatively modest due to an increased focus on energy efficiency including federal standards for appliance and lighting efficiency and distributed generation, primarily solar PV. Instability in the financial markets also may affect the cost of capital and our ability to raise capital, which is discussed in the capital market risk section above.

Economic conditions may be impacted by insufficient financial sector liquidity leading to potential increased unemployment, which may impact customers’ ability to pay timely, increase customer bankruptcies, and may lead to increased bad debt.

Further, worldwide economic activity has an impact on the demand for basic commodities needed for utility infrastructure, such as steel, copper, aluminum, etc., which may impact our ability to acquire sufficient supplies. Additionally, the cost of those commodities may be higher than expected.

Our operations could be impacted by war, acts of terrorism, threats of terrorism or disruptions in normal operating conditions due to localized or regional events.

Our generation plants, fuel storage facilities, transmission and distribution facilities and information systems may be targets of terrorist activities. Any such disruption could result in a decrease in revenues and additional costs to repair and insure our assets. These disruptions could have a material impact on our financial condition and results of operations. The potential for terrorism has subjected our operations to increased risks and could have a material effect on our business. We have already incurred increased costs for security and capital expenditures in response to these risks. In addition, we may experience additional capital and operating costs to implement security for our plants, including our nuclear power plants under the NRC’s design basis threat requirements. We have also already incurred increased costs for compliance with NERC reliability standards associated with critical infrastructure protection. In addition, we may experience additional capital and operating costs to comply with the NERC critical infrastructure protection standards as they are implemented and clarified.


44

Table of Contents

The insurance industry has also been affected by these events and the availability of insurance may decrease. In addition, the insurance we are able to obtain may have higher deductibles, higher premiums and more restrictive policy terms.

A disruption of the regional electric transmission grid, interstate natural gas pipeline infrastructure or other fuel sources, could negatively impact our business. Because our generation, the transmission systems and local natural gas distribution companies are part of an interconnected system, we face the risk of possible loss of business due to a disruption caused by the actions of a neighboring utility or an event (severe storm, severe temperature extremes, wildfires, solar storms, generator or transmission facility outage, breakdown or failure of equipment, pipeline rupture, railroad disruption, sudden and significant increase or decrease in wind generation or any disruption of work force such as may be caused by flu or other epidemic) within our operating systems or on a neighboring system. Any such disruption could result in a significant decrease in revenues and significant additional costs to repair assets, which could have a material impact on our financial condition and results.

The degree to which we are able to maintain day-to-day operations in response to unforeseen events will in part determine the financial impact of certain events on our financial condition and results. It is difficult to predict the magnitude of such events and associated impacts.

A cyber incident or cyber security breach could have a material effect on our business.

We operate in an industry that requires the continued operation of sophisticated information technology systems and network infrastructure. In addition, we use our systems and infrastructure to create, collect, use, disclose, store, dispose of and otherwise process sensitive information, including company data, customer energy usage data, and personal information regarding customers, employees and their dependents, contractors, shareholders and other individuals.

Our generation, transmission, distribution and fuel storage facilities, information technology systems and other infrastructure or physical assets, as well as the information processed in our systems (e.g., information about our customers, employees, operations, infrastructure and assets) could be affected by cyber security incidents, including those caused by human error. Our industry has begun to see an increased volume and sophistication of cyber security incidents from international activist organizations, Nation States and individuals. Cyber security incidents could harm our businesses by limiting our generating, transmitting and distributing capabilities, delaying our development and construction of new facilities or capital improvement projects to existing facilities, disrupting our customer operations or exposing us to liability. Our generation, transmission systems and natural gas pipelines are part of an interconnected system. Therefore, a disruption caused by the impact of a cyber security incident of the regional electric transmission grid, natural gas pipeline infrastructure or other fuel sources of our third party service providers’ operations, could also negatively impact our business. In addition, such an event would likely receive regulatory scrutiny at both the federal and state level. We are unable to quantify the potential impact of cyber security threats or subsequent related actions. These potential cyber security incidents and corresponding regulatory action could result in a material decrease in revenues and may cause significant additional costs (e.g., penalties, third party claims, repairs, insurance or compliance) and potentially disrupt our supply and markets for natural gas, oil and other fuels.

We maintain security measures designed to protect our information technology systems, network infrastructure and other assets. However, these assets and the information they process may be vulnerable to cyber security incidents, including the resulting disability, or failures of assets or unauthorized access to assets or information. If our technology systems were to fail or be breached, or those of our third-party service providers, we may be unable to fulfill critical business functions, including effectively maintaining certain internal controls over financial reporting. We are unable to quantify the potential impact of cyber security incidents on our business.

Rising energy prices could negatively impact our business.

Although commodity prices are currently relatively low, if fuel costs increase, customer demand could decline and bad debt expense may rise, which could have a material impact on our results of operations. While we have fuel clause recovery mechanisms in most of our states, higher fuel costs could significantly impact our results of operations if costs are not recovered. Delays in the timing of the collection of fuel cost recoveries as compared with expenditures for fuel purchases could have an impact on our cash flows. Low fuel costs could have a positive impact on sales, although particularly on the southern part of our service territory, low oil prices could negatively impact oil and gas production activities. We are unable to predict future prices or the ultimate impact of such prices on our results of operations or cash flows.


45

Table of Contents

Our operating results may fluctuate on a seasonal and quarterly basis and can be adversely affected by milder weather.

Our electric and natural gas utility businesses are seasonal, and weather patterns can have a material impact on our operating performance. Demand for electricity is often greater in the summer and winter months associated with cooling and heating. Because natural gas is heavily used for residential and commercial heating, the demand depends heavily upon weather patterns throughout our service territory, and a significant amount of natural gas revenues are recognized in the first and fourth quarters related to the heating season. Accordingly, our operations have historically generated less revenues and income when weather conditions are milder in the winter and cooler in the summer. Unusually mild winters and summers could have an adverse effect on our financial condition, results of operations, or cash flows.

Our operations use third party contractors in addition to employees to perform periodic and on-going work.
We rely on third party contractors with specific qualifications to perform work both for ongoing operations and maintenance and for capital construction. We have contractual arrangements with these contractors which typically include performance standards, progress payments, insurance requirements and security for performance. Poor vendor performance could impact on going operations, restoration operations, our reputation and could introduce financial risk or risks of fines for Xcel Energy.

Item 1B — Unresolved Staff Comments

None.


46

Table of Contents

Item 2 — Properties

Virtually all of the utility plant property of NSP-Minnesota, NSP-Wisconsin, PSCo and SPS is subject to the lien of their first mortgage bond indentures.

Electric Utility Generating Stations:
NSP-Minnesota

Station, Location and Unit
 
Fuel
 
Installed
 
Summer 2016
Net Dependable
Capability (MW)
 
Steam:
 
 
 
 
 
 
 
A.S. King-Bayport, Minn., 1 Unit
 
Coal
 
1968
 
511

 
Sherco-Becker, Minn.
 
 
 
 
 
 
 
Unit 1
 
Coal
 
1976
 
680

 
Unit 2
 
Coal
 
1977
 
682

 
Unit 3
 
Coal
 
1987
 
517

 (a)
Monticello-Monticello, Minn., 1 Unit
 
Nuclear
 
1971
 
617

 
PI-Welch, Minn.
 
 
 
 
 
 
 
Unit 1
 
Nuclear
 
1973
 
521

 
Unit 2
 
Nuclear
 
1974
 
519

 
Various locations, 4 Units
 
Wood/Refuse-derived fuel
 
Various
 
36

 (b)
Combustion Turbine:
 
 
 
 
 
 
 
Angus Anson-Sioux Falls, S.D., 3 Units
 
Natural Gas
 
1994-2005
 
327

 
Black Dog-Burnsville, Minn., 2 Units
 
Natural Gas
 
1987-2002
 
282

 
Blue Lake-Shakopee, Minn., 6 Units
 
Natural Gas
 
1974-2005
 
453

 
High Bridge-St. Paul, Minn., 3 Units
 
Natural Gas
 
2008
 
530

 
Inver Hills-Inver Grove Heights, Minn., 6 Units
 
Natural Gas
 
1972
 
282

 
Riverside-Minneapolis, Minn., 3 Units
 
Natural Gas
 
2009
 
454

 
Various locations, 14 Units
 
Natural Gas
 
Various
 
67

 
Wind:
 
 
 
 
 
 
 
Grand Meadow-Mower County, Minn., 67 Units
 
Wind
 
2008
 
101

 (c)
Nobles-Nobles County, Minn., 134 Units
 
Wind
 
2010
 
201

 (c)
Pleasant Valley-Mower County, Minn., 100 Units
 
Wind
 
2015
 
200

 (c)
Border-Rolette County, N.D., 75 Units
 
Wind
 
2015
 
150

 (c)
Courtenay Wind, N.D., 100 Units
 
Wind
 
2016
 
200

 (c)
 
 
 
 
Total
 
7,330

 
(a) 
Based on NSP-Minnesota’s ownership of 59 percent.
(b) 
Refuse-derived fuel is made from municipal solid waste.
(c) 
This capacity is only available when wind conditions are sufficiently high enough to support the noted generation values above.  Therefore, the on-demand net dependable capacity is zero.

47

Table of Contents


NSP-Wisconsin

Station, Location and Unit
 
Fuel
 
Installed
 
Summer 2016
Net Dependable
Capability (MW)
 
Steam:
 
 
 
 
 
 
 
Bay Front-Ashland, Wis., 3 Units
 
Coal/Wood/Natural Gas
 
1948-1956
 
56

 
French Island-La Crosse, Wis., 2 Units
 
Wood/Refuse-derived fuel
 
1940-1948
 
16

(a) 
Combustion Turbine:
 
 
 
 
 
 
 
Flambeau Station-Park Falls, Wis., 1 Unit
 
Natural Gas
 
1969
 
12

 
French Island-La Crosse, Wis., 2 Units
 
Oil
 
1974
 
122

 
Wheaton-Eau Claire, Wis., 5 Units
 
Natural Gas/Oil
 
1973
 
238

 
Hydro:
 
 
 
 
 
 
 
Various locations, 63 Units
 
Hydro
 
Various
 
135

 
 
 
 
 
Total
 
579

 
(a) 
Refuse-derived fuel is made from municipal solid waste.
PSCo

Station, Location and Unit
 
Fuel
 
Installed
 
Summer 2016
Net Dependable
Capability (MW)
 
Steam:
 
 
 
 
 
 
 
Cherokee-Denver, Colo., 1 Unit
 
Coal
 
1968
 
352

 (a)
Comanche-Pueblo, Colo.
 
 
 
 
 
 
 
Unit 1
 
Coal
 
1973
 
325

 
Unit 2
 
Coal
 
1975
 
335

 
Unit 3
 
Coal
 
2010
 
500

 (b)
Craig-Craig, Colo., 2 Units
 
Coal
 
1979-1980
 
83

 (c)
Hayden-Hayden, Colo., 2 Units
 
Coal
 
1965-1976
 
233

 (d)
Pawnee-Brush, Colo., 1 Unit
 
Coal
 
1981
 
505

 
Valmont-Boulder, Colo., 1 Unit
 
Coal
 
1964
 
184

 (e)
Combustion Turbine:
 
 
 
 
 
 
 
Blue Spruce-Aurora, Colo., 2 Units
 
Natural Gas
 
2003
 
264

 
Cherokee-Denver, Colo., 3 Units
 
Natural Gas
 
2015
 
576

 
Fort St. Vrain-Platteville, Colo., 6 Units
 
Natural Gas
 
1972-2009
 
968

 
Rocky Mountain-Keenesburg, Colo., 3 Units
 
Natural Gas
 
2004
 
580

 
Various locations, 6 Units
 
Natural Gas
 
Various
 
171

 
Hydro:
 
 
 
 
 
 
 
Cabin Creek-Georgetown, Colo.
 
 
 
 
 
 
 
Pumped Storage, 2 Units
 
Hydro
 
1967
 
210

 
Various locations, 9 Units
 
Hydro
 
Various
 
26

 
 
 
 
 
Total
 
5,312

 
(a) Cherokee Unit 4 will be fuel switched from coal to natural gas by Dec. 31, 2017.
(b) Based on PSCo’s ownership interest of 67 percent of Unit 3.
(c) Based on PSCo’s ownership interest of 10 percent. Craig Unit 1 is expected to be early retired in approximately 2025.
(d) Based on PSCo’s ownership interest of 76 percent of Unit 1 and 37 percent of Unit 2.
(e) Valmont Unit 5 will be retired by Dec. 31, 2017.


48

Table of Contents


SPS

Station, Location and Unit
 
Fuel
 
Installed
 
Summer 2016
Net Dependable
Capability (MW)
 
Steam:
 
 
 
 
 
 
 
Cunningham-Hobbs, N.M., 2 Units
 
Natural Gas
 
1957-1965
 
254

 
Harrington-Amarillo, Texas, 3 Units
 
Coal
 
1976-1980
 
1,018

 
Jones-Lubbock, Texas, 2 Units
 
Natural Gas
 
1971-1974
 
486

 
Maddox-Hobbs, N.M., 1 Unit
 
Natural Gas