UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-K
(Mark One)
þ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the FISCAL YEAR ended December 31, 2016

OR

¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from ___________________ to ___________________
Commission
 
Registrant; State of Incorporation;
 
I.R.S. Employer
File Number
 
Address; and Telephone Number
 
Identification No.
 
 
 
 
 
333-21011
 
FIRSTENERGY CORP.
 
34-1843785
 
 
(An Ohio Corporation)
 
 
 
 
76 South Main Street
 
 
 
 
Akron, OH 44308
 
 
 
 
Telephone (800)736-3402
 
 
 
 
 
 
 
000-53742
 
FIRSTENERGY SOLUTIONS CORP.
 
31-1560186
 
 
(An Ohio Corporation)
 
 
 
 
c/o FirstEnergy Corp.
 
 
 
 
76 South Main Street
 
 
 
 
Akron, OH 44308
 
 
 
 
Telephone (800)736-3402
 
 
SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:
Registrant
 
Title of Each Class
 
Name of Each Exchange
on Which Registered
 
 
 
 
 
FirstEnergy Corp.
 
Common Stock, $0.10 par value
 
New York Stock Exchange
SECURITIES REGISTERED PURSUANT TO SECTION 12(g) OF THE ACT:
Registrant
 
Title of Each Class
 
 
 
FirstEnergy Solutions Corp.
 
Common Stock, no par value per share
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
Yes þ No o
 
FirstEnergy Corp.
Yes o No þ
 
FirstEnergy Solutions Corp.
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
Yes o No þ
 
FirstEnergy Corp. and FirstEnergy Solutions Corp.
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes þ No o
 
FirstEnergy Corp. and FirstEnergy Solutions Corp.
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes þ No o
 
FirstEnergy Corp. and FirstEnergy Solutions Corp.
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant's knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.
þ
 
FirstEnergy Corp.
þ
 
FirstEnergy Solutions Corp.
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.
Large Accelerated Filer þ
FirstEnergy Corp.
 
 
Accelerated Filer o
N/A
 
 
Non-accelerated Filer (Do not check
if a smaller reporting company)
þ
FirstEnergy Solutions Corp.
 
 
Smaller Reporting Company o
N/A
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).
Yes o No þ
 
FirstEnergy Corp. and FirstEnergy Solutions Corp.
State the aggregate market value of the voting and non-voting common equity held by non-affiliates computed by reference to the price at which the common equity was last sold, or the average bid and ask price of such common equity, as of the last business day of the registrant’s most recently completed second fiscal quarter.
FirstEnergy Corp., $14,809,049,520 as of June 30, 2016; and for FirstEnergy Solutions Corp., none.
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:
 
 
OUTSTANDING
CLASS
 
AS OF JANUARY 31, 2017
FirstEnergy Corp., $0.10 par value
 
442,477,633

FirstEnergy Solutions Corp., no par value
 
7

FirstEnergy Corp. is the sole holder of FirstEnergy Solutions Corp. common stock.
Documents Incorporated By Reference
 
 
PART OF FORM 10-K INTO WHICH
DOCUMENT
 
DOCUMENT IS INCORPORATED
 
 
 
Proxy Statement for 2017 Annual Meeting of Shareholders to be held May 16, 2017
 
Part III
This combined Form 10-K is separately filed by FirstEnergy Corp. and FirstEnergy Solutions Corp. Information contained herein relating to an individual registrant is filed by such registrant on its own behalf. No registrant makes any representation as to information relating to the other registrant, except that information relating to FirstEnergy Solutions Corp. is also attributed to FirstEnergy Corp.
OMISSION OF CERTAIN INFORMATION
FirstEnergy Solutions Corp. meets the conditions set forth in General Instruction I(1)(a) and (b) of Form 10-K and is therefore filing this Form 10-K with the reduced disclosure format specified in General Instruction I(2) to Form 10-K.
 





Forward-Looking Statements: Certain of the matters discussed in this Annual Report on Form 10-K are forward-looking statements, within the meaning of the Private Securities Litigation Reform Act of 1995, that are subject to risks and uncertainties. The factors that could cause actual results to differ materially from the forward-looking statements made by the Registrants include those factors discussed herein, including those factors with respect to such Registrants discussed in (a) Item 1A. Risk Factors, (b) Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations, and (c) other factors discussed herein and in other filings with the SEC by the Registrants. Readers are cautioned not to place undue reliance on these forward-looking statements, which apply only as of the date of this Form 10-K. Neither of the Registrants undertake any obligation to update these statements, except as required by law.





TABLE OF CONTENTS
 
Page
 
 
 
 
Part I.
 
 
 
Item 1. Business
 
 
Maryland Regulatory Matters
West Virginia Regulatory Matters
FirstEnergy Website and Other Social Media Sites and Applications
 
 
 
 
 
 
 
 
 
 
Item 4. Mine Safety Disclosures
 
 
 
 
 
 
 
 
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

i




TABLE OF CONTENTS
 
Page
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Item 16. Form 10-K Summary


ii




GLOSSARY OF TERMS
The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries:

AE
Allegheny Energy, Inc., a Maryland utility holding company that merged with a subsidiary of FirstEnergy on February 25, 2011, which subsequently merged with and into FE on January 1, 2014
AESC
Allegheny Energy Service Corporation, which provided legal, financial and other corporate support services to the former AE subsidiaries
AE Supply
Allegheny Energy Supply Company, LLC, an unregulated generation subsidiary
AGC
Allegheny Generating Company, a generation subsidiary of AE Supply and equity method investee of MP
ATSI
American Transmission Systems, Incorporated, formerly a direct subsidiary of FE that became a subsidiary of FET in April 2012, which owns and operates transmission facilities
Buchanan Energy
Buchanan Energy Company of Virginia, LLC, a subsidiary of AE Supply
Buchanan Generation
Buchanan Generation, LLC, a joint venture between AE Supply and CNX Gas Corporation
CEI
The Cleveland Electric Illuminating Company, an Ohio electric utility operating subsidiary
CES
Competitive Energy Services, a reportable operating segment of FirstEnergy
FE
FirstEnergy Corp., a public utility holding company
FELHC
FELHC, Inc.
FENOC
FirstEnergy Nuclear Operating Company, which operates nuclear generating facilities
FES
FirstEnergy Solutions Corp., together with its consolidated subsidiaries, which provides energy-related products and services
FESC
FirstEnergy Service Company, which provides legal, financial and other corporate support services
FET
FirstEnergy Transmission, LLC, formerly known as Allegheny Energy Transmission, LLC, which is the parent of ATSI, MAIT and TrAIL and has a joint venture in PATH
FEV
FirstEnergy Ventures Corp., which invests in certain unregulated enterprises and business ventures
FG
FirstEnergy Generation, LLC, a wholly-owned subsidiary of FES, which owns and operates non-nuclear generating facilities
FGMUC
FirstEnergy Generation Mansfield Unit 1 Corp., a wholly-owned subsidiary of FG, which owns various leasehold interests in Bruce Mansfield Unit 1
FirstEnergy
FirstEnergy Corp., together with its consolidated subsidiaries
Global Holding
Global Mining Holding Company, LLC, a joint venture between FEV, WMB Marketing Ventures, LLC and Pinesdale LLC
Global Rail
Global Rail Group, LLC, a subsidiary of Global Holding that owns coal transportation operations near Roundup, Montana
GPU
GPU, Inc., former parent of JCP&L, ME and PN, that merged with FE on November 7, 2001
Green Valley
Green Valley Hydro, LLC, which owned hydroelectric generating stations
JCP&L
Jersey Central Power & Light Company, a New Jersey electric utility operating subsidiary
MAIT
Mid-Atlantic Interstate Transmission, LLC, a subsidiary of FET, formed to own and operate transmission facilities
ME
Metropolitan Edison Company, a Pennsylvania electric utility operating subsidiary
MP
Monongahela Power Company, a West Virginia electric utility operating subsidiary
NG
FirstEnergy Nuclear Generation, LLC, a subsidiary of FES, which owns nuclear generating facilities
OE
Ohio Edison Company, an Ohio electric utility operating subsidiary
Ohio Companies
CEI, OE and TE
PATH
Potomac-Appalachian Transmission Highline, LLC, a joint venture between FE and a subsidiary of AEP
PATH-Allegheny
PATH Allegheny Transmission Company, LLC
PATH-WV
PATH West Virginia Transmission Company, LLC
PE
The Potomac Edison Company, a Maryland and West Virginia electric utility operating subsidiary
Penn
Pennsylvania Power Company, a Pennsylvania electric utility operating subsidiary of OE
Pennsylvania Companies
ME, PN, Penn and WP
PN
Pennsylvania Electric Company, a Pennsylvania electric utility operating subsidiary
PNBV
PNBV Capital Trust, a special purpose entity created by OE in 1996
Shippingport
Shippingport Capital Trust, a special purpose entity created by CEI and TE in 1997
Signal Peak
Signal Peak Energy, LLC, an indirect subsidiary of Global Holding that owns mining operations near Roundup, Montana
TE
The Toledo Edison Company, an Ohio electric utility operating subsidiary
TrAIL
Trans-Allegheny Interstate Line Company, a subsidiary of FET, which owns and operates transmission facilities
Utilities
OE, CEI, TE, Penn, JCP&L, ME, PN, MP, PE and WP
WP
West Penn Power Company, a Pennsylvania electric utility operating subsidiary

iii




GLOSSARY OF TERMS, Continued

 
 
The following abbreviations and acronyms are used to identify frequently used terms in this report:
AAA
American Arbitration Association
ADIT
Accumulated Deferred Income Taxes
AEP
American Electric Power Company, Inc.
AFS
Available-for-sale
AFUDC
Allowance for Funds Used During Construction
ALJ
Administrative Law Judge
AMT
Alternative Minimum Tax
AOCI
Accumulated Other Comprehensive Income
ARO
Asset Retirement Obligation
ARR
Auction Revenue Right
ASLB
Atomic Safety and Licensing Board
Aspen
Aspen Generating, LLC, a wholly-owned subsidiary of LS Power Equity Partners III, LP
ASU
Accounting Standards Update
Bath County
Bath County Pumped Storage Hydro-Power Station
BGS
Basic Generation Service
bps
Basis points
BNSF
BNSF Railway Company
BRA
PJM RPM Base Residual Auction
CAA
Clean Air Act
CBA
Collective Bargaining Agreement
CCR
Coal Combustion Residuals
CDWR
California Department of Water Resources
CERCLA
Comprehensive Environmental Response, Compensation, and Liability Act of 1980
CFL
Compact Fluorescent Light
CFR
Code of Federal Regulations
CFTC
Commodity Futures Trading Commission
CO2
Carbon Dioxide
CONE
Cost-of-New-Entry
CPP
EPA's Clean Power Plan
CSAPR
Cross-State Air Pollution Rule
CSX
CSX Transportation, Inc.
CTA
Consolidated Tax Adjustment
CWA
Clean Water Act
DCPD
Deferred Compensation Plan for Outside Directors
DCR
Delivery Capital Recovery
DMR
Distribution Modernization Rider
DOE
United States Department of Energy
DR
Demand Response
DSIC
Distribution System Improvement Charge
DSP
Default Service Plan
DTA
Deferred Tax Asset
EDC
Electric Distribution Company
EDCP
Executive Deferred Compensation Plan
EE&C
Energy Efficiency and Conservation
EGS
Electric Generation Supplier
EGU
Electric Generation Unit
ELPC
Environmental Law & Policy Center
EMAAC
Eastern Mid-Atlantic Area Council of PJM
EmPOWER Maryland
EmPOWER Maryland Energy Efficiency Act
ENEC
Expanded Net Energy Cost

iv




GLOSSARY OF TERMS, Continued

EPA
United States Environmental Protection Agency
EPRI
Electric Power Research Institute
ERISA
Employee Retirement Income Security Act of 1974
ERO
Electric Reliability Organization
ESOP
Employee Stock Ownership Plan
ESP
Electric Security Plan
ESP IV
Electric Security Plan IV
ESP IV PPA
Unit Power Agreement entered into on April 1, 2016 by and between the Ohio Companies and FES
ESTIP
Executive Short-Term Incentive Program
Facebook®
Facebook is a registered trademark of Facebook, Inc.
FASB
Financial Accounting Standards Board
FERC
Federal Energy Regulatory Commission
Fitch
Fitch Ratings
FMB
First Mortgage Bond
FPA
Federal Power Act
FTR
Financial Transmission Right
GAAP
Accounting Principles Generally Accepted in the United States of America
GHG
Greenhouse Gases
GWH
Gigawatt-hour
HCl
Hydrochloric Acid
IBEW
International Brotherhood of Electrical Workers
ICE
IntercontinentalExchange, Inc.
ICP 2007
FirstEnergy Corp. 2007 Incentive Plan
ICP 2015
FirstEnergy Corp. 2015 Incentive Compensation Plan
IRP
Integrated Resource Plan
IRS
Internal Revenue Service
ISO
Independent System Operator
kV
Kilovolt
KWH
Kilowatt-hour
KPI
Key Performance Indicator
LBR
Little Blue Run
LCAPP
Long-Term Capacity Agreement Pilot Program
LED
Light Emitting Diode
LIBOR
London Interbank Offered Rate
LMP
Locational Marginal Price
LOC
Letter of Credit
LSE
Load Serving Entity
LTIIPs
Long-Term Infrastructure Improvement Plans
MAAC
Mid-Atlantic Area Council of PJM
MATS
Mercury and Air Toxics Standards
MDPSC
Maryland Public Service Commission
MISO
Midcontinent Independent System Operator, Inc.
MLP
Master Limited Partnership
mmBTU
One Million British Thermal Units
Moody’s
Moody’s Investors Service, Inc.
MVP
Multi-Value Project
MW
Megawatt
MWD
Megawatt-day
MWH
Megawatt-hour
NAAQS
National Ambient Air Quality Standards
NDT
Nuclear Decommissioning Trust
NEIL
Nuclear Electric Insurance Limited

v




GLOSSARY OF TERMS, Continued

NERC
North American Electric Reliability Corporation
NGO
Non-Governmental Organization
Ninth Circuit
United States Court of Appeals for the Ninth Circuit
NJBPU
New Jersey Board of Public Utilities
NMB
Non-Market Based
NOAC
Northwest Ohio Aggregation Coalition
NOL
Net Operating Loss
NOV
Notice of Violation
NOx
Nitrogen Oxide
NPDES
National Pollutant Discharge Elimination System
NPNS
Normal Purchases and Normal Sales
NRC
Nuclear Regulatory Commission
NRG
NRG Energy, Inc.
NSR
New Source Review
NUG
Non-Utility Generation
NYISO
New York Independent System Operator
NYPSC
New York State Public Service Commission
OCA
Office of Consumer Advocate
OCC
Ohio Consumers' Counsel
OEPA
Ohio Environmental Protection Agency
OPEB
Other Post-Employment Benefits
OPEIU
Office and Professional Employees International Union
ORC
Ohio Revised Code
OTC
Over The Counter
OTTI
Other-Than-Temporary Impairments
OVEC
Ohio Valley Electric Corporation
PA DEP
Pennsylvania Department of Environmental Protection
PCB
Polychlorinated Biphenyl
PCRB
Pollution Control Revenue Bond
PJM
PJM Interconnection, L.L.C.
PJM Region
The aggregate of the zones within PJM
PJM Tariff
PJM Open Access Transmission Tariff
PM
Particulate Matter
POLR
Provider of Last Resort
POR
Purchase of Receivables
PPA
Purchase Power Agreement
PPB
Parts per Billion
PPUC
Pennsylvania Public Utility Commission
PSA
Power Supply Agreement
PSD
Prevention of Significant Deterioration
PTC
Price-to-Compare
PUCO
Public Utilities Commission of Ohio
PURPA
Public Utility Regulatory Policies Act of 1978
R&D
Research and Development
RCRA
Resource Conservation and Recovery Act
REC
Renewable Energy Credit
Regulation FD
Regulation Fair Disclosure promulgated by the SEC
REIT
Real Estate Investment Trust
RFC
ReliabilityFirst Corporation
RFP
Request for Proposal
RGGI
Regional Greenhouse Gas Initiative
RMR
Reliability Must-Run

vi




GLOSSARY OF TERMS, Continued

ROE
Return on Equity
RPM
Reliability Pricing Model
RRS
Retail Rate Stability
RSS
Rich Site Summary
RTEP
Regional Transmission Expansion Plan
RTO
Regional Transmission Organization
S&P
Standard & Poor’s Ratings Service
SAIDI
System Average Interruption Duration Index
SAIFI
System Average Interruption Frequency Index
SB221
Amended Substitute Senate Bill No. 221
SB310
Substitute Senate Bill No. 310
SBC
Societal Benefits Charge
SEC
United States Securities and Exchange Commission
SERTP
Southeastern Regional Transmission Planning
Seventh Circuit
United States Court of Appeals for the Seventh Circuit
SF6
Sulfur Hexafluoride
SIP
State Implementation Plan(s) Under the Clean Air Act
SO2
Sulfur Dioxide
SOS
Standard Offer Service
SPE
Special Purpose Entity
SRC
Storm Recovery Charge
SREC
Solar Renewable Energy Credit
SSA
Social Security Administration
SSO
Standard Service Offer
TDS
Total Dissolved Solid
TMI-2
Three Mile Island Unit 2
TO
Transmission Owner
TTS
Temporary Transaction Surcharge
Twitter®
Twitter is a registered trademark of Twitter, Inc.
U.S. Court of Appeals for the D.C. Circuit
United States Court of Appeals for the District of Columbia Circuit
UWUA
Utility Workers Union of America
VEPCO
Virginia Electric Power Company
VIE
Variable Interest Entity
VRR
Variable Resource Requirement
VSCC
Virginia State Corporation Commission
WVDEP
West Virginia Department of Environmental Protection
WVPSC
Public Service Commission of West Virginia
 

vii




PART I
ITEM 1.
BUSINESS
The Companies

FE was organized under the laws of the State of Ohio in 1996. FE’s principal business is the holding, directly or indirectly, of all of the outstanding equity of its principal subsidiaries: OE, CEI, TE, Penn (a wholly owned subsidiary of OE), JCP&L, ME, PN, FESC, FES and its principal subsidiaries (FG and NG), AE Supply, MP, PE, WP, FET and its principal subsidiaries (ATSI and TrAIL), and AESC. In addition, FE holds all of the outstanding equity of other direct subsidiaries including: FirstEnergy Properties, Inc., FEV, FENOC, FELHC, Inc., GPU Nuclear, Inc., and Allegheny Ventures, Inc.

FE and its subsidiaries are principally involved in the generation, transmission and distribution of electricity. FirstEnergy’s ten utility operating companies comprise one of the nation’s largest investor-owned electric systems, based on serving six million customers in the Midwest and Mid-Atlantic regions. Its regulated and unregulated generation subsidiaries control nearly 17,000 MWs of capacity from a diverse mix of non-emitting nuclear, scrubbed coal, natural gas, hydroelectric and other renewables. FirstEnergy’s transmission operations include approximately 24,000 miles of lines and two regional transmission operation centers.
FirstEnergy’s revenues are primarily derived from the sale of energy and related products and services by its unregulated competitive subsidiaries (FES and AE Supply), electric service provided by its utility operating subsidiaries (OE, CEI, TE, Penn, JCP&L, ME, PN, MP, PE, and WP) and its transmission subsidiaries (ATSI and TrAIL).

Unregulated Competitive Subsidiaries

FES, a subsidiary of FE, was organized under the laws of the State of Ohio in 1997. FES provides energy-related products and services to retail and wholesale customers. FES also owns and operates, through its FG subsidiary, fossil generating facilities and owns, through its NG subsidiary, nuclear generating facilities. FES purchases the entire output of the generation facilities owned by FG and NG, and purchases the uncommitted output of AE Supply, as well as the output relating to leasehold interests of OE and TE in certain of those facilities that are subject to sale and leaseback arrangements, and pursuant to full output, cost-of-service PSAs. FG, as subsidiary of FES, was organized under the laws of the State of Ohio in 2000. FG sells the entire output of its fossil generating facilities (5,636 MWs) to FES. NG, as subsidiary of FES, was organized under the laws of the State of Ohio in 2005. NG sells the entire output of its nuclear generating facilities (4,048 MWs) to FES. NG's nuclear generating facilities are operated and maintained by FENOC, a separate subsidiary of FE, organized under the laws of the State of Ohio in 1998.

AE Supply was organized under the laws of the State of Delaware in 1999. AE Supply provides energy-related products and services primarily to FES. AE Supply also owns and operates fossil generating facilities and purchases and sells energy and energy-related commodities.

AGC was organized under the laws of the Commonwealth of Virginia in 1981. Approximately 59% of AGC is owned by AE Supply and approximately 41% by MP. AGC’s sole asset is a 40% undivided interest in the Bath County, Virginia pumped-storage hydroelectric generation facility (1,200 MWs) and its connecting transmission facilities. AGC provides the generation capacity from this facility to AE Supply and MP.

On January 18, 2017, AE Supply and AGC entered into an asset purchase agreement with Aspen for the sale of 1,572 MWs of natural gas and hydroelectric assets, including AE Supply's indirect interest in Bath County. Under the terms of the agreement, the facilities would be purchased for an all cash purchase price of approximately $925 million. The transaction is expected to close in the third quarter of 2017 subject to satisfaction of various customary and other closing conditions, including, without limitation, receipt of regulatory approvals, third party consents and the satisfaction and discharge of AE Supply’s senior note indenture, under which there is approximately $305 million aggregate principal amount of indebtedness outstanding. There can be no assurance that any such approvals will be obtained and/or any such conditions will be satisfied or that such sale will be consummated. Further, the satisfaction and discharge of AE Supply’s senior note indenture in connection with the closing is expected to require the payment of a “make-whole” premium calculated just prior to the redemption, which based on current interest rates is approximately $100 million. It is expected that proceeds from the sale will be invested in the unregulated money pool and may be used for the repayment of debt and general corporate purposes.

As a further condition to closing, FE will provide Aspen two limited guaranties of certain obligations of AE Supply and AGC arising under the purchase agreement. The guaranties vary in amount and scope with expiration dates of one year and three years from the transaction close date.

Additionally, in connection with MP's RFP seeking additional capacity, AE Supply offered the Pleasants power station (1,300 MWs) for approximately $195 million.

FES, FG, NG, AE Supply and AGC comply with the regulations, orders, policies and practices prescribed by the SEC, FERC, and applicable state regulatory authorities. In addition, NG and FENOC comply with the regulations, orders, policies and practices prescribed by the NRC.


1




Utility Operating Subsidiaries

The Utilities’ combined service areas encompass approximately 65,000 square miles in Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York. The areas they serve have a combined population of approximately 13.3 million.

OE was organized under the laws of the State of Ohio in 1930 and owns property and does business as an electric public utility in that state. OE engages in the distribution and sale of electric energy to communities in a 7,000 square mile area of central and northeastern Ohio. The area it serves has a population of approximately 2.3 million.

OE owns all of Penn’s outstanding common stock. Penn was organized under the laws of the Commonwealth of Pennsylvania in 1930 and owns property and does business as an electric public utility in that state. Penn is also authorized to do business in the State of Ohio. Penn furnishes electric service to communities in 1,100 square miles of western Pennsylvania. The area it serves has a population of approximately 0.4 million.

CEI was organized under the laws of the State of Ohio in 1892 and does business as an electric public utility in that state. CEI engages in the distribution and sale of electric energy in an area of 1,600 square miles in northeastern Ohio. The area it serves has a population of approximately 1.6 million.

TE was organized under the laws of the State of Ohio in 1901 and does business as an electric public utility in that state. TE engages in the distribution and sale of electric energy in an area of 2,300 square miles in northwestern Ohio. The area it serves has a population of approximately 0.7 million.

JCP&L was organized under the laws of the State of New Jersey in 1925 and owns property and does business as an electric public utility in that state. JCP&L provides transmission and distribution services in 3,200 square miles of northern, western and east central New Jersey. The area it serves has a population of approximately 2.7 million. JCP&L also has a 50% ownership interest (210 MWs) in a hydroelectric generating facility.

ME was organized under the laws of the Commonwealth of Pennsylvania in 1917 and owns property and does business as an electric public utility in that state. ME provides transmission and distribution services in 3,300 square miles of eastern and south central Pennsylvania. The area it serves has a population of approximately 1.2 million. Additionally, as discussed in "FERC Matters" below, ME transferred its transmission assets to MAIT on January 31, 2017.

PN was organized under the laws of the Commonwealth of Pennsylvania in 1919 and owns property and does business as an electric public utility in that state. PN provides transmission and distribution services in 17,600 square miles of western, northern and south central Pennsylvania. The area it serves has a population of approximately 1.2 million. PN, as lessee of the property of its subsidiary, The Waverly Electric Light & Power Company, also serves customers in the Waverly, New York vicinity. Additionally, as discussed in "FERC Matters" below, PN transferred its transmission assets to MAIT on January 31, 2017.

PE was organized under the laws of the State of Maryland in 1923 and in the Commonwealth of Virginia in 1974. PE is authorized to do business in the Commonwealth of Virginia and the States of West Virginia and Maryland. PE owns property and does business as an electric public utility in those states. PE provides transmission and distribution services in portions of Maryland and West Virginia and provides transmission services in Virginia in an area totaling approximately 5,500 square miles. The area it serves has a population of approximately 0.9 million.

MP was organized under the laws of the State of Ohio in 1924 and owns property and does business as an electric public utility in the state of West Virginia. MP provides generation, transmission and distribution services in 13,000 square miles of northern West Virginia. The area it serves has a population of approximately 0.8 million. As of December 31, 2016, MP owned or contractually controlled 3,580 MWs of generation capacity that is supplied to its electric utility business. In addition, MP is contractually obligated to provide power to PE to meet its load obligations in West Virginia. Refer to "Regulated Generation" below for discussion of MP's RFPs to address its generation shortfall and to sell its interest in Bath County.

WP was organized under the laws of the Commonwealth of Pennsylvania in 1916 and owns property and does business as an electric public utility in that state. WP provides transmission and distribution services in 10,400 square miles of southwestern, south-central and northern Pennsylvania. The area it serves has a population of approximately 1.5 million.

The Utilities comply with the regulations, orders, policies and practices prescribed by the SEC, FERC, and their respective state regulatory authorities (PUCO, PPUC, NJBPU, WVPSC, MDPSC, and VSCC).

Transmission Subsidiaries

ATSI was organized under the laws of the State of Ohio in 1998. ATSI owns major, high-voltage transmission facilities, which consist of approximately 7,800 circuit miles of transmission lines with nominal voltages of 345 kV, 138 kV and 69 kV in the PJM Region.

TrAIL was organized under the laws of the State of Maryland and the Commonwealth of Virginia in 2006. TrAIL was formed to finance, construct, own, operate and maintain high-voltage transmission facilities in the PJM Region and has several transmission

2




facilities in operation, including a 500 kV transmission line extending approximately 150 miles from southwestern Pennsylvania through West Virginia to a point of interconnection with Virginia Electric and Power Company in northern Virginia. TrAIL plans, operates and maintains its transmission system and facilities in accordance with NERC reliability standards, and other applicable regulatory requirements. In addition, TrAIL complies with the regulations, orders, policies and practices prescribed by the SEC, FERC, and applicable state regulatory authorities.

MAIT was organized under the laws of the State of Delaware in 2015. As discussed in "FERC Matters" below, ME and PN transferred their transmission facilities to MAIT on January 31, 2017. The assets transferred consist of approximately 4,283 circuit miles of transmission lines with nominal voltages of 500 kV, 345 kV, 230 kV, 138 kV, 115 kV, 69 kV and 46 kV in the PJM Region.

Each of ATSI, MAIT and TrAIL plans, operates, and maintains its transmission system in accordance with NERC reliability standards, and other applicable regulatory requirements. In addition, each of ATSI, MAIT and TrAIL complies with the regulations, orders, policies and practices prescribed by the SEC, FERC and applicable state regulatory authorities.

Service Company

FESC provides legal, financial and other corporate support services to affiliated FirstEnergy companies.

Operating Segments

FirstEnergy's reportable operating segments are as follows: Regulated Distribution, Regulated Transmission and CES.

The Regulated Distribution segment distributes electricity through FirstEnergy’s ten utility operating companies, serving approximately six million customers within 65,000 square miles of Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York, and purchases power for its POLR, SOS, SSO and default service requirements in Ohio, Pennsylvania, New Jersey and Maryland. This segment also controls 3,790 MWs of regulated electric generation capacity located primarily in West Virginia, Virginia and New Jersey. The segment's results reflect the commodity costs of securing electric generation and the deferral and amortization of certain fuel costs.

The Regulated Transmission segment transmits electricity through transmission facilities owned and operated by ATSI and TrAIL and certain of FirstEnergy's utilities (JCP&L, ME, PN, MP, PE and WP). This segment also includes the regulatory asset associated with the abandoned PATH project. The segment's revenues are primarily derived from forward-looking rates at ATSI and TrAIL, as well as stated transmission rates at certain of FirstEnergy's utilities. As discussed in "FERC Matters" below, effective January 31, 2017, MAIT includes the transmission assets of ME and PN, and JCP&L submitted applications to FERC requesting authorization to implement forward-looking formula transmission rates. Those applications are pending before FERC. Both the forward-looking and stated rates recover costs and provide a return on transmission capital investment. Under the forward-looking rates, each of ATSI's and TrAIL's revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual costs. Except for the recovery of the PATH abandoned project regulatory asset, the segment's revenues are primarily from transmission services provided to LSEs pursuant to the PJM Tariff. The segment's results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy's transmission facilities.

The CES segment, through FES and AE Supply, primarily supplies electricity to end-use customers through retail and wholesale arrangements, including competitive retail sales to customers primarily in Ohio, Pennsylvania, Illinois, Michigan, New Jersey and Maryland, and the provision of partial POLR and default service for some utilities in Ohio, Pennsylvania and Maryland, including the Utilities. As of December 31, 2016, this business segment controlled 13,162 MWs of electric generating capacity, including, as discussed in "Unregulated Competitive Subsidiaries" above, 1,572 MWs of natural gas and hydroelectric generating capacity subject to an asset purchase agreement with Aspen and the 1,300 MW Pleasants power station which was offered into MP's RFP process by AE Supply. The CES segment’s operating results are primarily derived from electric generation sales less the related costs of electricity generation, including fuel, purchased power and net transmission (including congestion) and ancillary costs and capacity costs charged by PJM to deliver energy to the segment’s customers, as well as other operating and maintenance costs, including costs incurred by FENOC.

Corporate support not charged to FE's subsidiaries, interest expense on stand-alone holding company debt, corporate income taxes and other businesses that do not constitute an operating segment are categorized as Corporate/Other for reportable business segment purposes. Additionally, reconciling adjustments for the elimination of inter-segment transactions are included in Corporate/Other. As of December 31, 2016, Corporate/Other had $4.2 billion of stand-alone holding company long-term debt, of which 28% was subject to variable-interest rates, and $2.7 billion was borrowed by FE under its revolving credit facility.

Additional information regarding FirstEnergy’s reportable segments is provided in "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations" and "Note 19, Segment Information", of the Combined Notes to Consolidated Financial Statements. FES does not have separate reportable operating segments.


3




Competitive Generation

As of February 21, 2017, FirstEnergy’s competitive generating portfolio consists of 13,162 MWs of electric generating capacity. Of the generation asset portfolio, approximately 6,136 MWs (46.6%) consist of coal-fired capacity; 4,048 MWs (30.8%) consist of nuclear capacity; 713 MWs (5.4%) consist of hydroelectric capacity; 1,592 MWs (12.1%) consist of oil and natural gas units; 496 MWs (3.8%) consist of wind and solar power arrangements; and 177 MWs (1.3%) consist of capacity entitlements to output from generation assets owned by OVEC. All units are located within PJM and sell electric energy, capacity and other products into the wholesale markets that are operated by PJM. Within CES' generation portfolio, 10,180 MWs consist of FES' facilities that are operated by FENOC and FG (including entitlements from OVEC, wind and solar power arrangements), and except for portions of Bruce Mansfield and Beaver Valley Unit 2 facilities that are subject to the sale and leaseback arrangements with non-affiliates for which the corresponding output of these arrangements is available to FES through power sales agreements, are all owned directly by NG and FG. Another 2,982 MWs of the CES' portfolio consists of AE Supply's facilities, including AE Supply's entitlement to 713 MWs from AGC's interest in Bath County and 67 MWs of AE Supply's 3.01% entitlement from OVEC's generation output. As discussed below, AE Supply and AGC have agreed to sell to Aspen 1,572 MWs of electric generating capacity, and AE Supply offered its 1,300 MW Pleasants power station into MP's RFP process. FES' generating facilities are concentrated primarily in Ohio and Pennsylvania and AE Supply's generating facilities are primarily located in Pennsylvania, West Virginia, Virginia and Ohio.

Over the past several years, CES has been impacted by a prolonged decrease in demand and excess generation supply in the PJM Region, which has resulted in a period of protracted low power and capacity prices. To address this, CES sold or deactivated more than 6,770 MWs of competitive generation from 2012 to 2015. Additionally, CES has continued to focus on cost reductions, including those identified as part of FirstEnergy's previously disclosed cash flow improvement plan.

However, the energy and capacity markets continue to be weak, as evidenced by the significantly depressed capacity prices from the 2019/2020 PJM Base Residual Auction in May of 2016, as well as the current forward pricing and the long term fundamental view on energy and capacity prices, which resulted in a non-cash pre-tax impairment charge of $800 million ($23 million at FES) recognized in the second quarter of 2016 representing the total amount of goodwill at CES.

As part of a continual process to evaluate its overall generation business, on July 22, 2016, FirstEnergy announced its intent to exit the 136 MW Bay Shore Unit 1 generating station by October 2020 and to deactivate Units 1-4 of the W.H. Sammis generating station totaling 720 MWs by May 2020, resulting in a $647 million ($517 million at FES) non-cash pre-tax impairment charge in the second quarter of 2016. Furthermore, in November of 2016, FirstEnergy announced that it had begun a strategic review of its competitive operations as it transitions to a fully regulated utility with a target to implement its exit from competitive operations by mid-2018.

As a result of this strategic review, as further discussed above, FirstEnergy announced in January 2017 that AE Supply and AGC had entered into an asset purchase agreement to sell four of AE Supply’s natural gas generating plants and approximately 59% of AGC’s interest in Bath County (1,572 MWs of combined capacity) for an all cash purchase price of $925 million, subject to customary and other closing conditions and, in February 2017, in connection with MP's RFP seeking additional generation capacity, AE Supply offered the Pleasants power station (1,300 MWs) for approximately $195 million, which remains pending.

Although FirstEnergy is targeting mid-2018 to exit competitive operations, the options for the remaining portion of CES' generation are still uncertain, but could include one or more of the following:

Legislative or regulatory solutions for generation assets that recognize their environmental or energy security benefits,
Additional asset sales and/or plant deactivations,
Restructuring FES debt with its creditors, and/or
Seeking protection under U.S. bankruptcy laws for FES and possibly FENOC.

Furthermore, adverse outcomes in previously disclosed disputes regarding long-term coal transportation contracts and/or the inability to extend or refinance debt maturities at FES subsidiaries, could accelerate management's targeted timeline and limit its options to exit competitive operations to either restructuring debt with its creditors or seeking protection under U.S. bankruptcy laws for FES and possibly FENOC.

As part of assessing the viability of strategic alternatives, FirstEnergy determined that the carrying value of long-lived assets of the competitive business were not recoverable, specifically given FirstEnergy's target to implement its exit from competitive operations by mid-2018, significantly before the end of their original useful lives, and the anticipated cash flows over this shortened period. As a result, CES recorded a non-cash pre-tax impairment charge of $9,218 million ($8,082 million at FES) in the fourth quarter of 2016 to reduce the carrying value of certain assets to their estimated fair value, including long-lived assets, such as generating plants and nuclear fuel, as well as other assets such as materials and supplies.
 

4




Regulated Generation

As of February 21, 2017, FirstEnergy’s regulated generating portfolio consists of 3,790 MWs of diversified capacity contained within the Regulated Distribution segment: 210 MWs consist of JCP&L's 50% ownership interest in the Yards Creek hydroelectric facility in New Jersey; and 3,580 MWs consist of MP's facilities, including 487 MWs from AGC's interest in Bath County that MP partially owns and 11 MWs of MP's 0.49% entitlement from OVEC's generation output. MP's facilities are concentrated primarily in West Virginia. On December 16, 2016, MP issued two RFPs, one to address its generation shortfall previously identified in the IRP filed with the WVPSC on December 30, 2015 and a second RFP to sell its interest in Bath County. The IRP identified a capacity shortfall for MP starting in 2016 and exceeding 700 MWs by 2020 and 850 MWs by 2027. Bids were received by an independent evaluator in February 2017 for both RFPs, including AE Supply's offer of the Pleasants power station (1,300 MWs). Winning bids are expected to be announced in connection with the filing of the appropriate applications for approval of the transactions with the WVPSC and FERC.
Utility Regulation
State Regulation

Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in Ohio by the PUCO, in New Jersey by the NJBPU, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE in Virginia are subject to certain regulations of the VSCC. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility.

As competitive retail electric suppliers serving retail customers primarily in Ohio, Pennsylvania, Illinois, Michigan, New Jersey and Maryland, FES and AE Supply are subject to state laws applicable to competitive electric suppliers in those states, including affiliate codes of conduct that apply to FES, AE Supply and their public utility affiliates. In addition, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission or generation facilities, depending on the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission or generation facility.
Federal Regulation

With respect to their wholesale services and rates, the Utilities, AE Supply, ATSI, AGC, FES, FG, NG, PATH and TrAIL are subject to regulation by FERC. Under the FPA, FERC regulates rates for interstate wholesale sales, transmission of electric power, accounting and other matters, including construction and operation of hydroelectric projects. FERC regulations require ATSI, JCP&L, MP, PE, WP and TrAIL to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of ATSI, JCP&L, MP, PE, WP and TrAIL are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under the PJM Tariff. See "FERC Matters" below.

FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Utilities, AE Supply, FES and its subsidiaries, Buchanan Generation and Green Valley each have been authorized by FERC to sell wholesale power in interstate commerce at market-based rates and have a market-based rate tariff on file with FERC, although major wholesale purchases remain subject to regulation by the relevant state commissions. As a condition to selling electricity on a wholesale basis at market-based rates, the Utilities, AE Supply, FES and its subsidiaries, Buchanan Generation and Green Valley, like other entities granted market-based rate authority, must file electronic quarterly reports with FERC listing their sales transactions for the prior quarter. However, consistent with its historical practice, FERC has granted AE Supply, FES and its subsidiaries, Buchanan Generation and Green Valley a waiver from certain reporting, record-keeping and accounting requirements that typically apply to traditional public utilities. Along with market-based rate authority, FERC also granted AE Supply, FES and its subsidiaries, Buchanan Generation and Green Valley blanket authority to issue securities and assume liabilities under Section 204 of the FPA.

The nuclear generating facilities owned and leased by NG, OE and TE, and operated by FENOC, are subject to extensive regulation by the NRC. The NRC subjects nuclear generating stations to continuing review and regulation covering, among other things, operations, maintenance, emergency planning, security, environmental and radiological aspects of those stations. The NRC may modify, suspend or revoke operating licenses and impose civil penalties for failure to comply with the Atomic Energy Act, the regulations under such Act or the terms of the licenses. FENOC is the licensee for the operating nuclear plants and has direct compliance responsibility for NRC matters. FES controls the economic dispatch of NG’s plants. See Nuclear Regulation below.

Federally-enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements on the Utilities, FES and its subsidiaries, AE Supply, FENOC, ATSI and TrAIL. NERC is the ERO designated by FERC to establish and enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to eight regional entities, including RFC. All of FirstEnergy's facilities are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and enforced by RFC.

5





FirstEnergy, including FES, believes that it is in compliance with all currently-effective and enforceable reliability standards. Nevertheless, in the course of operating its extensive electric utility systems and facilities, FirstEnergy, including FES, occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the reliability standards. If and when such occurrences are found, FirstEnergy, including FES, develops information about the occurrence and develops a remedial response to the specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy's, including FES, part to comply with the reliability standards for its bulk electric system could result in the imposition of financial penalties, and obligations to upgrade or build transmission facilities, that could have a material adverse effect on its financial condition, results of operations and cash flows.
Regulatory Accounting

FirstEnergy accounts for the effects of regulation through the application of regulatory accounting to the Utilities, AGC, ATSI, PATH and TrAIL since their rates are established by a third-party regulator with the authority to set rates that bind customers, are cost-based and can be charged to and collected from customers.

The Utilities, AGC, ATSI, PATH and TrAIL recognize, as regulatory assets and regulatory liabilities, costs which FERC and the various state utility commissions, as applicable, have authorized for recovery/return from/to customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets and regulatory liabilities would have been charged to income as incurred. All regulatory assets and liabilities are expected to be recovered/returned from/to customers. Based on current ratemaking procedures, the Utilities, AGC, ATSI, PATH and TrAIL continue to collect cost-based rates for their transmission and distribution services and, in the case of PATH, for its abandoned plant, which remains regulated; accordingly, it is appropriate that the Utilities, AGC, ATSI, PATH and TrAIL continue the application of regulatory accounting to those operations. Regulatory accounting is applied only to the parts of the business that meet the above criteria. If a portion of the business applying regulatory accounting no longer meets those requirements, previously recorded net regulatory assets or liabilities are removed from the balance sheet in accordance with GAAP.
Maryland Regulatory Matters

PE provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS.

The Maryland legislature adopted a statute in 2008 codifying the EmPOWER Maryland goals to reduce electric consumption and demand and requiring each electric utility to file a plan every three years. PE's current plan, covering the three-year period 2015-2017, was approved by the MDPSC on December 23, 2014. On July 16, 2015, the MDPSC issued an order setting new incremental energy savings goals for 2017 and beyond, beginning with the goal of 0.97% savings set in PE's plan for 2016, and increasing 0.2% per year thereafter to reach 2%. The costs of the 2015-2017 plan are expected to be approximately $70 million, of which $43 million was incurred through December 31, 2016. PE continues to recover program costs subject to a five-year amortization. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date, such recovery has not been sought or obtained by PE.

On February 27, 2013, the MDPSC issued an order requiring the Maryland electric utilities to submit analyses relating to the costs and benefits of making further system and staffing enhancements in order to attempt to reduce storm outage durations. PE's responsive filings discussed the steps needed to harden the utility's system in order to attempt to achieve various levels of storm response speed described in the February 2013 Order, and projected that it would require approximately $2.7 billion in infrastructure investments over 15 years to attempt to achieve the quickest level of response for the largest storm projected in the February 2013 Order. On July 1, 2014, the Staff of the MDPSC issued a set of reports that recommended the imposition of extensive additional requirements in the areas of storm response, feeder performance, estimates of restoration times, and regulatory reporting, as well as the imposition of penalties, including customer rebates, for a utility's failure or inability to comply with the escalating standards of storm restoration speed proposed by the Staff of the MDPSC. In addition, the Staff of the MDPSC proposed that the Maryland utilities be required to develop and implement system hardening plans, up to a rate impact cap on cost. The MDPSC conducted a hearing September 15-18, 2014, to consider certain of these matters, and has not yet issued a ruling on any of those matters.

On September 26, 2016, the MDPSC initiated a new proceeding to consider an array of issues relating to electric distribution system design, including matters relating to electric vehicles, distributed energy resources, advanced metering infrastructure, energy storage, system planning, rate design, and impacts on low-income customers. Initial comments in the proceeding were filed on October 28, 2016, and the MDPSC held an initial hearing on the matter on December 8-9, 2016. On January 31, 2017, the MDPSC issued a notice establishing five working groups to address these issues over the following eighteen months, and also directed the retention of an outside consultant to prepare a report on costs and benefits of distributed solar generation in Maryland.


6




New Jersey Regulatory Matters

JCP&L currently provides BGS for retail customers who do not choose a third party EGS and for customers of third party EGSs that fail to provide the contracted service. The supply for BGS is comprised of two components, procured through separate, annually held descending clock auctions, the results of which are approved by the NJBPU. One BGS component reflects hourly real time energy prices and is available for larger commercial and industrial customers. The second BGS component provides a fixed price service and is intended for smaller commercial and residential customers. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.

Pursuant to the NJBPU's March 26, 2015 final order in JCP&L's 2012 rate case proceeding directing that certain studies be completed, on July 22, 2015, the NJBPU approved the NJBPU staff's recommendation to implement such studies, which include operational and financial components. The independent consultant conducting the review issued a final report on July 27, 2016, recognizing that JCP&L is meeting the NJBPU requirements and making various operational and financial recommendations. The NJBPU issued an Order on August 24, 2016, that accepted the independent consultant’s final report and directed JCP&L, the Division of Rate Counsel and other interested parties to address the recommendations.

In an Order issued October 22, 2014, in a generic proceeding to review its policies with respect to the use of a CTA in base rate cases (Generic CTA proceeding), the NJBPU stated that it would continue to apply its current CTA policy in base rate cases, subject to incorporating the following modifications: (i) calculating savings using a five-year look back from the beginning of the test year; (ii) allocating savings with 75% retained by the company and 25% allocated to rate payers; and (iii) excluding transmission assets of electric distribution companies in the savings calculation. On November 5, 2014, the Division of Rate Counsel appealed the NJBPU Order regarding the Generic CTA proceeding to the New Jersey Superior Court and JCP&L filed to participate as a respondent in that proceeding. Briefing has been completed. The oral argument was held on October 25, 2016.

On April 28, 2016, JCP&L filed tariffs with the NJBPU proposing a general rate increase associated with its distribution operations to improve service and benefit customers by supporting equipment maintenance, tree trimming, and inspections of lines, poles and substations, while also compensating for other business and operating expenses. The filing requested approval to increase annual operating revenues by approximately $142.1 million based upon a hybrid test year for the twelve months ending June 30, 2016. On November 30, 2016, JCP&L submitted to the ALJ a Stipulation of Settlement achieved with all the intervening parties providing for an annual $80 million distribution revenue increase, effective January 1, 2017. The ALJ filed an Initial Decision concluding that the Stipulation of Settlement should be approved, and the NJBPU approved the Stipulation of Settlement on December 12, 2016. As part of the Stipulation of Settlement the intervening parties agreed that JCP&L can accelerate the amortization of the 2012 major storm expenses (approximately $19 million annually) that are recovered through the SRC to achieve full recovery by December 31, 2019. On November 23, 2016, JCP&L filed an Amendment to its January 15, 2016 SRC Filing with the NJBPU, requesting that JCP&L be able to accelerate the amortization of the 2012 major storm expenses as agreed to in the Stipulation of Settlement, and a Stipulation of Settlement with NJBPU Staff and the Division of Rate Counsel regarding the SRC Filing was filed on December 27, 2016. The NJBPU approved this Stipulation of Settlement at the January 25, 2017 public meeting.
Ohio Regulatory Matters

The Ohio Companies currently operate under an ESP IV which commenced June 1, 2016 and expires May 31, 2024. The material terms of ESP IV, as approved in the PUCO’s Opinions and Orders issued on March 31, 2016 and October 12, 2016, include Rider DMR, which provides for the Ohio Companies to collect $132.5 million annually for three years, with the possibility of a two-year extension. The Rider DMR will be grossed up for taxes, resulting in an approved amount of approximately $204 million annually. Revenues from the Rider DMR will be excluded from the significantly excessive earnings test for the initial three-year term but the exclusion will be reconsidered upon application for a potential two-year extension. The PUCO set three conditions for continued recovery under Rider DMR: (1) retention of the corporate headquarters and nexus of operations in Akron, Ohio; (2) no change in control of the Ohio Companies; and (3) a demonstration of sufficient progress in the implementation of grid modernization programs approved by the PUCO. ESP IV also continues a base distribution rate freeze through May 31, 2024. In addition, ESP IV continues the supply of power to non-shopping customers at a market-based price set through an auction process.

ESP IV also continues Rider DCR, which supports continued investment related to the distribution system for the benefit of customers, with increased revenue caps of approximately $30 million per year from June 1, 2016 through May 31, 2019; $20 million per year from June 1, 2019 through May 31, 2022; and $15 million per year from June 1, 2022 through May 31, 2024. Other material terms of ESP IV include the collection of lost distribution revenues associated with energy efficiency and peak demand reduction programs, an agreement to file a Grid Modernization Business Plan for PUCO consideration and approval (which filing was made on February 29, 2016), a goal across FirstEnergy to reduce CO2 emissions by 90% below 2005 levels by 2045, and contributions, totaling $51 million, to fund energy conservation programs, economic development and job retention in the Ohio Companies’ service territory, and a fuel-fund in each of the Ohio Companies’ service territories to assist low-income customers, and to establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio.

On April 29, 2016 and May 2, 2016, several parties, including the Ohio Companies, filed applications for rehearing on the Ohio Companies’ ESP IV with the PUCO. On September 6, 2016, while the applications for rehearing were still pending before the PUCO, the OCC and NOAC filed a notice of appeal with the Ohio Supreme Court appealing various PUCO and Attorney Examiner Entries on the parties’ applications for rehearing. On September 16, 2016, the Ohio Companies intervened and filed a motion to dismiss

7




the appeal. The PUCO resolved such applications for rehearing in the October 12, 2016 Opinion and Order. The OCC and NOAC appeal remains pending before the Ohio Supreme Court.

On November 10, 2016 and November 14, 2016, several parties, including the Ohio Companies, filed additional applications for rehearing on the Ohio Companies’ ESP IV with the PUCO. The Ohio Companies’ application for rehearing challenged, among other things, the PUCO’s failure to adopt the Ohio Companies’ suggested modifications to Rider DMR. The Ohio Companies had previously suggested that a properly designed Rider DMR would be valued at $558 million annually for eight years, and include an additional amount that recognizes the value of the economic impact of FirstEnergy maintaining its headquarters in Ohio. Other parties’ applications for rehearing argued, among other things, that the PUCO’s adoption of Rider DMR is not supported by law or sufficient evidence. On December 7, 2016, the PUCO granted the applications for rehearing for further consideration of the matters specified in the applications for rehearing. The matter remains pending before the PUCO. For additional information, see “FERC Matters - Ohio ESP IV PPA,” below.

Under ORC 4928.66, the Ohio Companies were required to implement energy efficiency programs that achieved a total annual energy savings of 1,990 GWHs and total peak demand reduction of 486 MWs in 2015. On May 12, 2016, the Ohio Companies filed their Energy Efficiency and Peak Demand Reduction Program Status Report indicating compliance with their 2015 statutory benchmarks. In 2016, the Ohio Companies estimated the annual energy savings target and peak demand reduction target will be comparable to the 2015 targets due to the energy efficiency requirements under SB310, which amended ORC 4928.66 to freeze the energy efficiency and peak demand reduction benchmarks for 2015 and 2016. Starting in 2017, ORC 4928.66 requires the energy savings benchmark to increase by 1% and the peak demand reduction benchmark to increase by 0.75% annually thereafter through 2020.

On April 15, 2016, the Ohio Companies filed an application for approval of their three-year energy efficiency portfolio plans for the period from January 1, 2017 through December 31, 2019. The plans as proposed comply with benchmarks contemplated by ORC 4928.66 and provisions of the ESP IV, and include a portfolio of energy efficiency programs targeted to a variety of customer segments, including residential customers, low income customers, small commercial customers, large commercial and industrial customers and governmental entities. On December 9, 2016, the Ohio Companies filed a Stipulation and Recommendation with several parties that contained changes to the plan and a decrease in the plan costs. The Ohio Companies anticipate the cost of the plans will be approximately $268 million over the life of the portfolio plans and such costs are expected to be recovered through the Ohio Companies’ existing rate mechanisms. The hearings were held in January 2017.

Ohio law requires electric utilities and electric service companies in Ohio to serve part of their load from renewable energy resources measured by an annually increasing percentage amount through 2026, except 2015 and 2016 that remain at the 2014 level. The Ohio Companies conducted RFPs in 2009, 2010 and 2011 to secure RECs to help meet these renewable energy requirements. In September 2011, the PUCO opened a docket to review the Ohio Companies' alternative energy recovery rider through which the Ohio Companies recover the costs of acquiring these RECs. The PUCO issued an Opinion and Order on August 7, 2013, approving the Ohio Companies' acquisition process and their purchases of RECs to meet statutory mandates in all instances except for certain purchases arising from one auction and directed the Ohio Companies to credit non-shopping customers in the amount of $43.4 million, plus interest, on the basis that the Ohio Companies did not prove such purchases were prudent. On December 24, 2013, following the denial of their application for rehearing, the Ohio Companies filed a notice of appeal and a motion for stay of the PUCO's order with the Supreme Court of Ohio, which was granted. On February 18, 2014, the OCC and the ELPC also filed appeals of the PUCO's order. The Ohio Companies timely filed their merit brief with the Supreme Court of Ohio and the briefing process has concluded. The matter is not yet scheduled for oral argument.

On April 9, 2014, the PUCO initiated a generic investigation of marketing practices in the competitive retail electric service market, with a focus on the marketing of fixed-price or guaranteed percent-off SSO rate contracts where there is a provision that permits the pass-through of new or additional charges. On November 18, 2015, the PUCO ruled that on a going-forward basis, pass-through clauses may not be included in fixed-price contracts for all customer classes. On December 18, 2015, FES filed an Application for Rehearing seeking to change the ruling or have it only apply to residential and small commercial customers. On January 13, 2016, the PUCO granted reconsideration for further consideration of the matters specified in the applications for rehearing. The matter remains pending before the PUCO.
Pennsylvania Regulatory Matters

The Pennsylvania Companies currently operate under DSPs that expire on May 31, 2017, and provide for the competitive procurement of generation supply for customers that do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service. The default service supply is currently provided by wholesale suppliers through a mix of long-term and short-term contracts procured through spot market purchases, quarterly descending clock auctions for 3-, 12- and 24-month energy contracts, and one RFP seeking 2-year contracts to serve SRECs for ME, PN and Penn.


8




Following the expiration of the current DSPs, the Pennsylvania Companies will operate under new DSPs for the June 1, 2017 through May 31, 2019 delivery period, which provide for the competitive procurement of generation supply for customers who do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service. Under the new DSPs, the supply will be provided by wholesale suppliers through a mix of 12- and 24-month energy contracts, as well as one RFP for 2-year SREC contracts for ME, PN and Penn. In addition, the new DSPs include modifications to the Pennsylvania Companies’ existing POR programs in order to reduce the level of uncollectible expense the Pennsylvania Companies experience associated with alternative EGS charges.

Pursuant to Pennsylvania's EE&C legislation (Act 129 of 2008) and PPUC orders, Pennsylvania EDCs implement energy efficiency and peak demand reduction programs. The Pennsylvania Companies' Phase II EE&C Plans were effective through May 31, 2016. Total Phase II costs of these plans were $174 million and are recoverable through the Pennsylvania Companies' reconcilable EE&C riders. On June 19, 2015, the PPUC issued a Phase III Final Implementation Order setting: demand reduction targets, relative to each Pennsylvania Companies' 2007-2008 peak demand (in MW), at 1.8% for ME, 1.7% for Penn, 1.8% for WP, and 0% for PN; and energy consumption reduction targets, as a percentage of each Pennsylvania Companies’ historic 2010 forecasts (in MWH), at 4.0% for ME, 3.9% for PN, 3.3% for Penn, and 2.6% for WP. The Pennsylvania Companies' Phase III EE&C plans for the June 2016 through May 2021 period, which were approved in March 2016, with expected costs up to $390 million, are designed to achieve the targets established in the PPUC's Phase III Final Implementation Order with full recovery through the reconcilable EE&C riders.

Pursuant to Act 11 of 2012, Pennsylvania EDCs may establish a DSIC to recover costs of infrastructure improvements and costs related to highway relocation projects with PPUC approval. Pennsylvania EDCs must file LTIIPs outlining infrastructure improvement plans for PPUC review and approval prior to approval of a DSIC. On October 19, 2015, each of the Pennsylvania Companies filed LTIIPs with the PPUC for infrastructure improvement over the five-year period of 2016 to 2020 for the following costs: WP- $88.34 million; PN- $56.74 million; Penn- $56.35 million; and ME- $43.44 million. On February 11, 2016, the PPUC approved the Pennsylvania Companies' LTIIPs. On February 16, 2016, the Pennsylvania Companies filed DSIC riders for PPUC approval for quarterly cost recovery associated with the capital projects approved in the LTIIPs. On June 9, 2016, the PPUC approved the Pennsylvania Companies’ DSIC riders to be effective July 1, 2016, subject to hearings and refund or reallocation among customers. The four proceedings were consolidated by the ALJ. On January 19, 2017, in the PPUC’s order approving the Pennsylvania Companies’ general rate cases, discussed below, the PPUC referred the issue of whether ADIT should be included in DSIC calculations to the consolidated DSIC proceeding. On February 2, 2017, the parties to the consolidated DSIC proceeding submitted a Joint Settlement to the ALJ to resolve issues referred to by the ALJ in its June 9, 2016 Order, subject to PPUC approval, and would not result in any refund or reallocation among customers. The ADIT issue will be considered separately from the issues resolved in the Joint Settlement Petition of February 2, 2017, and is the sole issue to be litigated in the consolidated DSIC proceeding through a procedural schedule to be determined by the ALJ.

On April 28, 2016, each of the Pennsylvania Companies filed tariffs with the PPUC proposing general rate increases associated with their distribution operations to benefit customers by modernizing the grid with smart technologies, increasing vegetation management activities, and continuing other customer service enhancements. The filings requested approval to increase annual operating revenues by approximately $140.2 million at ME, $158.8 million at PN, $42.0 million at Penn, and $98.2 million at WP, based upon fully projected future test years for the twelve months ending December 31, 2017 at each of the Pennsylvania Companies. As a result of the enactment of Act 40 of 2016 that terminated the practice of making a CTA when calculating a utility’s federal income taxes for ratemaking purposes, the Pennsylvania Companies submitted supplemental testimony on July 7, 2016, that quantified the value of the elimination of the CTA and outlined their plan for investing 50 percent of that amount in rate base eligible equipment as required by the new law. Formal settlement agreements for each of the Pennsylvania Companies were filed on October 14, 2016, which proposed increases in annual operating revenues of approximately $96 million at ME, $100 million at PN, $29 million at Penn, and $66 million at WP. One item related to the calculation of DSIC rates was reserved for briefing, with briefs filed by two parties. On November 21, 2016, the ALJ issued a Recommended Decision recommending approval of the settlement agreements and dismissal of the one issue reserved for briefing. Exceptions to that Recommended Decision were filed by one party on December 1, 2016, and reply exceptions were filed by the Pennsylvania Companies on December 8, 2016. On January 19, 2017, the PPUC issued an order approving the settlements and referring the reserved issue to the Pennsylvania Companies’ consolidated DSIC proceeding. On February 3, 2017, one party filed a Petition for Reconsideration or Clarification relating to the limited issue of the scope of the record to be transferred to the DSIC proceeding, discussed above. The outcome of this request will not affect the new rates which took effect on January 27, 2017.
West Virginia Regulatory Matters

MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. MP's and PE's ENEC rate is updated annually.

On March 31, 2016, MP and PE filed with the WVPSC seeking approval of their Phase II energy efficiency program including three MP and PE energy efficiency programs to meet their Phase II requirement of energy efficiency reductions of 0.5% of 2013 distribution sales for the January 1, 2017 through May 31, 2018 period, as agreed to by MP and PE, and approved by the WVPSC in the 2012 proceeding approving the transfer of ownership of the Harrison Power Station to MP. The costs for the Phase II program are expected to be $10.4 million and are eligible for recovery through the existing energy efficiency rider which is reviewed in the fuel (ENEC)

9




case each year. A unanimous settlement was reached by the parties on all issues and presented to the WVPSC on August 18, 2016. An order approving the settlement in full without modification was issued by the WVPSC on September 23, 2016. The Phase II program began initial implementation in November 2016.

The Staff of the WVPSC and the Consumer Advocate Division filed a Show Cause petition on August 5, 2016, requesting that the WVPSC order MP and PE to file and implement RFPs for all future capacity and energy requirements above 100 MWs and that they comply with an RFP settlement provision from the Harrison power station acquisition. MP and PE filed a timely response to the petition arguing for dismissal on September 7, 2016. On October 17, 2016, the WVPSC denied the petition filed by the Staff of the WVPSC and the Consumer Advocate Division and dismissed the case.

On August 16, 2016, MP and PE filed their annual ENEC case proposing an annual increase in rates of approximately $65 million effective January 1, 2017, which is a 4.7% increase over existing rates. The increase is comprised of a $119 million under-recovered balance as of June 30, 2016, and a projected $54 million over-recovery for the 2017 rate effective period. The parties reached a unanimous settlement providing for a $25 million increase beginning January 1, 2017 and keeping ENEC rates at the same level for a two year period. The settlement was presented to the WVPSC at a hearing on November 9, 2016. On December 9, 2016, the WVPSC approved the settlement as submitted.

On August 22, 2016, MP and PE filed an application for approval of a modernization and improvement plan for coal-fired boilers at electric power plants and cost-recovery surcharge proposing an approximate $6.9 million annual increase in rates to be effective May 1, 2017, which is a 0.5% increase over existing rates. The filing is in response to recent legislation by the West Virginia Legislature permitting accelerated recovery of costs related to modernizing and improving coal-fired boilers, including costs related to meeting environmental requirements and reducing emissions. The filing was supplemented on September 28, 2016, to add two additional projects, resulting in an approximate $7.4 million annual increase in rates. The Staff of the WVPSC filed a motion to dismiss the case arguing the new statute was not meant to recover these types of projects, but the WVPSC set the case for hearing for February 21-23, 2017. As part of the annual ENEC settlement described above, the parties agreed that MP and PE will increase ENEC rates to provide for a return of and on MATS/CSPR capital costs incurred during 2016-2017. Accordingly, MP and PE withdrew this case as part of the ENEC approval.

On December 30, 2015, MP filed an IRP with the WVPSC identifying a capacity shortfall starting in 2016 and exceeding 700 MWs by 2020 and 850 MWs by 2027. On June 3, 2016, the WVPSC accepted the IRP finding that IRPs are informational and that it must not approve or disapprove the IRP. MP issued a RFP to address its generation shortfall identified in the IRP on December 16, 2016 along with issuing a second RFP to sell its interest in Bath County. Bids were received by an independent evaluator in February 2017 for both RFPs. MP expects to execute definitive agreements with selected respondent(s) and file the appropriate applications with the WVPSC and FERC by March 15, 2017.
FERC Matters

Ohio ESP IV PPA

On August 4, 2014, the Ohio Companies filed an application with the PUCO seeking approval of their ESP IV. ESP IV included a proposed Rider RRS, which would flow through to customers either charges or credits representing the net result of the price paid to FES through an eight-year FERC-jurisdictional PPA, referred to as the ESP IV PPA, against the revenues received from selling such output into the PJM markets. The Ohio Companies entered into stipulations which modified ESP IV, and on March 31, 2016, the PUCO issued an Opinion and Order adopting and approving the Ohio Companies’ stipulated ESP IV with modifications. FES and the Ohio Companies entered into the ESP IV PPA on April 1, 2016.

On January 27, 2016, certain parties filed a complaint with FERC against FES and the Ohio Companies requesting FERC review the ESP IV PPA under Section 205 of the FPA. On April 27, 2016, FERC issued an order granting the complaint, prohibiting any transactions under the ESP IV PPA pending authorization by FERC, and directing FES to submit the ESP IV PPA for FERC review if the parties desired to transact under the agreement. FES and the Ohio Companies did not file the ESP IV PPA for FERC review but rather agreed to suspend the ESP IV PPA. FES and the Ohio Companies subsequently advised FERC of this course of action. On January 19, 2017, FERC issued an order accepting compliance filings by FES, its subsidiaries, and the Ohio Companies updating their respective market-based rate tariffs to clarify that affiliate sales restrictions under the tariffs apply to the ESP IV PPA, and also that the ESP IV PPA does not affect certain other waivers of its affiliate restrictions rules FERC previously granted these entities.

On May 2, 2016, the Ohio Companies filed an Application for Rehearing with the PUCO that included a modified Rider RRS proposal that did not involve a FERC-jurisdictional PPA. Several parties subsequently filed protests and comments with FERC alleging, among other things, that the modified Rider RRS constituted a "virtual PPA". FERC rejected these protests in its January 19, 2017 order accepting the updated market-based rate tariffs of FES, its subsidiaries, and the Ohio Companies discussed below.

On March 21, 2016, a number of generation owners filed with FERC a complaint against PJM requesting that FERC expand the MOPR in the PJM Tariff to prevent the alleged artificial suppression of prices in the PJM capacity markets by state-subsidized generation, in particular alleged price suppression that could result from the ESP IV PPA and other similar agreements. The complaint requested that FERC direct PJM to initiate a stakeholder process to develop a long-term MOPR reform for existing resources that receive out-of-market revenue. On January 9, 2017, the generation owners filed to amend their complaint to include challenges to

10




certain legislation and regulatory programs in Illinois. On January 24, 2017, FESC, acting on behalf of its affected affiliates and along with other utility companies, filed a motion to dismiss the amended complaint for various reasons, including that the ESP IV PPA matter is now moot. In addition, on January 30, 2017, FESC along with other utility companies filed a substantive protest to the amended complaint, demonstrating that the question of the proper role for state participation in generation development should be addressed in the PJM stakeholder process. This proceeding remains pending before FERC.

PJM Transmission Rates

PJM and its stakeholders have been debating the proper method to allocate costs for certain transmission facilities. While FirstEnergy and other parties advocate for a traditional "beneficiary pays" (or usage based) approach, others advocate for “socializing” the costs on a load-ratio share basis, where each customer in the zone would pay based on its total usage of energy within PJM. This question has been the subject of extensive litigation before FERC and the appellate courts, including before the Seventh Circuit. On June 25, 2014, a divided three-judge panel of the Seventh Circuit ruled that FERC had not quantified the benefits that western PJM utilities would derive from certain new 500 kV or higher lines and thus had not adequately supported its decision to socialize the costs of these lines. The majority found that eastern PJM utilities are the primary beneficiaries of the lines, while western PJM utilities are only incidental beneficiaries, and that, while incidental beneficiaries should pay some share of the costs of the lines, that share should be proportionate to the benefit they derive from the lines, and not on load-ratio share in PJM as a whole. The court remanded the case to FERC, which issued an order setting the issue of cost allocation for hearing and settlement proceedings. On June 15, 2016, various parties, including ATSI and the Utilities, filed a settlement agreement at FERC agreeing to apply a combined usage based/socialization approach to cost allocation for charges to transmission customers in the PJM region for transmission projects operating at or above 500 kV. Certain other parties in the proceeding did not agree to the settlement and filed protests to the settlement seeking, among other issues, to strike certain of the evidence advanced by FirstEnergy and certain of the other settling parties in support of the settlement, as well as provided further comments in opposition to the settlement. The PJM TOs responded to the protesting parties' various pleadings and motions. The settlement is pending before FERC.

RTO Realignment

On June 1, 2011, ATSI and the ATSI zone transferred from MISO to PJM. While many of the matters involved with the move have been resolved, FERC denied recovery under ATSI's transmission rate for certain charges that collectively can be described as "exit fees" and certain other transmission cost allocation charges totaling approximately $78.8 million until such time as ATSI submits a cost/benefit analysis demonstrating net benefits to customers from the transfer to PJM. Subsequently, FERC rejected a proposed settlement agreement to resolve the exit fee and transmission cost allocation issues, stating that its action is without prejudice to ATSI submitting a cost/benefit analysis demonstrating that the benefits of the RTO realignment decisions outweigh the exit fee and transmission cost allocation charges. On March 17, 2016, FERC denied FirstEnergy's request for rehearing of FERC's earlier order rejecting the settlement agreement and affirmed its prior ruling that ATSI must submit the cost/benefit analysis.

Separately, the question of ATSI's responsibility for certain costs for the “Michigan Thumb” transmission project continues to be disputed. Potential responsibility arises under the MISO MVP tariff, which has been litigated in complex proceedings before FERC and certain United States appellate courts. On October 29, 2015, FERC issued an order finding that ATSI and the ATSI zone do not have to pay MISO MVP charges for the Michigan Thumb transmission project. MISO and the MISO TOs filed a request for rehearing, which FERC denied on May 19, 2016. On July 15, 2016, the MISO TOs filed an appeal of FERC's orders with the Sixth Circuit. On November 16, 2016, the Sixth Circuit granted FirstEnergy's intervention on behalf of ATSI, the Ohio Companies, and PP, and a procedural schedule has been established. On a related issue, FirstEnergy joined certain other PJM TOs in a protest of MISO's proposal to allocate MVP costs to energy transactions that cross MISO's borders into the PJM Region. On July 13, 2016, FERC issued its order finding it appropriate for MISO to assess an MVP usage charge for transmission exports from MISO to PJM. Various parties, including FirstEnergy and the PJM TOs, requested rehearing or clarification of FERC’s order. The requests for rehearing remain pending before FERC.

In addition, in a May 31, 2011 order, FERC ruled that the costs for certain "legacy RTEP" transmission projects in PJM approved before ATSI joined PJM could be charged to transmission customers in the ATSI zone. The amount to be paid, and the question of derived benefits, is pending before FERC as a result of the Seventh Circuit's June 25, 2014 order described above under PJM Transmission Rates.

The outcome of the proceedings that address the remaining open issues related to costs for the "Michigan Thumb" transmission project and "legacy RTEP" transmission projects cannot be predicted at this time.

Transfer of Transmission Assets to MAIT

On June 10, 2015, MAIT, a Delaware limited liability company, was formed as a new transmission-only subsidiary of FET for the purposes of owning and operating all FERC-jurisdictional transmission assets of JCP&L, ME and PN following the receipt of all necessary state and federal regulatory approvals. In February and August 2016, respectively, FERC and the PPUC granted the authorization for PN and ME to contribute their transmission assets to MAIT at book value, together with the approval of related intercompany agreements, including MAIT’s participation in FirstEnergy’s regulated companies' money pool. FirstEnergy subsequently withdrew its request for authorization before the NJBPU to also transfer JCP&L's transmission assets to MAIT.


11




On October 28, 2016, MAIT and PJM submitted joint applications to FERC requesting authorization for (i) PJM to update its Tariff and other agreements to reflect the withdrawal of ME and PN as TOs, and (ii) MAIT to become a participating PJM TO. FERC approval would authorize MAIT to be a PJM TO, and would permit PJM to implement MAIT’s formula rate on MAIT’s behalf. On January 26, 2017, FERC issued an order granting the requested authorization and MAIT now owns and operates the transmission assets of ME and PN. On January 31, 2017, MAIT issued membership interests to FET, PN and ME in exchange for their respective cash and asset contributions.

On October 14 and 28, 2016, MAIT submitted applications to FERC requesting authorization to issue equity, short-term debt, and long-term debt. On December 8, 2016, FERC issued an order authorizing the application to issue equity as requested. MAIT is expected to issue short-term debt and participate in the FirstEnergy regulated companies' money pool for working capital, to fund day-to-day operations, and for other general corporate purposes. Over the long-term, MAIT is expected to issue long-term debt to support capital investment and to establish an actual capital structure for ratemaking purposes. On February 3, 2017, MAIT amended its debt authorization application to provide additional information regarding recovery of its investment and debt costs. MAIT requested an order from FERC on the debt authorization by February 28, 2017. FERC’s order remains pending.

MAIT Transmission Formula Rate

On October 28, 2016, MAIT submitted an application to FERC requesting authorization to implement a forward-looking formula transmission rate to recover and earn a return on transmission assets effective January 1, 2017. On November 30, 2016, various intervenors submitted protests of the proposed MAIT formula rate. Among other things, the protest asked FERC to suspend the proposed effective date for the formula rate until June 1, 2017. MAIT filed a response to the protests on December 12, 2016. On December 28, 2016, FERC Staff issued a deficiency letter with respect to the PJM-related application, which also requested additional information regarding MAIT’s proposed formula rate. As a result of the deficiency letter, FERC’s order on the formula rate remains pending. MAIT responded to FERC Staff’s request on January 10, 2017, and requested that FERC issue an order approving the formula rate immediately after consummation of the transaction, which occurred on January 31, 2017. On February 15, 2017, MAIT filed a further answer to certain protesting parties' comments on its January 10th deficiency letter response.

JCP&L Transmission Formula Rate

On October 28, 2016, after withdrawing its request to the NJBPU to transfer its transmission assets to MAIT, JCP&L submitted an application to FERC requesting authorization to implement a forward-looking formula transmission rate to recover and earn a return on transmission assets effective January 1, 2017. On November 18, 2016, a group of intervenors-including the NJBPU and New Jersey Division of Rate Counsel-filed a protest of the proposed JCP&L transmission rate. Among other things, the protest asked FERC to suspend the proposed effective date for the formula rate until June 1, 2017. On December 5, 2016, JCP&L filed a response to the protest. On December 28, 2016, FERC Staff issued a deficiency letter requesting additional information regarding JCP&L’s proposed transmission rate. As a result of the deficiency letter, FERC’s order on the rate remains pending. JCP&L responded to FERC Staff’s request on January 10, 2017, and requested that FERC issue an order approving the formula rate effective January 1, 2017. On February 15, 2017, JCP&L filed a further answer to certain protesting parties' comments on its January 10th deficiency letter response.

Competitive Generation Asset Sale

On February 17, 2017, AE Supply and AGC submitted filings with FERC for authorization to sell four natural gas generating plants and an undivided ownership interest in Bath County to Aspen for approximately $925 million, in an all cash transaction. The four natural gas plants are: Springdale Generating Facility (638 MWs), Chambersburg Generating Facility (88 MWs), Gans Generating Facility (88 MWs), and Hunlock Creek (45 MWs). The 713 MW ownership interest in Bath County represents AE Supply’s indirect ownership interest in the power station. The FERC applications include a request for authorization to transfer the hydroelectric license under Part I of the FPA, and a request for authorization to transfer the FERC-jurisdictional facilities associated with the hydroelectric projects under Part II of the FPA. Additional filings have been submitted to FERC for the purpose of amending affected FERC-jurisdictional rates and implementing the transaction once regulatory approval is obtained. The VSCC also must approve the sale of the Bath County Hydro interest. The parties expect to close the transaction in the third quarter of 2017, subject to satisfaction of various customary and other closing conditions, including without limitation, receipt of regulatory approvals and third party consents. See "Unregulated Competitive Subsidiaries" above for additional information regarding the transaction.

California Claims Litigation

Since 2002, AE Supply has been involved in litigation and claims based on its power sales to the California Energy Resource Scheduling division of the CDWR during 2001-2003. This litigation and claims are related to litigation and claims advanced by the California Attorney General and certain California utilities regarding alleged market manipulation of the wholesale energy markets in California during the 2000-2001 period. AE Supply negotiated a settlement with the California Attorney General and the California utilities and, on August 24, 2016, filed the settlement agreement for FERC approval. The settlement calls for AE Supply to pay, without admission of any liability, $3.6 million in settlement in principle of all remaining claims that are based on AE Supply’s power sales in the western energy markets during the 2001-2003 time period. On October 27, 2016 FERC approved this settlement, and AE Supply paid the settlement shortly thereafter.


12




PATH Transmission Project

On August 24, 2012, the PJM Board of Managers canceled the PATH project, a proposed transmission line from West Virginia through Virginia and into Maryland which PJM had previously suspended in February 2011. As a result of PJM canceling the project, approximately $62 million and approximately $59 million in costs incurred by PATH-Allegheny and PATH-WV, respectively, were reclassified from net property, plant and equipment to a regulatory asset for future recovery. PATH-Allegheny and PATH-WV requested authorization from FERC to recover the costs with a proposed ROE of 10.9% (10.4% base plus 0.5% for RTO membership) from PJM customers over five years. FERC issued an order denying the 0.5% ROE adder for RTO membership and allowing the tariff changes enabling recovery of these costs to become effective on December 1, 2012, subject to settlement proceedings and a hearing if the parties could not agree to a settlement. On March 24, 2014, the FERC Chief ALJ terminated settlement proceedings and appointed an ALJ to preside over the hearing phase of the case, including discovery and additional pleadings leading up to hearing, which subsequently included the parties addressing the application of FERC's Opinion No. 531, discussed below, to the PATH proceeding. On September 14, 2015, the ALJ issued his initial decision, disallowing recovery of certain costs. On January 19, 2017, FERC issued an order accepting the initial decision in part and denying it in part. Relying on its revised ROE methodology described in FERC Opinion No. 531, FERC reduced the PATH formula rate ROE from 10.4% to 8.11% effective January 19, 2017. Additionally, FERC allowed recovery of costs related to land acquisitions and dispositions and legal expenses, but disallowed certain costs related to advertising and outreach. PATH filed a request for rehearing with FERC on February 20, 2017, seeking recovery of the advertising and outreach costs and requesting that the ROE be reset to 10.4%.

Market-Based Rate Authority, Triennial Update

The Utilities, AE Supply, FES and its subsidiaries, Buchanan Generation, LLC, and Green Valley Hydro, LLC each hold authority from FERC to sell electricity at market-based rates. One condition for retaining this authority is that every three years each entity must file an update with the FERC that demonstrates that each entity continues to meet FERC’s requirements for holding market-based rate authority. On December 23, 2016, FESC, on behalf of its affiliates with market-based rate authority, submitted to FERC the most recent triennial market power analysis filing for each market-based rate holder for the current cycle of this filing requirement. The filings remain pending before FERC.

13




Capital Requirements
FirstEnergy's capital expenditures for 2017 and 2018 are expected to be approximately $2.8 billion and $2.7 billion, respectively. Planned capital initiatives are intended to promote reliability, improve operations, and support current environmental and energy efficiency directives.

Capital expenditures for 2016 and anticipated expenditures for 2017 and 2018 by reportable segment are included below:
Reportable Segment
 
2016 Actual(1)
 
2016 Pension/OPEB Mark-to-Market Capital Costs
 
2016 Actual Excluding Pension/OPEB Mark-to-Market Capital Costs
 
2017 Forecast(2)
 
2018 Forecast(2)
 
 
(In millions)
 
 
Regulated Distribution
 
$
1,327

 
$
46

 
$
1,281

 
$
1,325

 
$
1,305

Regulated Transmission(4)
 
1,005

 
4

 
1,001

 
1,000

 
1,000

CES(3)
 
547

 
(3
)
 
550

 
365

 
290

Corporate/Other
 
93

 

 
93

 
95

 
90

Total
 
$
2,972

 
$
47

 
$
2,925

 
$
2,785

 
$
2,685


(1) Includes an increase of approximately $47 million related to the capital component of the pension and OPEB mark-to-market adjustment.  
(2) Excludes the capital component for pension and OPEB mark-to-market adjustments, which cannot be estimated.  
(3) Approximately $35 million and $20 million of forecasted annual capital expenditures are associated with the Pleasants power station for 2017 and 2018, respectively. On February 3, 2017, AE Supply offered the Pleasants power station into MP's RFP, as discussed above.
(4) 2018 Forecast represents the mid-point of Regulated Transmission's 2018 forecasted capital expenditures of $800 million to $1,200 million.

Additionally, planned capital expenditures in 2018 and 2019 for Regulated Distribution are approximately $1.3 billion while planned capital expenditures for Regulated Transmission are expected to be approximately $800 million to $1.2 billion, annually, from 2019 through 2021.

Capital expenditures for 2016 and anticipated expenditures for 2017 by subsidiary are included in the following table (anticipated capital expenditures by subsidiary for 2018 are not finalized):
Operating Company
 
2016 Actual(1)
 
2016 Pension/OPEB Mark-to-Market Capital Costs
 
2016 Actual Excluding Pension/OPEB Mark-to-Market Capital Costs
 
2017 Forecast(2)
 
 
 
(In millions)
OE
 
$
163

 
$
7

 
$
156

 
$
145

 
Penn
 
50

 
3

 
47

 
45

 
CEI
 
158

 
25

 
133

 
125

 
TE
 
46

 
2

 
44

 
45

 
JCP&L
 
399

 
17

 
382

 
350

 
ME
 
139

 
6

 
133

 
135

 
PN
 
184

 
1

 
183

 
160

 
MP
 
242

 
(6
)
 
248

 
250

 
PE
 
103

 
(5
)
 
108

 
125

 
WP
 
166

 

 
166

 
205

 
ATSI
 
487

 

 
487

 
420

 
TrAIL
 
217

 

 
217

 
60

 
FES
 
470

 
(3
)
 
473

 
320

 
AE Supply(3)
 
63

 

 
63

 
45

 
MAIT
 

 

 

 
260

 
Other subsidiaries
 
85

 

 
85

 
95

 
Total
 
$
2,972

 
$
47

 
$
2,925

 
$
2,785

 


14




(1) Includes an increase of approximately $47 million related to the capital component of the pension and OPEB mark-to-market adjustment.  
(2) Excludes the capital component for pension and OPEB mark-to-market adjustments, which cannot be estimated.  
(3) Approximately $35 million of forecasted annual capital expenditures are associated with the Pleasants power station for 2017. On February 3, 2017, AE Supply offered the Pleasants power station into MP's RFP, as discussed above.

The following table presents scheduled debt repayments for outstanding long-term debt as of December 31, 2016, excluding capital leases for the next five years. PCRBs that are scheduled to be tendered for mandatory purchase prior to maturity are reflected in the applicable year in which such PCRBs are scheduled to be tendered.
 
2017
 
2018-2021
 
Total
 
(In millions)
FirstEnergy
$
1,641

 
$
6,031

 
$
7,672

FES
$
163

 
$
2,435

 
$
2,598


The following tables display consolidated operating lease commitments as of December 31, 2016.
 
 
 
Operating Leases
 
FirstEnergy
 
 
(In millions)
 
2017(1)
 
$
125

 
2018
 
142

 
2019
 
123

 
2020
 
97

 
2021
 
119

 
Years thereafter
 
1,351

 
Total minimum lease payments
 
$
1,957

 

(1) Includes a $3 million payment PNBV Trust will receive associated with certain sale and leaseback transactions. These arrangements, which expire in 2017, effectively reduce lease costs related to those transactions.

Operating Leases
 
FES
 
 
(In millions)
2017
 
$
82

2018
 
101

2019
 
97

2020
 
68

2021
 
93

Years thereafter
 
1,222

Total minimum lease payments
 
$
1,663


FirstEnergy’s business is capital intensive, requiring significant resources to fund operating expenses, construction expenditures, scheduled debt maturities and interest payments, dividend payments, and contributions to its pension plan.

FE, and its utility and transmission subsidiaries, expect their existing sources of liquidity to remain sufficient to meet their respective anticipated obligations. In addition to internal sources to fund liquidity and capital requirements for 2017 and beyond, FE and its utility and transmission subsidiaries expect to rely on external sources of funds. Short-term cash requirements not met by cash provided from operations are generally satisfied through short-term borrowings. Long-term cash needs, including cash requirements to fund Regulated Transmission's capital program, may be met through a combination of an additional $500 million of equity in each year 2017 through 2019, and new long-term debt, in each case, subject to market conditions and other factors. FirstEnergy also expects to issue long-term debt at certain Utilities to, among other things, refinance short-term and maturing long-term debt, subject to market conditions and other factors.

FirstEnergy’s unregulated subsidiaries, specifically FES and AE Supply, expect to rely on, in the case of AE Supply, internal sources, the unregulated companies' money pool, and proceeds generated from previously disclosed asset sales, subject to closing, and with respect to FES, a two-year secured line of credit with FE of up to $500 million, as further described below. Additionally, FES subsidiaries have debt maturities in 2017 and 2018 of $130 million and $515 million, respectively. The inability to refinance such debt maturities could cause FES to take one or more of the following actions: (i) restructuring of debt and other financial obligations,

15




(ii) additional borrowings under its credit facility with FE, (iii) further asset sales or plant deactivations, and/or (iv) seek protection under U.S. bankruptcy laws. In the event FES seeks such protection, FENOC may similarly seek protection under U.S. bankruptcy laws.

In 2016, FirstEnergy satisfied its minimum required funding obligations of $382 million and addressed funding obligations for future years to its qualified pension plan with total contributions of $882 million (of which $138 million was cash contributions from FES), including $500 million of FE common stock contributed to the qualified pension plan on December 13, 2016.

Any financing plans by FE or any of its subsidiaries, including the issuance of equity and debt, and the refinancing of short-term and maturing long-term debt, are subject to market conditions and other factors, such as the impact of the current energy and capacity markets and potential credit rating changes. No assurance can be given that any such issuances, financing or refinancing, as the case may be, will be completed as anticipated. Any delay in the completion of financing plans could require FE or any of its subsidiaries to utilize short-term borrowing capacity, which would impact available liquidity. In particular, FES may borrow under its credit facility with FE, to the extent available, to refinance debt maturities and mandatory purchase obligations, which would impact available liquidity for FES and, FE to the extent it funds any such borrowings through its facility and/or cash. In addition, FE and its subsidiaries expect to continually evaluate any planned financings, which may result in changes from time to time.

On December 6, 2016, FE and certain subsidiaries entered into new five-year syndicated credit facilities available through December 6, 2021, and concurrently terminated existing syndicated credit facilities that were to expire March 31, 2019, as follows:

FE and the Utilities entered into a new $4 billion revolving credit facility, which represents an increase of $500 million over the existing $3.5 billion facility it replaced,
FET and its subsidiaries entered into a $1 billion revolving credit facility, which replaced their existing $1 billion facility, and
FES and AE Supply terminated their unsecured $1.5 billion credit facility (commitments of $900 million and $600 million for FES and AE Supply, respectively) and FES entered into a new, two-year secured credit facility with FE in which FE provided a committed line of credit to FES of up to $500 million and additional credit support of up to $200 million to cover a $169 million surety bond for the benefit of the PA DEP with respect to LBR, and other bonds as designated in writing to FE. In connection with the cancellation of the prior FES/AE Supply facility and entry into the new FES secured facility with FE, certain commitments and amendments associated with shared services and operational matters were made including, without limitation, as follows: (i) FE reaffirmed its obligations under the Intercompany Tax Allocation Agreement, and (ii) amendments to the Service Agreement by and among FESC, FES, FG and NG, to prevent termination until the earlier of December 31, 2018, or a change in control of FES or its subsidiaries.

FE, the Utilities and FET and its subsidiaries may use borrowings under their new facilities for working capital and other general corporate purposes, including intercompany loans and advances by a borrower to any of its subsidiaries. FES expects to use its new facility with FE to conduct its ordinary course of business in lieu of borrowing under the unregulated money pool. The new facility matures on December 31, 2018, and is secured by FMBs issued by FG ($250 million) and NG ($450 million).

Additionally, on December 6, 2016, FE terminated its existing $1 billion and $200 million term loan credit agreements and entered into a new $1.2 billion five-year syndicated term loan credit agreement. The term loan contains covenants and other terms and conditions substantially similar to those of the FE revolving credit facility described above, including a consolidated debt to total capitalization ratio and minimum interest coverage ratio requirement.

Under the terms of the new FE and FET credit facilities, each borrower is required to maintain a consolidated debt to total capitalization ratio, as defined, of no more than 0.65 to 1.00, or in the case of FET, 0.75 to 1.00. For purposes of calculating its ratio, FE is permitted certain adjustments to total capitalization including (i) an exclusion for certain previously incurred after-tax, non-cash write-downs and non-cash charges of approximately $2.75 billion and (ii) a new exclusion for additional after-tax, non-cash write-downs and non-cash charges up to $5.5 billion related to asset impairments attributable to the power generation assets owned by FES, AE Supply and each of their subsidiaries. Additionally, under the new credit facility, FE is now also required to maintain a minimum interest coverage ratio of 1.75 to 1.00 until December 31, 2017, 2.00 to 1.00 beginning January 1, 2018 until December 31, 2018, 2.25 to 1.00 beginning January 1, 2019 until December 31, 2019, and 2.50 to 1.00 beginning January 1, 2020 until December 31, 2021. FE and each of the other borrowers under the new FE and FET credit facilities are currently in compliance with these financial covenants. In the case of FE, the impairment charges recognized in the fourth quarter of 2016 described above are excluded from FE's calculation of total capitalization pursuant to the new $5.5 billion after-tax exclusion referenced in (ii) above consistent with the terms of the facility. Other terms of the new FE credit facility exclude FES and AE Supply from the definition of “significant subsidiaries,” which removes them from FE’s covenants and defaults resulting from adverse judgments in excess of $100 million and eliminates lender approvals previously required for FES and AE Supply asset sales.

Outstanding alternate base rate advances under the new FE and FET facilities will bear interest at a fluctuating interest rate per annum equal to the sum of an applicable margin for alternate base rate advances determined by reference to the applicable borrower’s then-current senior unsecured non-credit enhanced debt ratings (reference ratings) plus the highest of (i) the “prime rate” published by the Wall Street Journal from time to time, (ii) the sum of 1/2 of 1% per annum plus the federal funds rate in effect from time to time and (iii) the LIBOR for a one-month interest period plus 1%. Outstanding Eurodollar rate advances will bear interest at LIBOR for interest periods of one week or one, two, three or six months plus an applicable margin determined by reference to the applicable borrower’s reference ratings. Swing line loans under the new FE facility will bear interest at a rate per annum equal

16




to the sum of the alternate base rate plus an applicable margin determined by reference to the applicable borrower’s reference ratings. Changes in reference ratings of a borrower would lower or raise its applicable margin depending on whether ratings improved or were lowered, respectively.

The initial borrowing under the new $1.2 billion FE term loan, which took the form of a Eurodollar rate advance, may be converted from time to time, in whole or in part, to alternate base rate advances or other Eurodollar rate advances. Outstanding alternate base rate advances will bear interest at a fluctuating interest rate per annum equal to the sum of an applicable margin for alternate base rate advances determined by reference to FE’s reference ratings plus the highest of (i) the administrative agent’s publicly-announced “prime rate”, (ii) the sum of 1/2 of 1% per annum plus the Federal Funds Rate in effect from time to time and (iii) the rate of interest per annum appearing on a nationally-recognized service such as the Dow Jones Market Service (Telerate) equal to one-month LIBOR on each day plus 1%. Outstanding Eurodollar rate advances will bear interest at LIBOR for interest periods of one week or one, two, three or six months plus an applicable margin determined by reference to FE’s reference ratings. Changes in FE’s reference ratings would lower or raise its applicable margin depending on whether ratings improved or were lowered, respectively.

On February 16, 2017, FE entered into two separate $125 million three-year term loan credit agreements with Bank of America, N.A. and The Bank of Nova Scotia, respectively, the proceeds of which were used to reduce short-term debt. The terms and conditions of these new credit agreements are substantially similar to the December 6, 2016, $1.2 billion five-year syndicated term loan credit agreement.

FirstEnergy had $2,675 million and $1,708 million of short-term borrowings as of December 31, 2016 and 2015, respectively. FirstEnergy’s available liquidity from external sources as of January 31, 2017 was as follows:

Borrower(s)
 
Type
 
Maturity
 
Commitment
 
Available Liquidity
 
 
 
 
 
 
(In millions)
FirstEnergy(1)
 
Revolving
 
December 2021
 
$
4,000

 
$
1,341

FET(2)
 
Revolving
 
December 2021
 
1,000

 
1,000

 
 
 
 
Subtotal
 
$
5,000

 
$
2,341

 
 
 
 
Cash
 

 
308

 
 
 
 
Total
 
$
5,000

 
$
2,649


(1) 
FE and the Utilities.
(2) 
Includes FET, ATSI and TrAIL.

FES had $101 million (payable to AE Supply) and $8 million of short-term borrowings as of December 31, 2016 and 2015, respectively. FES' available liquidity as of January 31, 2017 was as follows:
Type
 
Commitment
 
Available Liquidity
 
 
(In millions)
Two-year secured credit facility with FE
 
$
500

 
$
500

Cash
 

 
2

 
 
$
500

 
$
502





17




Nuclear Operating Licenses

The following table summarizes the current operating license expiration dates for FES' nuclear facilities in service.
Station
 
In-Service Date
 
Current License Expiration
Beaver Valley Unit 1
 
1976
 
2036
Beaver Valley Unit 2
 
1987
 
2047
Perry
 
1986
 
2026
Davis-Besse
 
1977
 
2037
Nuclear Regulation

Under NRC regulations, FirstEnergy must ensure that adequate funds will be available to decommission its nuclear facilities. As of December 31, 2016, FirstEnergy had approximately $2.5 billion invested in external trusts to be used for the decommissioning and environmental remediation of Davis-Besse, Beaver Valley, Perry and TMI-2. The values of FirstEnergy's NDTs fluctuate based on market conditions. If the value of the trusts decline by a material amount, FirstEnergy's obligation to fund the trusts may increase. Disruptions in the capital markets and their effects on particular businesses and the economy could also affect the values of the NDTs. FE and FES have also entered into a total of $24.5 million in parental guarantees in support of the decommissioning of the spent fuel storage facilities located at the nuclear facilities. As FES no longer maintains investment grade credit ratings from either S&P or Moody’s, NG funded a $10 million supplemental trust in 2016 in lieu of the FES parental guarantee that would be required to support the decommissioning of the spent fuel storage facilities. The termination of the FES parental guarantee is subject to NRC review. As required by the NRC, FirstEnergy annually recalculates and adjusts the amount of its parental guarantees, as appropriate.

As part of routine inspections of the concrete shield building at Davis-Besse in 2013, FENOC identified changes to the subsurface laminar cracking condition originally discovered in 2011. These inspections revealed that the cracking condition had propagated a small amount in select areas. FENOC's analysis confirms that the building continues to maintain its structural integrity, and its ability to safely perform all of its functions. In a May 28, 2015, Inspection Report regarding the apparent cause evaluation on crack propagation, the NRC issued a non-cited violation for FENOC’s failure to request and obtain a license amendment for its method of evaluating the significance of the shield building cracking. The NRC also concluded that the shield building remained capable of performing its design safety functions despite the identified laminar cracking and that this issue was of very low safety significance. FENOC plans to submit a license amendment application to the NRC related to the laminar cracking in the Shield Building.

On March 12, 2012, the NRC issued orders requiring safety enhancements at U.S. reactors based on recommendations from the lessons learned Task Force review of the accident at Japan's Fukushima Daiichi nuclear power plant. These orders require additional mitigation strategies for beyond-design-basis external events, and enhanced equipment for monitoring water levels in spent fuel pools. The NRC also requested that licensees including FENOC re-analyze earthquake and flooding risks using the latest information available, conduct earthquake and flooding hazard walkdowns at their nuclear plants, assess the ability of current communications systems and equipment to perform under a prolonged loss of onsite and offsite electrical power and assess plant staffing levels needed to fill emergency positions. Although a majority of the necessary modifications and upgrades at FirstEnergy’s nuclear facilities have been implemented, the improvements still remain subject to regulatory approval.

FES provides a parental support agreement to NG of up to $400 million. The NRC typically relies on such parental support agreements to provide additional assurance that U.S. merchant nuclear plants, including NG's nuclear units have the necessary financial resources to maintain safe operations, particularly in the event of extraordinary circumstances. In addition to the $500 million credit facility with FE discussed above, FE is working with FES to establish conditional credit support on terms and conditions to be agreed upon for the $400 million FES parental support agreement that is currently in place for the benefit of NG in the event that FES is unable to provide the necessary support to NG.
Nuclear Insurance

The Price-Anderson Act limits the public liability which can be assessed with respect to a nuclear power plant to $13.3 billion (assuming 102 units licensed to operate) for a single nuclear incident, which amount is covered by: (i) private insurance amounting to $375 million; and (ii) $13 billion provided by an industry retrospective rating plan required by the NRC pursuant thereto. Under such retrospective rating plan, in the event of a nuclear incident at any unit in the United States resulting in losses in excess of private insurance, up to $127 million (but not more than $19 million per unit per year in the event of more than one incident) must be contributed for each nuclear unit licensed to operate in the country by the licensees thereof to cover liabilities arising out of the incident. Based on their present nuclear ownership and leasehold interests, FirstEnergy’s maximum potential assessment under these provisions would be $509 million (NG-$506 million) per incident but not more than $76 million (NG-$75 million) in any one year for each incident.

In addition to the public liability insurance provided pursuant to the Price-Anderson Act, NG purchases insurance coverage in limited amounts for economic loss and property damage arising out of nuclear incidents. NG is a Member Insured of NEIL, which provides coverage for the extra expense of replacement power incurred due to prolonged accidental outages of nuclear units. NG, as the Member Insured and each entity with an insurable interest, purchases policies, renewable annually, corresponding to their respective nuclear interests, which provide an aggregate indemnity of up to approximately $1.40 billion (NG-$1.39 billion) for replacement power costs incurred during an outage after an initial 12-week waiting period.


18




NG, as the Member Insured and each entity with an insurable interest, is insured under property damage insurance provided by NEIL. Under these arrangements, up to $2.75 billion of coverage for decontamination costs, decommissioning costs, debris removal and repair and/or replacement of property is provided. Member Insureds of NEIL pay annual premiums and are subject to retrospective premium assessments if losses exceed the accumulated funds available to the insurer. NG purchases insurance through NEIL that will pay its obligation in the event a retrospective premium call is made by NEIL, subject to the terms of the policy.

FirstEnergy intends to maintain insurance against nuclear risks as described above as long as it is available. To the extent that replacement power, property damage, decontamination, decommissioning, repair and replacement costs and other such costs arising from a nuclear incident at any of NG's plants exceed the policy limits of the insurance in effect with respect to that plant, to the extent a nuclear incident is determined not to be covered by FirstEnergy’s insurance policies, or to the extent such insurance becomes unavailable in the future, FirstEnergy would remain at risk for such costs.

The NRC requires nuclear power plant licensees to obtain minimum property insurance coverage of $1.06 billion or the amount generally available from private sources, whichever is less. The proceeds of this insurance are required to be used first to ensure that the licensed reactor is in a safe and stable condition and can be maintained in that condition so as to prevent any significant risk to the public health and safety. Within 30 days of stabilization, the licensee is required to prepare and submit to the NRC a cleanup plan for approval. The plan is required to identify all cleanup operations necessary to decontaminate the reactor sufficiently to permit the resumption of operations or to commence decommissioning. Any property insurance proceeds not already expended to place the reactor in a safe and stable condition must be used first to complete those decontamination operations that are ordered by the NRC. FirstEnergy is unable to predict what effect these requirements may have on the availability of insurance proceeds.
Environmental Matters

Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality and other environmental matters. Compliance with environmental regulations could have a material adverse effect on FirstEnergy's earnings and competitive position to the extent that FirstEnergy competes with companies that are not subject to such regulations and, therefore, do not bear the risk of costs associated with compliance, or failure to comply, with such regulations.

Clean Air Act

FirstEnergy complies with SO2 and NOx emission reduction requirements under the CAA and SIP(s) by burning lower-sulfur fuel, utilizing combustion controls and post-combustion controls, generating more electricity from lower or non-emitting plants and/or using emission allowances.

CSAPR requires reductions of NOx and SO2 emissions in two phases (2015 and 2017), ultimately capping SO2 emissions in affected states to 2.4 million tons annually and NOx emissions to 1.2 million tons annually. CSAPR allows trading of NOx and SO2 emission allowances between power plants located in the same state and interstate trading of NOx and SO2 emission allowances with some restrictions. The U.S. Court of Appeals for the D.C. Circuit ordered the EPA on July 28, 2015, to reconsider the CSAPR caps on NOx and SO2 emissions from power plants in 13 states, including Ohio, Pennsylvania and West Virginia. This follows the 2014 U.S. Supreme Court ruling generally upholding EPA’s regulatory approach under CSAPR, but questioning whether EPA required upwind states to reduce emissions by more than their contribution to air pollution in downwind states. EPA issued a CSAPR update rule on September 7, 2016, reducing summertime NOx emissions from power plants in 22 states in the eastern U.S., including Ohio, Pennsylvania and West Virginia, beginning in 2017. Various states and other stakeholders appealed the CSAPR update rule to the D.C. Circuit in November and December 2016. Depending on the outcome of the appeals and on how the EPA and the states implement CSAPR, the future cost of compliance may be material and changes to FirstEnergy's and FES' operations may result.

The EPA tightened the primary and secondary NAAQS for ozone from the 2008 standard levels of 75 PPB to 70 PPB on October 1, 2015. The EPA stated the vast majority of U.S. counties will meet the new 70 PPB standard by 2025 due to other federal and state rules and programs but the EPA will designate those counties that fail to attain the new 2015 ozone NAAQS by October 1, 2017. States will then have roughly three years to develop implementation plans to attain the new 2015 ozone NAAQS. Depending on how the EPA and the states implement the new 2015 ozone NAAQS, the future cost of compliance may be material and changes to FirstEnergy’s and FES’ operations may result. In August 2016, the State of Delaware filed a CAA Section 126 petition with the EPA alleging that the Harrison generating facility's NOx emissions significantly contribute to Delaware's inability to attain the ozone NAAQS. The petition seeks a short term NOx emission rate limit of 0.125 lb/mmBTU over an averaging period of no more than 24 hours. On September 27, 2016, the EPA extended the time frame for acting on the State of Delaware's CAA Section 126 petition by six months to April 7, 2017. In November 2016, the State of Maryland filed a CAA Section 126 petition with the EPA alleging that NOx emissions from 36 EGUs, including Harrison Units 1, 2 and 3, Mansfield Unit 1 and Pleasants Units 1 and 2, significantly contribute to Maryland's inability to attain the ozone NAAQS. The petition seeks NOx emission rate limits for the 36 EGUs by May 1, 2017. On January 3, 2017, the EPA extended the time frame for acting on the CAA Section 126 petition by six months to July 15, 2017. FirstEnergy is unable to predict the outcome of these matters or estimate the loss or range of loss.

MATS imposes emission limits for mercury, PM, and HCl for all existing and new fossil fuel fired electric generating units effective in April 2015 with averaging of emissions from multiple units located at a single plant. FirstEnergy's total capital cost for compliance (over the 2012 to 2018 time period) is currently expected to be approximately $345 million (CES segment of $168 million and

19




Regulated Distribution segment of $177 million), of which $286 million has been spent through December 31, 2016 ($125 million at CES and $161 million at Regulated Distribution).

On August 3, 2015, FG, a subsidiary of FES, submitted to the AAA office in New York, N.Y., a demand for arbitration and statement of claim against BNSF and CSX seeking a declaration that MATS constituted a force majeure event that excuses FG’s performance under its coal transportation contract with these parties. Specifically, the dispute arises from a contract for the transportation by BNSF and CSX of a minimum of 3.5 million tons of coal annually through 2025 to certain coal-fired power plants owned by FG that are located in Ohio. As a result of and in compliance with MATS, all plants covered by this contract were deactivated by April 16, 2015. In January 2012, FG notified BNSF and CSX that MATS constituted a force majeure event under the contract that excused FG’s further performance. Separately, on August 4, 2015, BNSF and CSX submitted to the AAA office in Washington, D.C., a demand for arbitration and statement of claim against FG alleging that FG breached the contract and that FG’s declaration of a force majeure under the contract is not valid and seeking damages under the contract through 2025. On May 31, 2016, the parties agreed to a stipulation that if FG’s force majeure defense is determined to be wholly or partially invalid, liquidated damages are the sole remedy available to BNSF and CSX. The arbitration panel consolidated the claims and held a liability hearing from November 28, 2016, through December 9, 2016, and, if necessary, a damages hearing is scheduled to begin on May 8, 2017. The decision on liability is expected to be issued within sixty days from the end of the liability hearing proceedings, which are scheduled to conclude February 24, 2017. FirstEnergy and FES continue to believe that MATS constitutes a force majeure event under the contract as it relates to the deactivated plants and that FG’s performance under the contract is therefore excused. FG intends to vigorously assert its position in the arbitration proceedings. If, however, the arbitration panel rules in favor of BNSF and CSX, the results of operations and financial condition of both FirstEnergy and FES could be materially adversely impacted. Refer to "The Companies - Competitive Generation" above for possible actions that may be taken by FES in the event of an adverse outcome, including, without limitation, seeking protection under U.S. bankruptcy laws. FirstEnergy and FES are unable to estimate the loss or range of loss.

On December 22, 2016, FG, a wholly owned subsidiary of FES, received a demand for arbitration and statement of claim from BNSF and NS who are the counterparties to the coal transportation contract covering the delivery of 2.5 million tons annually through 2025, for FG’s coal-fired Bay Shore Units 2-4, deactivated on September 1, 2012, as a result of the EPA’s MATS and for FG’s W.H. Sammis Plant. The demand for arbitration was submitted to the AAA office in Washington, D.C. against FG alleging, among other things, that FG breached the agreement in 2015 and 2016 and repudiated the agreement for 2017-2025. The counterparties are seeking, among other things, damages, including lost profits through 2025, and a declaratory judgment that FG's claim of force majeure is invalid. FG intends to vigorously assert its position in this arbitration proceeding. If it were ultimately determined that the force majeure provisions or other defenses do not excuse the delivery shortfalls, the results of operations and financial condition of both FirstEnergy and FES could be materially adversely impacted. Refer to "The Companies - Competitive Generation" above for possible actions that may be taken by FES in the event of an adverse outcome, including, without limitation, seeking protection under U.S. bankruptcy laws. FirstEnergy and FES are unable to estimate the loss or range of loss.

As to both coal transportation agreements referenced in the above arbitration proceedings, FG paid approximately $70 million in the aggregate in liquidated damages to settle delivery shortfalls in 2014 related to its deactivated plants, which approximated full liquidated damages under the agreements for such year related to the plant deactivations. Liquidated damages for the period 2015-2025 remain in dispute under both coal transportation agreements.

As to a specific coal supply agreement, AE Supply asserted termination rights effective in 2015 as a result of MATS. In response to notification of the termination, the coal supplier commenced litigation alleging AE Supply does not have sufficient justification to terminate the agreement. AE Supply has filed an answer denying any liability related to the termination. This matter is currently in the discovery phase of litigation and no trial date has been established. There are approximately 5.5 million tons remaining under the contract for delivery. At this time, AE Supply cannot estimate the loss or range of loss regarding the ongoing litigation with respect to this agreement.

In September 2007, AE received an NOV from the EPA alleging NSR and PSD violations under the CAA, as well as Pennsylvania and West Virginia state laws at the coal-fired Hatfield's Ferry and Armstrong plants in Pennsylvania and the coal-fired Fort Martin and Willow Island plants in West Virginia. The EPA's NOV alleges equipment replacements during maintenance outages triggered the pre-construction permitting requirements under the NSR and PSD programs. On June 29, 2012, January 31, 2013, March 27, 2013 and October 18, 2016, EPA issued CAA section 114 requests for the Harrison coal-fired plant seeking information and documentation relevant to its operation and maintenance, including capital projects undertaken since 2007. On December 12, 2014, EPA issued a CAA section 114 request for the Fort Martin coal-fired plant seeking information and documentation relevant to its operation and maintenance, including capital projects undertaken since 2009. FirstEnergy intends to comply with the CAA but, at this time, is unable to predict the outcome of this matter or estimate the loss or range of loss.
 
Climate Change

FirstEnergy has established a goal to reduce CO2 emissions by 90% below 2005 levels by 2045. There are a number of initiatives to reduce GHG emissions at the state, federal and international level. Certain northeastern states are participating in the RGGI and western states led by California, have implemented programs, primarily cap and trade mechanisms, to control emissions of certain GHGs. Additional policies reducing GHG emissions, such as demand reduction programs, renewable portfolio standards and renewable subsidies have been implemented across the nation.

20





The EPA released its final “Endangerment and Cause or Contribute Findings for Greenhouse Gases under the Clean Air Act” in December 2009, concluding that concentrations of several key GHGs constitutes an "endangerment" and may be regulated as "air pollutants" under the CAA and mandated measurement and reporting of GHG emissions from certain sources, including electric generating plants. On June 23, 2014, the United States Supreme Court decided that CO2 or other GHG emissions alone cannot trigger permitting requirements under the CAA, but that air emission sources that need PSD permits due to other regulated air pollutants can be required by the EPA to install GHG control technologies. The EPA released its final regulations in August 2015 (which have been stayed by the U.S. Supreme Court), to reduce CO2 emissions from existing fossil fuel fired electric generating units that would require each state to develop SIPs by September 6, 2016, to meet the EPA’s state specific CO2 emission rate goals. The EPA’s CPP allows states to request a two-year extension to finalize SIPs by September 6, 2018. If states fail to develop SIPs, the EPA also proposed a federal implementation plan that can be implemented by the EPA that included model emissions trading rules which states can also adopt in their SIPs. The EPA also finalized separate regulations imposing CO2 emission limits for new, modified, and reconstructed fossil fuel fired electric generating units. Numerous states and private parties filed appeals and motions to stay the CPP with the U.S. Court of Appeals for the D.C. Circuit in October 2015. On January 21, 2016, a panel of the D.C. Circuit denied the motions for stay and set an expedited schedule for briefing and argument. On February 9, 2016, the U.S. Supreme Court stayed the rule during the pendency of the challenges to the D.C. Circuit and U.S. Supreme Court. Depending on the outcome of further appeals and how any final rules are ultimately implemented, the future cost of compliance may be material.

At the international level, the United Nations Framework Convention on Climate Change resulted in the Kyoto Protocol requiring participating countries, which does not include the U.S., to reduce GHGs commencing in 2008 and has been extended through 2020. The Obama Administration submitted in March 2015, a formal pledge for the U.S. to reduce its economy-wide greenhouse gas emissions by 26 to 28 percent below 2005 levels by 2025 and joined in adopting the agreement reached on December 12, 2015 at the United Nations Framework Convention on Climate Change meetings in Paris. The Paris Agreement was ratified by the requisite number of countries (i.e. at least 55 countries representing at least 55% of global GHG emissions) in October 2016 and its non-binding obligations to limit global warming to well below two degrees Celsius are effective on November 4, 2016. It remains unclear whether and how the results of the 2016 United States election could impact the regulation of GHG emissions at the federal and state level. FirstEnergy cannot currently estimate the financial impact of climate change policies, although potential legislative or regulatory programs restricting CO2 emissions, or litigation alleging damages from GHG emissions, could require material capital and other expenditures or result in changes to its operations. The CO2 emissions per KWH of electricity generated by FirstEnergy is lower than many of its regional competitors due to its diversified generation sources, which include low or non-CO2 emitting gas-fired and nuclear generators.

Clean Water Act

Various water quality regulations, the majority of which are the result of the federal CWA and its amendments, apply to FirstEnergy's plants. In addition, the states in which FirstEnergy operates have water quality standards applicable to FirstEnergy's operations.

The EPA finalized CWA Section 316(b) regulations in May 2014, requiring cooling water intake structures with an intake velocity greater than 0.5 feet per second to reduce fish impingement when aquatic organisms are pinned against screens or other parts of a cooling water intake system to a 12% annual average and requiring cooling water intake structures exceeding 125 million gallons per day to conduct studies to determine site-specific controls, if any, to reduce entrainment, which occurs when aquatic life is drawn into a facility's cooling water system. FirstEnergy is studying various control options and their costs and effectiveness, including pilot testing of reverse louvers in a portion of the Bay Shore plant's cooling water intake channel to divert fish away from the plant's cooling water intake system. Depending on the results of such studies and any final action taken by the states based on those studies, the future capital costs of compliance with these standards may be material.

On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic, mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations will phase-in as permits are renewed on a five-year cycle from 2018 to 2023. The final rule also allows plants to commit to more stringent effluent limits for wet scrubber systems based on evaporative technology and in return have until the end of 2023 to meet the more stringent limits. Depending on the outcome of appeals and how any final rules are ultimately implemented, the future costs of compliance with these standards may be substantial and changes to FirstEnergy's and FES' operations may result.

In October 2009, the WVDEP issued an NPDES water discharge permit for the Fort Martin plant, which imposes TDS, sulfate concentrations and other effluent limitations for heavy metals, as well as temperature limitations. Concurrent with the issuance of the Fort Martin NPDES permit, WVDEP also issued an administrative order setting deadlines for MP to meet certain of the effluent limits that were effective immediately under the terms of the NPDES permit. MP appealed, and a stay of certain conditions of the NPDES permit and order have been granted pending a final decision on the appeal and subject to WVDEP moving to dissolve the stay. The Fort Martin NPDES permit could require an initial capital investment ranging from $150 million to $300 million in order to install technology to meet the TDS and sulfate limits, which technology may also meet certain of the other effluent limits. Additional technology may be needed to meet certain other limits in the Fort Martin NPDES permit. MP intends to vigorously pursue these issues but cannot predict the outcome of the appeal or estimate the possible loss or range of loss.


21




FirstEnergy intends to vigorously defend against the CWA matters described above but, except as indicated above, cannot predict their outcomes or estimate the loss or range of loss.

Regulation of Waste Disposal

Federal and state hazardous waste regulations have been promulgated as a result of the RCRA, as amended, and the Toxic Substances Control Act. Certain coal combustion residuals, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA's evaluation of the need for future regulation.

In December 2014, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards regarding landfill design, structural integrity design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to assure the safe disposal of CCRs from electric generating plants. Based on an assessment of the finalized regulations, the future cost of compliance and expected timing of spend had no significant impact on FirstEnergy's or FES' existing AROs associated with CCRs. Although not currently expected, any changes in timing and closure plan requirements in the future, including changes resulting from the strategic review at CES, could materially and adversely impact FirstEnergy's and FES' AROs.

Pursuant to a 2013 consent decree, PA DEP issued a 2014 permit for the Little Blue Run CCR impoundment requiring the Bruce Mansfield plant to cease disposal of CCRs by December 31, 2016 and FG to provide bonding for 45 years of closure and post-closure activities and to complete closure within a 12-year period, but authorizing FG to seek a permit modification based on "unexpected site conditions that have or will slow closure progress." The permit does not require active dewatering of the CCRs, but does require a groundwater assessment for arsenic and abatement if certain conditions in the permit are met. The CCRs from the Bruce Mansfield plant are being beneficially reused with the majority used for reclamation of a site owned by the Marshall County Coal Company in Moundsville, W. Va. and the remainder recycled into drywall by National Gypsum. These beneficial reuse options should be sufficient for ongoing plant operations, however, the Bruce Mansfield plant is pursuing other options. On May 22, 2015 and September 21, 2015, the PA DEP reissued a permit for the Hatfield's Ferry CCR disposal facility and then modified that permit to allow disposal of Bruce Mansfield plant CCR. On July 6, 2015 and October 22, 2015, the Sierra Club filed Notices of Appeal with the Pennsylvania Environmental Hearing Board challenging the renewal, reissuance and modification of the permit for the Hatfield’s Ferry CCR disposal facility.

FirstEnergy or its subsidiaries have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the CERCLA. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheets as of December 31, 2016 based on estimates of the total costs of cleanup, FE's and its subsidiaries' proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $137 million have been accrued through December 31, 2016. Included in the total are accrued liabilities of approximately $89 million for environmental remediation of former manufactured gas plants and gas holder facilities in New Jersey, which are being recovered by JCP&L through a non-bypassable SBC. FirstEnergy or its subsidiaries could be found potentially responsible for additional amounts or additional sites, but the loss or range of loss cannot be determined or reasonably estimated at this time.
Fuel Supply

FirstEnergy currently has coal contracts with various terms to acquire approximately 18 million tons of coal for the year 2017, which is approximately 88% of its forecasted 2017 coal requirements. This contracted coal is produced primarily from mines located in Ohio, Pennsylvania, and West Virginia. The contracts expire at various times through 2028. See "Environmental Matters" for additional information pertaining to the impact of increased environmental regulations on coal supply and transportation contracts applicable to certain deactivated coal-fired generating units and related pending disputes.

FirstEnergy has contracts for all uranium requirements through 2018 and a portion of uranium material requirements through 2024. Conversion services contracts fully cover requirements through 2018 and partially fill requirements through 2024. Enrichment services are contracted for essentially all of the enrichment requirements for nuclear fuel through 2020. A portion of enrichment requirements is also contracted for through 2030. Fabrication services for fuel assemblies are contracted for both Beaver Valley units through 2029 and Davis-Besse through 2025 and through the current operating license period for Perry.

On-site spent fuel storage facilities are currently adequate for the nuclear operating units. An on-site dry cask storage facility has been constructed at Beaver Valley sufficient to extend spent fuel storage capacity through the end of current operating licenses at Beaver Valley Unit 1 and Beaver Valley Unity 2. Davis-Besse is planning to resume dry cask storage operations in 2017, which will extend on-site spent fuel storage capacity through the end of its recently extended operating license. Perry has constructed an on-site dry cask storage facility, has completed three dry cask storage loading campaigns, and has planned to conduct additional dry cask storage loading campaigns that will provide for sufficient spent fuel storage capacity through 2046 (end of current operating license plus a 20-year operating license extension).

The Federal Nuclear Waste Policy Act of 1982 provided for the construction of facilities for the permanent disposal of high-level nuclear wastes, including spent fuel from nuclear power plants operated by electric utilities. NG has contracts with the DOE for the

22




disposal of spent fuel for Beaver Valley, Davis-Besse and Perry. Yucca Mountain was approved in 2002 as a repository for underground disposal of spent nuclear fuel from nuclear power plants and high level waste from U.S. defense programs. The DOE submitted the license application for Yucca Mountain to the NRC on June 3, 2008. Efforts to complete the Yucca Mountain repository have been suspended and a Federal review of potential alternative strategies has been performed.

In light of this uncertainty, FirstEnergy has made arrangements for storage capacity as a contingency for the continuing delays of the DOE acceptance of spent fuel for disposal.

Natural gas demand at the combined cycle and peaking units is forecasted at approximately 31 million cubic feet in 2017. Fuel oil and natural gas are also used to fuel peaking units and/or to ignite the burners prior to burning coal when a coal-fired plant is restarted. Fuel oil requirements have historically been low and are forecasted to remain so. Requirements are expected to range between 7.5 and 8.5 million gallons per year over the next five years.
System Demand
The 2016 maximum hourly demand for each of the Utilities was:
OE—5,655 MW on August 11, 2016;
Penn—994 MW on September 7, 2016;
CEI—4,193 MW on September 7, 2016;
TE—2,171 MW on September 7, 2016;
JCP&L—5,955 MW on August 12, 2016;
ME—2,904 MW on July 25, 2016;
PN—2,890 MW on December 15, 2016;
MP—2,053 MW on August 11, 2016;
PE—3,049 MW on February 12, 2016; and
WP—3,947 MW on July 25, 2016.
Supply Plan

Regulated Commodity Sourcing

Certain of the Utilities have default service obligations to provide power to non-shopping customers who have elected to continue to receive service under regulated retail tariffs. The volume of these sales can vary depending on the level of shopping that occurs. Supply plans vary by state and by service territory. JCP&L’s default service or BGS supply is secured through a statewide competitive procurement process approved by the NJBPU. Default service for the Ohio Companies, Pennsylvania Companies and PE's Maryland jurisdiction are provided through a competitive procurement process approved by the PUCO (under the ESP), PPUC (under the DSP) and MDPSC (under the SOS), respectively. If any supplier fails to deliver power to any one of those Utilities’ service areas, the Utility serving that area may need to procure the required power in the market in their role as a LSE. West Virginia electric generation continues to be regulated by the WVPSC.

Unregulated Commodity Sourcing

The CES segment, through FES and AE Supply, primarily provides energy and energy related services, including the generation and sale of electricity and energy planning and procurement through retail and wholesale competitive supply arrangements. FES and AE Supply provide the power requirements of their competitive load-serving obligations through a combination of subsidiary-owned generation, non-affiliated contracts and spot market transactions.

FES and AE Supply have retail and wholesale competitive load-serving obligations in Ohio, Pennsylvania, Illinois, Maryland, Michigan and New Jersey, serving both affiliated and non-affiliated companies. FES and AE Supply provide energy products and services to customers under various POLR, shopping, competitive-bid and non-affiliated contractual obligations. Geographically, most of FES’ and AE Supply's obligations are in the PJM market area where all of their respective generation facilities are located.

23




Regional Reliability

All of FirstEnergy's facilities are located within the PJM Region and operate under the reliability oversight of a regional entity known as RFC. This regional entity operates under the oversight of NERC in accordance with a delegation agreement approved by FERC.
Competition

Within FirstEnergy’s Regulated Distribution segment, generally there is no competition for electric distribution service in the Utilities’ respective service territories in Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York. Additionally, there has traditionally been no competition for transmission service in PJM. However, pursuant to FERC’s Order No. 1000 and subject to state and local siting and permitting approvals, non-incumbent developers now can compete for certain PJM transmission projects in the service territories of FirstEnergy’s Regulated Transmission segment. This could result in additional competition to build transmission facilities in the Regulated Transmission segment’s service territories while also allowing the Regulated Transmission segment the opportunity to seek to build facilities in non-incumbent service territories.

FirstEnergy's CES segment participates in deregulated energy markets in Ohio, Pennsylvania, Maryland, Michigan, New Jersey and Illinois, through FES and AE Supply. In these markets, the CES segment competes: (1) to provide retail generation service directly to end users; (2) to provide wholesale generation service to utilities, municipalities and co-operatives, which, in turn, resell to end users; and (3) in the wholesale market.
Seasonality

The sale of electric power is generally a seasonal business and weather patterns can have a material impact on FirstEnergy’s operating results. Demand for electricity in our service territories historically peaks during the summer and winter months, with market prices also generally peaking at those times. Accordingly, FirstEnergy’s annual results of operations and liquidity position may depend disproportionately on its operating performance during the summer and winter. Mild weather conditions may result in lower power sales and consequently lower earnings.
Research and Development

The Utilities, FES, FG, FENOC and ATSI participate in the funding of EPRI, which was formed for the purpose of expanding electric R&D under the voluntary participation of the nation’s electric utility industry — public, private and cooperative. Its goal is to mutually benefit utilities and their customers by promoting the development of new and improved technologies to help the utility industry meet present and future electric energy needs in environmentally and economically acceptable ways. EPRI conducts research on all aspects of electric power production and use, including fuels, generation, and delivery, efficient management of energy use, environmental effects and energy analysis. The majority of EPRI’s R&D programs and projects are directed toward business solutions and their applications to problems facing the electric utility industry.

FirstEnergy participates in other initiatives with industry R&D consortiums and universities to address technology needs for its various business units. Participation in these consortiums helps the company address research needs in areas such as plant operations and maintenance, major component reliability, environmental controls, advanced energy technologies, and transmission and distribution system infrastructure to improve performance, and develop new technologies for advanced energy and grid applications.

24




Executive Officers as of February 21, 2017
Name
 
Age
 
Positions Held During Past Five Years
 
Dates
G. D. Benz
 
57
 
Senior Vice President, Strategy (B)
 
2015-present
 
 
 
 
Vice President, Supply Chain (B)
 
2012-2015
 
 
 
 
 
 
 
L. M. Cavalier
 
65
 
Chief Human Resource Officer (B)
 
2015-present
 
 
 
 
Senior Vice President, Human Resources (B)
 
*-2015
 
 
 
 
 
 
 
D. M. Chack
 
66
 
Senior Vice President, Marketing and Branding (B)
 
2015-present
 
 
 
 
President, Ohio Operations (B)
 
*-2015
 
 
 
 
Vice President (C)
 
*-2015
 
 
 
 
 
 
 
M. J. Dowling
 
52
 
Senior Vice President, External Affairs (B)
 
*-present
 
 
 
 
 
 
 
B. L. Gaines
 
63
 
Senior Vice President, Corporate Services and Chief Information Officer (B)
 
2012-present
 
 
 
 
Vice President, Corporate Services and Chief Information Officer (B)
 
*-2012
 
 
 
 
 
 
 
C. E. Jones
 
61
 
President and Chief Executive Officer (A)(B)
 
2015-present
 
 
 
 
Chief Executive Officer (F)
 
2015-2017
 
 
 
 
President (C)(D)(H)(I)(L)
 
*-2015
 
 
 
 
Executive Vice President & President, FirstEnergy Utilities (A)(B)
 
2014
 
 
 
 
Senior Vice President & President, FirstEnergy Utilities (B)
 
*-2013
 
 
 
 
 
 
 
J. H. Lash
 
66
 
Executive Vice President & President, FE Generation (A)(B)
 
2015-present
 
 
 
 
President (G)
 
*-present
 
 
 
 
President (J)
 
*-2016
 
 
 
 
President, FE Generation (B)
 
*-2015
 
 
 
 
Chief Nuclear Officer (F)
 
*-2012
 
 
 
 
 
 
 
C. D. Lasky
 
54
 
Senior Vice President, Human Resources (B)
 
2015-present
 
 
 
 
Vice President, Fossil Operations (J)
 
2014-2015
 
 
 
 
Vice President (G)
 
*-2015
 
 
 
 
Vice President, Fossil Operations & Engineering (J)
 
2014
 
 
 
 
Vice President, Fossil Fleet Operations (J)
 
*-2013
 
 
 
 
 
 
 
J. F. Pearson
 
62
 
Executive Vice President and Chief Financial Officer (N)
 
2016-present
 
 
 
 
Executive Vice President and Chief Financial Officer (A)(B)(C)(D)(H)(I)(L)
 
2015-present
 
 
 
 
Executive Vice President and Chief Financial Officer (F)(G)
 
2015-2017
 
 
 
 
Executive Vice President and Chief Financial Officer (E)(J)
 
2015-2016
 
 
 
 
Senior Vice President and Chief Financial Officer (A)(B)(C)(D)(E)(F)(G)(H)(I)(J)(L)
 
2013-2015
 
 
 
 
Senior Vice President and Treasurer (A)(B)(C)(D)(E)(F)(G)(H)(I)(J)(L)
 
2012
 
 
 
 
Vice President and Treasurer (A)(B)(C)(D)(E)(F)(G)(H)(I)(J)(L)
 
*-2012
 
 
 
 
 
 
 
R. P. Reffner
 
66
 
Vice President and General Counsel (N)
 
2016-present
 
 
 
 
Vice President and General Counsel (B)(C)(D)(H)(I)(L)
 
2014-present
 
 
 
 
Vice President and General Counsel (F)(G)
 
2014-2017
 
 
 
 
Vice President and General Counsel (E)(J)
 
2014-2016
 
 
 
 
Vice President, Legal (B)
 
*-2013
 
 
 
 
 
 
 
D. R. Schneider
 
55
 
President (E)
 
*-present
 
 
 
 
Chairman of the Board (E)
 
2016-present
 
 
 
 
 
 
 
S. E. Strah
 
53
 
President (N)
 
2016-present
 
 
 
 
Senior Vice President & President, FirstEnergy Utilities (B)
 
2015-present
 
 
 
 
President (C)(D)(H)(I)(L)
 
2015-present
 
 
 
 
Vice President, Distribution Support (B)
 
*-2015
 
 
 
 
 
 
 
K. J. Taylor
 
43
 
Vice President and Controller (N)
 
2016-present
 
 
 
 
Vice President, Controller and Chief Accounting Officer (A)(B)
 
2013-present
 
 
 
 
Vice President and Controller (C)(D)(H)(I)(L)
 
2013-present
 
 
 
 
Vice President and Controller (F)(G)
 
2013-2017
 
 
 
 
Vice President and Controller (E)(J)
 
2013-2016
 
 
 
 
Vice President and Assistant Controller (A)(B)(C)(D)(E)(F)(G)(H)(I)(J)(L)
 
2012-2013
 
 
 
 
Assistant Controller (A)(B)(C)(D)(H)(I)(L)
 
*-2012
 
 
 
 
Assistant Controller (E)(F)(G)(J)
 
2012
 
 
 
 
 
 
 
L. L. Vespoli
 
57
 
Executive Vice President, Corporate Strategy, Regulatory Affairs & Chief Legal Officer (A)(B)(C)(D)(H)(I)(L)(N)
 
2016-present
 
 
 
 
Executive Vice President, Corporate Strategy, Regulatory Affairs & Chief Legal Officer (F)(G)
 
2016-2017
 
 
 
 
Executive Vice President, Corporate Strategy, Regulatory Affairs & Chief Legal Officer (E)(J)
 
2016
 
 
 
 
Executive Vice President, Markets & Chief Legal Officer (A)(B)(C)(D)(E)(F)(G)(H)(I)(J)(L)
 
2014-2016
 
 
 
 
Executive Vice President and General Counsel (A)(B)(C)(D)(E)(F)(G)(H)(I)(J)(L)
 
*-2013
 
 
 
 
 
 
 
* Indicates position held at least since January 1, 2012
(E) Denotes executive officer of FES
(J) Denotes executive officer of FG
(A) Denotes executive officer of FE
(F) Denotes executive officer of FENOC
(K) Denotes executive officer of OE
(B) Denotes executive officer of FESC
(G) Denotes executive officer of AGC
(L) Denotes executive officer of ATSI
(C) Denotes executive officer of OE, CEI and TE
(H) Denotes executive officer of MP, PE and WP
(M) Denotes executive officer of CEI
(D) Denotes executive officer of ME, PN and Penn
(I) Denotes executive officer of TrAIL and FET
(N) Denotes executive officer of MAIT



25




Employees

As of December 31, 2016, FirstEnergy’s subsidiaries had 15,707 employees located in the United States as follows:
 
Total
Employees
 
Bargaining
Unit
Employees
FESC
4,429

 
749

OE
1,090

 
706

CEI
920

 
610

TE
327

 
235

Penn
183

 
129

JCP&L
1,347

 
1,041

ME
653

 
489

PN
728

 
475

FES
77

 

FG
1,654

 
1,031

FENOC
2,487

 
1,068

MP
622

 
401

PE
482

 
299

WP
708

 
452

Total
15,707

 
7,685


As of December 31, 2016, the IBEW, the UWUA and the OPEIU unions collectively represented approximately 6,585 of FirstEnergy's employees. There are 22 CBAs between FirstEnergy's subsidiaries and its unions, which have three, four or five year terms. In 2016, certain of FirstEnergy's subsidiaries reached new agreements on CBAs with seven different IBEW locals, covering approximately 1,417 employees.

On January 25, 2016, IBEW Local 459, which represents approximately 371 employees in PN, ratified a new agreement that will expire May 14, 2021. On March 17, 2016, OPEIU Local 19, which represents approximately 104 employees at TE, the Davis-Besse nuclear plant and the Bay Shore generating station ratified a contract that will expire on February 29, 2020. On March 21, 2016, UWUA Local 270 PT, which represents approximately 67 employees at the Perry nuclear plant, ratified a new agreement that will expire on November 18, 2018. On April 18, 2016, IBEW Local 2357, which represents approximately 218 employees at MP, ratified a new agreement that will expire February 28, 2021. On September 9, 2016, IBEW Local 1413, which represents approximately 138 security personnel at the Davis-Besse nuclear plant, ratified a contract that will expire September 9, 2020. On September 29, 2016, IBEW Local 1194, which represents approximately 255 employees at OE, ratified a new agreement that will expire September 3, 2019. On November 3, 2016, IBEW Local 29, which represents approximately 379 employees at the Beaver Valley nuclear plant ratified a contract that will expire September 30, 2021. On November 3, 2016, IBEW Local 29 MP, which represents approximately 18 Maintenance Planners at the Beaver Valley nuclear plant ratified a new contract that will expire February 28, 2022. On November 20, 2016, IBEW Local 50, which represents approximately 38 employees at MP, ratified a new contract that will expire February 28, 2022.

The agreement with IBEW Local 272, which represents approximately 220 employees at the Bruce Mansfield plant, expired on February 15, 2014. On October 27, 2015, following nearly two years of bargaining, FirstEnergy declared impasse and implemented terms and conditions of employment from its last comprehensive offer to settle. FirstEnergy continues to engage in discussions with IBEW Local 272, and work continuation plans are in place in the event of a work stoppage.
FirstEnergy Website and Other Social Media Sites and Applications

Each of the registrants’ Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and amendments to those reports filed with or furnished to the SEC pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 are also made available free of charge on or through the "Investors" page of FirstEnergy’s Internet website at www.firstenergycorp.com. The public may read and copy any reports or other information that the registrants file with the SEC at the SEC's public reference room at 100 F Street, N.E., Washington, D.C. 20549. The public may obtain information on the operation of the SEC's public reference room by calling the SEC at 1-800-SEC-0330. These documents are also available to the public from commercial document retrieval services and the website maintained by the SEC at www.sec.gov.

These SEC filings are posted on FirstEnergy's website as soon as reasonably practicable after they are electronically filed with the SEC. Additionally, the registrants routinely post additional important information including press releases, investor presentations and notices of upcoming events, under the "Investors" section of FirstEnergy’s Internet website and recognize FirstEnergy’s Internet website as a channel of distribution to reach public investors and as a means of disclosing material non-public information for

26




complying with disclosure obligations under Regulation FD. Investors may be notified of postings to the website by signing up for email alerts and RSS feeds on the "Investors" page of FirstEnergy's Internet website FirstEnergy also uses Twitter® and Facebook® as additional channels of distribution to reach public investors and as a supplemental means of disclosing material non-public information for complying with its disclosure obligations under Regulation FD. Information contained on FirstEnergy’s Internet website, posted on FirstEnergy's Facebook® page or disseminated through Twitter®, and any corresponding applications, shall not be deemed incorporated into, or to be part of, this report.

27




ITEM 1A.
RISK FACTORS

We operate in a business environment that involves significant risks, many of which are beyond our control. Management of each Registrant regularly evaluates the most significant risks of the Registrants' businesses and reviews those risks with the FE Board of Directors or appropriate Committees of such Board and the FES Board of Directors, respectively. The following risk factors and all other information contained in this report should be considered carefully when evaluating FirstEnergy and FES. These risk factors could affect our financial results and cause such results to differ materially from those expressed in any forward-looking statements made by or on behalf of us. Below, we have identified risks we currently consider material. Additional information on risk factors is included in “Item 1. Business” and “Item 7. Management’s Discussion and Analysis of Registrant and Subsidiaries” and in other sections of this Form 10-K that include forward-looking and other statements involving risks and uncertainties that could impact our business and financial results.
Risks Related to the Transition to a Fully Regulated Utility

We Have Taken a Series of Actions to Focus Our Growth on Our Regulated Operations, Particularly Within the Regulated Transmission Segment. Whether This Investment Strategy Will Deliver the Desired Result is Subject to Certain Risks Which Could Adversely Affect Our Results of Operations and Financial Condition in the Future
We focus on capitalizing on investment opportunities available to our regulated operations - particularly within our Regulated Transmission segment - as we focus on delivering enhanced customer service and reliability. The success of these efforts will depend, in part, on successful recovery of our transmission investments. Factors that may affect rate recovery of our transmission investments include: (1) FERC’s timely approval of rates to recover such investments; (2) whether the investments are included in PJM's RTEP; (3) FERC's evolving policies with respect to incentive rates for transmission assets; (4) FERC's evolving policies with respect to the calculation of the base ROE component of transmission rates, as articulated in FERC's Opinion No. 531 and related orders; (5) consideration of the objections of those who oppose such investments and their recovery; and (6) timely development, construction, and operation of the new facilities.
The success of these efforts will also depend, in part, on any future distribution rate cases and transmission rate filings in the states where our Utilities operate. Any denial of, or delay in, the approval of any future distribution or transmission rate requests could restrict us from fully recovering our cost of service, may impose risks on the Regulated Transmission and Regulated Distribution operations, and could have a material adverse effect on our regulatory strategy and results of operations.
Our efforts also could be impacted by our ability to finance the proposed expansion projects while maintaining adequate liquidity. There can be no assurance that our efforts to reflect a more regulated business profile will deliver the desired result which could adversely affect our future results of operations and financial condition.
Consistent With Our Strategy to Be A Fully Regulated Utility, We Intend to Exit the Competitive Generation Business; Failure to Successfully Implement Strategic Alternatives for the CES Segment May Further Negatively and Materially Impact the Future Results of Operations and Financial Condition of FirstEnergy and FES, and Regardless of the Viability or Success of the Sale of Certain AE Supply Generation Assets and Other Strategic Alternatives for the CES Segment, Certain Events May Significantly Increase Cash Flow and Liquidity Risks, and May Cause FES and, Possibly, FENOC to Take Other Actions, Including Debt Restructuring or Seeking Protection under the U.S. Bankruptcy Laws
Depressed prices in the wholesale energy and capacity markets insufficient results from recent capacity auctions and anemic demand forecasts that have lowered the value of the business continue to challenge the CES segment, including FES. Consequently, as previously disclosed in FirstEnergy‘s and FES’ prior SEC filings and as further discussed in "FirstEnergy’s Management’s Discussion and Analysis of Financial Condition and Results of Operations" and "FES’ Narrative Analysis of Results of Operations" in this Annual Report on Form 10-K for the year ended December 31, 2016, FirstEnergy is engaged in a strategic review of its competitive operations focused on the sale of gas and hydroelectric units at AE Supply, as well as exploring all alternatives for the remaining generation assets at FES and AE Supply.
These alternatives include, but are not limited to, (i) the sale or deactivation of additional generating units and other assets within CES, including FES, (ii) legislative or regulatory solutions for generation assets that recognize their environmental or energy security benefits, (iii) restructuring FES debt with its creditors, and/or (iv) seeking protection under U.S. bankruptcy laws for FES, and possibly FENOC. Management anticipates that the viability of these alternatives will be determined in the near term with a target to implement these strategic options by mid-2018. Each of FE and FES (together with FENOC) have engaged separate advisors to assist them as they explore these strategic alternatives and other options if these alternatives cannot be implemented. No assurance can be given, however, that these strategic alternatives are viable or will be achieved or sufficiently realized or the time frame in which they may be achieved.
Regardless of the viability or success of the sales of CES generation assets and other strategic alternatives for the CES business discussed above, CES, including FES, faces significant cash flow and liquidity risks including, but not limited to the following:
requests to post additional collateral or accelerate payments

28




adverse outcomes in previously disclosed disputes regarding long-term coal and coal transportation contracts; and
the inability to refinance debt maturities at FES subsidiaries of $130 million, $515 million, and $323 million in 2017, 2018 and 2019, respectively, and in the event AE Supply’s pending sale of assets is not consummated, $155 million in 2019 at AE Supply, in each case, at attractive rates or at all.

Any one of these events, even if the alternatives outlined above or any other viable business alternatives are implemented, could require FES to (i) restructure debt and other financial obligations, or (ii) borrow additional funds from FE under its secured credit facility. In addition, FES, and possibly FENOC, may determine to seek protection under U.S. bankruptcy laws regardless of the viability of one or more strategic alternatives.

A near-term deactivation of one or more of the nuclear generating units could have a material adverse effect on FirstEnergy's and/or FES' business, financial condition and results of operations as the NDTs may be insufficient to address all radiological decommissioning costs thus requiring financial guarantees or additional contributions, which could be significant. Additionally, the funds from the NDTs may be restricted from being used to address other significant costs resulting from a near-term deactivation, such as the costs associated with storing spent nuclear fuel onsite.
Adverse judgments or outcomes in ongoing disputes could result in one or more events of default under various agreements related to the indebtedness of FES. Additionally, although the recent amendment to FE’s credit facility revised the debt to total capitalization ratio covenant to exclude non-cash charges up to $5.5 billion related to asset impairments attributable to the power generation assets owned by FES, AE Supply and each of their subsidiaries, charges beyond that amount could result in an event of default related to the indebtedness of FE, which may have a further material adverse effect on the results of operations and financial condition of FE.
There is Substantial Uncertainty as to FES’ Ability to Continue as a Going Concern and Substantial Risk That It May be Necessary for FES, and possibly FENOC, to Seek Protection Under U.S. Bankruptcy Laws, Which Would Have a Material Adverse Impact on FirstEnergy’s and FES’ Business, Financial Condition, Results of Operations and Cash Flows
Based upon continued depressed prices in the wholesale energy and capacity markets, weak demand for electricity and anemic demand forecasts, FES’ cash flow from operations may be insufficient to repay its indebtedness or trade payables in the long-term. Although management is exploring capital and other cost reductions, asset sales, and other options to improve cash flow as well as continuing with legislative efforts to explore a regulatory type solution, the obligations and their impact to liquidity raise substantial doubt about FES’ ability to meet its obligations as they come due over the next twelve months and, as such, its ability to continue as a going concern. However, the accompanying financial statements do not include any adjustments related to the recoverability and classification of recorded assets or the amounts and classification of liabilities that might result from the uncertainty associated with the ability to meet obligations as they come due.
Although each of FirstEnergy and FES (together with FENOC) have engaged separate financial and legal advisors to assist with the evaluation of various strategic alternatives and to address the liquidity needs and the current capitalization of FES, there can be no assurance FES will be successful in pursuing such alternatives and due to FES’ financial condition, there is a substantial risk that it may be necessary for FES, and possibly FENOC, to seek protection under U.S. bankruptcy laws. An FES bankruptcy proceeding would have a material adverse effect on FES’ business, financial condition, results of operations and cash flows and could have a material adverse effect on FirstEnergy’s business, financial condition, results of operations and cash flows. Management of FirstEnergy and FES would be required to spend a significant amount of time and effort dealing with the bankruptcy proceeding instead of focusing on their business operations. In addition, it is expected that prior to the commencement of any such proceeding, FES will be fully drawn under its new $500 million secured credit facility from FE, which FE would likely fund by borrowing under its bank facility. A bankruptcy proceeding at FES also may make it more difficult to retain, attract or replace management and other key personnel. Moreover, creditors of FES may attempt to assert claims against FirstEnergy that may require significant effort and money to defend. There can be no assurance that FirstEnergy would be successful in defending against any such claims. The costs and the uncertainty of potential liabilities during the pendency of an FES bankruptcy proceeding could have a material and adverse impact on FirstEnergy’s and FES’ business, financial condition, results of operations and cash flows.
FirstEnergy and FES May Not Be Successful in Pursuing and/or Consummating Sales of Generating Assets, Which Could Result in Further Substantial Write-Downs and Impairments of Assets and Have a Material Adverse Effect on the Results of Operations and Financial Condition of FirstEnergy and FES
Since beginning their strategic review of the CES segment, FirstEnergy and FES have been pursuing the sale of certain generating and other assets. Because of the current financial condition of FES, those sales may be more difficult to execute at market values or at all.
In this regard, on January 18, 2017, AE Supply and AGC entered into an asset purchase agreement for the sale of its Springdale, Chambersburg, Gans and Hunlock gas facilities and AE Supply’s share of AGC’s ownership interest in Bath County, with a combined capacity of 1,572 MWs. Under the terms of the agreement, the facilities would be purchased for an all cash purchase price of approximately $925 million. The transaction is expected to close in the third quarter of 2017, subject to satisfaction of various customary and other closing conditions, including regulatory approvals, the receipt of third party consents and the satisfaction and

29




discharge of AE Supply’s senior note indenture, under which there is approximately $305 million of indebtedness outstanding, that is expected to require a “make-whole” payment anticipated to be approximately $100 million based on current interest rates. Many of the conditions to closing are outside the control of AE Supply and AGC and there is no assurance that any such approvals will be obtained and/or any such conditions will be satisfied or that such sale will be consummated.
If this sale or others by AE Supply or FES are not achieved or realized, AE Supply and FES may take further substantial write-downs and impairments of assets, which could have a material adverse effect on the results of operations and financial condition of FirstEnergy and FES and put additional pressure on the success of other strategic alternatives for remaining generation assets at FES and AE Supply.
Certain FirstEnergy Companies May Not be Able to Meet Their Obligations to or on behalf of Other FirstEnergy Companies or Their Affiliates Which Could Have a Material Adverse Effect on the Results of Operations, Financial Condition or Liquidity of one or more FirstEnergy Entities, Including Additional Significant Exposure in the Event of an FES and, Possibly, FENOC Bankruptcy Proceeding

Certain of the FirstEnergy companies have obligations to other FirstEnergy companies pursuant to transactions involving energy, coal, other commodities, services and hedging transactions. If one FirstEnergy entity failed to perform under any of these arrangements, other FirstEnergy entities could incur losses. Their results of operations, financial position, or liquidity could be adversely affected, and could result in the nondefaulting FirstEnergy entity being unable to meet its obligations to unrelated third parties. Certain FirstEnergy companies also provide guarantees to third party creditors on behalf of other FirstEnergy affiliate companies under transactions of the type described above or under financing transactions. Any failure to perform under such guarantee by such FirstEnergy guarantor company or under the underlying transaction by the FirstEnergy company on whose behalf the guarantee was issued could have similar adverse impacts on one or both FirstEnergy companies or their affiliates.

FES provides a parental support agreement to NG of up to $400 million. The NRC typically relies on such parental support agreements to provide additional assurance that U.S. merchant nuclear plants, including NG’s nuclear units, have the necessary financial resources to maintain safe operations, particularly in the event of extraordinary circumstances. If FES is called upon by NG to perform under this arrangement, FES’ results of operations, financial position, and liquidity could be adversely affected, and could result in FES being unable to meet its obligations to unrelated third parties. If FE’s credit support to FES for this arrangement is established as described under “Nuclear Regulation” above, FE’s liquidity could also be adversely affected if such support is necessary to be utilized by FES.
In addition, there are significant commercial and other relationships among FE, FES and other FE subsidiaries, including, but not limited to, AE Supply and FENOC. These relationships include a shared services agreement, cash management, intercompany loans, tax sharing and energy-related purchases and sales, among others, which would be subject to review and possible challenge in the event of an FES bankruptcy proceeding. FirstEnergy is unable to estimate the outcome of such challenges or other claims arising out of an FES bankruptcy proceeding, any resulting material losses, obligations or other liabilities of FirstEnergy or their possible material adverse effect on the business, results of operations and financial condition of FirstEnergy, including, but not limited to, AE Supply. In the event FES seeks such protection under U.S. bankruptcy laws, FENOC may similarly seek protection under U.S. bankruptcy laws.
FES, FG, OE and TE are exposed to losses under their applicable sale and leaseback arrangements for generating facilities upon the occurrence of certain contingent events that could render those facilities worthless.
FES, FG, OE and TE have a maximum exposure to loss under those provisions of approximately $1.1 billion for FES, $199 million for OE and $154 million for TE. In addition, new and certain existing environmental requirements may force us to shut down such generating facilities or change their operating status, either temporarily or permanently, if we are unable to comply with such environmental requirements, or if we make a determination that the expenditures required to comply with such requirements are unreasonable.
In connection with the consummation of AE Supply’s pending sale of assets to Aspen, FE will provide two limited guaranties of certain obligations of AE Supply and AGC arising under the purchase agreement. The guaranties vary in amount and scope and expire in one and three years, respectively. Liabilities incurred under these guarantees could have an adverse impact on FE.
Risks Related to the CES Segment

Continued depressed prices in the wholesale energy and capacity markets may further negatively and materially impact the future results of operations and financial condition of FirstEnergy and FES and have resulted in FirstEnergy and FES conducting a strategic review of competitive operations, such as the sale or deactivation of additional generating units, which may have a further material adverse effect on the results of operations and financial condition of FirstEnergy and FES

Depressed prices in the wholesale energy and capacity markets continue to challenge the coal and nuclear baseload generating units within the CES business segment, including those of FES. The continued depression of these markets may further negatively and materially impact the future results of operations and financial condition of FirstEnergy and FES.


30




FE does not intend to infuse additional equity into CES and only expects to continue to support CES, including FES, as necessary to maintain safe operations and to preserve the fleet as it pursues strategic alternatives with respect to CES. However, CES has liquidity support, in the case of FES, through the secured credit facility entered into between FES and FE in December 2016 and, in the case of AE Supply, through the FirstEnergy unregulated companies’ money pool. No assurance can be given, however, that such expectations will not change or that the alternatives for CES, including those discussed in “Management’s Discussion and Analysis of Registrant and Subsidiaries - Executive Summary,” are viable or will be achieved or sufficiently realized. If options that retain the current fleet cannot be implemented or can only be implemented for a portion of the CES fleet, we may consider other options longer term, such as the sale or deactivation of additional generating units within CES, including FES, which may have a further material adverse effect on the results of operations and financial condition of FirstEnergy and FES.

FES Has a Significant Amount of Indebtedness, Which Could Adversely Affect FirstEnergy’s and FES’ Cash Flow and Liquidity and the Ability of FES and its subsidiaries to Fulfill their Obligations, Which Could Cause FES to Seek Protection under U.S. Bankruptcy Laws
FES and its subsidiaries have a significant amount of indebtedness, some of which is secured. Specifically, as of December 31, 2016, $3 billion of outstanding long-term debt, of which approximately $620 million is secured and approximately $2.4 billion is unsecured.
As a result of this debt, a substantial portion of cash flow from the operations of FES must be used to make payments on this debt, including the payment of principal and interest. Furthermore, since a material percentage of the FES assets are used to secure this debt, and much of those assets have been substantially written down, there is little or no collateral available for future secured debt or credit support, which reduces FirstEnergy’s and FES’ flexibility in dealing with future liquidity needs or financial difficulties. This high level of indebtedness and related collateral pledges could have other adverse consequences to FES creditors, including:
difficulty satisfying debt service and other obligations at FES and/or its individual subsidiaries;
the inability or unwillingness to refinance debt maturities at FES subsidiaries of $130 million, $515 million, and $323 million in 2017, 2018 and 2019, respectively;
additional postings of collateral or acceleration of payments;
increasing the vulnerability of the business of FirstEnergy and FES to adverse industry and economic conditions;
reducing the availability of FES cash flow to fund other corporate purposes, including the ability to pay dividends to FirstEnergy;
limiting flexibility of FirstEnergy and FES in planning for, or reacting to, changes in their business and the industry;
reducing the ability to enter into transactions with counterparties that may demand additional collateral or credit support from FE due to the creditworthiness;
increasing the likelihood of litigation, the costs of which may be material;
placing FirstEnergy and FES, at a competitive disadvantage to its competitors that are not as highly leveraged; and
limiting, along with the financial and other restrictive covenants relating to such indebtedness, among other things, FE’s and FES’ ability to borrow additional funds as needed for working capital, capital expenditures and general corporate purposes and to take advantage of business opportunities as they arise or pay cash dividends.

If market conditions in the wholesale energy and capacity markets continue to be depressed and the strategy discussed in "FirstEnergy’s Management’s Discussion and Analysis of Financial Condition and Results of Operations" and "FES’ Narrative Analysis of Results of Operations" in this Annual Report on Form 10-K for the year ended December 31, 2016 and the above risk factors are not viable, achieved or sufficiently realized, then the cash flows of FES may not be sufficient to fund debt service obligations, including the repayment at maturity all of the outstanding debt as it becomes due. In that event, FES may not be able to borrow money, sell assets, raise equity or otherwise raise funds on acceptable terms or at all to refinance its debt as it becomes due, which could have a material adverse effect on the results of operations, financial condition and liquidity of FirstEnergy and FES, result in one or more events of default being declared under various agreements related to the indebtedness of FES and cause FES to seek protection under U.S. bankruptcy laws. In the event FES seeks such protection, FENOC may similarly seek protection under U.S. bankruptcy laws.
Additionally, if any potential defaults at FES are not resolved through waivers or otherwise cured, lenders could accelerate the maturity of the applicable debt. These defaults would have a material adverse effect on FirstEnergy’s business, financial condition, results of operations, liquidity and the trading price of FirstEnergy securities.

Disruptions in Our Fuel Supplies and Changes in Our Fuel Transportation Needs Could Adversely Affect Our Relationships With Suppliers, Our Ability to Operate Our Generation Facilities or Lead to Business Disputes and Material Judgments Against Us, Any of Which May Adversely Impact Financial Results, and in the Case of Certain Fuel Transportation Contracts, Adverse Resolutions Could Cause FES to Seek Bankruptcy Protection and Result in One or More Events of Default Under Various Agreements Related to the Indebtedness of FES

We purchase fuel from a number of suppliers. The lack of availability of fuel at expected prices, or a disruption in the delivery of fuel which exceeds the duration of our on-site fuel inventories, including disruptions as a result of weather, increased transportation

31




costs or other difficulties, labor relations or environmental or other regulations affecting our fuel suppliers, could cause an adverse impact on our ability to operate our facilities, possibly resulting in lower sales and/or higher costs and thereby adversely affect our results of operations.

Operation of our coal-fired generation facilities is highly dependent on our ability to procure coal. We have long-term contracts in place for a majority of our coal supply and transportation needs, one of which runs through 2028 and certain of which relate to deactivated plants. We have asserted force majeure defenses for delivery shortfalls under certain of these agreements relating to our deactivated plants. Two such agreements which are currently in separate arbitration proceedings relate to the transportation of an aggregate of a minimum of 6.0 million tons of coal annually through 2025 to certain operating and deactivated coal-fired power plants owned by FG. In addition, in one coal supply agreement, FirstEnergy, through AE Supply, has also asserted termination rights effective in 2015 and is in litigation with the counterparty.

We can provide no assurance that negotiations with counterparties, or any litigation or arbitration, will be favorably resolved. An adverse resolution of any of these material matters could have a material adverse impact on our financial condition and results of operations, and in the case of the fuel transportation contracts discussed above, such adverse resolutions could require FES to (i) restructure debt and other financial obligations, (ii) borrow additional funds from FE under its secured credit facility, (iii) sell additional assets or deactivate additional plants and/or (iv) seek protection under U.S. bankruptcy laws, which in turn would result in one or more events of default under various agreements related to the indebtedness of FES. In the event FES seeks such protection, FENOC may similarly seek protection under U.S. bankruptcy laws.

In addition, we may from time to time enter into new contracts, or renegotiate certain of these contracts, but can provide no assurance that such contracts will be negotiated or renegotiated, as the case may be, on satisfactory terms, or at all. In addition, if prices for physical delivery are unfavorable, our financial condition, results of operations and cash flows could be materially adversely affected.

Continued Pressure on Commodity Prices Including, but Not Limited to, Fuel for our Generation Facilities, Could Adversely Affect Our Profit Margins

During the period of transition to a fully regulated company, we continue to purchase and sell electricity in the competitive retail and wholesale markets. Increases in the costs of fuel for our generation facilities (particularly coal, uranium and natural gas) may affect our profit margins. Competition and changes in the short or long-term market price of electricity, which are affected by changes in other commodity costs and other factors including, but not limited to, weather, energy efficiency mandates, DR initiatives and deactivations and retirements at power production facilities, may impact our results of operations and financial position by decreasing sales margins or increasing the amount we pay to purchase power to satisfy our sales obligations in the states in which we do business. We are exposed to risk from the volatility of the market price of natural gas. Our ability to sell at a profit is highly dependent on the price of natural gas. With low natural gas prices, other market participants that utilize natural gas-fired generation will be able to offer electricity at increasingly competitive prices, so the margins we realize from sales will be lower and, on occasion, we may curtail or cease operation of marginal plants. The availability of natural gas and issues related to its accessibility may have a long-term material impact on the price of natural gas. In addition, deterioration or weakness in the global economy has led to lower international demand for coal, oil and natural gas, which has lowered fossil fuel prices and may continue to put downward pressure on electricity prices.

We Are Exposed to Price Risks Associated With Marketing and Selling Products in the Power Markets That We Do Not Always Completely Hedge Against

We purchase and sell power at the wholesale level under market-based rate tariffs authorized by FERC, and also enter into agreements to sell available energy and capacity from our generation assets. If we are unable to deliver firm capacity and energy under these agreements, we may be required to pay damages, including significant penalties under PJM's Capacity Performance market reform. These damages would generally be based on the difference between the market price to acquire replacement capacity or energy and the contract price of the undelivered capacity or energy. Depending on price volatility in the wholesale energy markets, such damages and penalties could be significant. A single outage could result in penalties that exceed capacity revenues for a given unit in a given year. Extreme weather conditions, unplanned power plant outages, transmission disruptions, and other factors could affect our ability to meet our obligations, or cause increases in the market price of replacement capacity and energy.

We attempt to mitigate risks associated with satisfying our contractual power sales arrangements by reserving generation capacity to deliver electricity to satisfy our net firm sales contracts and, when necessary, by purchasing firm transmission service. We also routinely enter into contracts, such as fuel and power purchase and sale commitments, to hedge exposure to fuel requirements and other energy-related commodities. We may not, however, hedge the entire exposure of our operations from commodity price volatility. To the extent we do not hedge against commodity price volatility, our results of operations and financial position could be negatively affected. In addition, these risk management related contracts could require the posting of additional collateral in the event market prices or market conditions change or our credit ratings are further downgraded.

Nuclear Generation Involves Risks that Include Uncertainties Relating to Health and Safety, the Environment, Additional Capital Costs, the Adequacy of Insurance Coverage, NRC Actions and Nuclear Plant Decommissioning, Which Could Have a Material Adverse Effect on Our Business, Results of Operations and Financial Condition

32





We are subject to the risks of nuclear generation, including but not limited to the following:
the potential harmful effects on the environment, human health and safety, including loss of life, resulting from unplanned radiological releases associated with the operation of our nuclear facilities and the storage, handling and disposal of radioactive materials;
limitations on the amounts and types of insurance commercially available to cover losses that might arise in connection with our nuclear operations, including any incidents of unplanned radiological release, or those of others in the United States;
uncertainties with respect to contingencies and assessments if insurance coverage is inadequate; and
uncertainties with respect to the technological and financial aspects of spent fuel storage and decommissioning nuclear plants, including but not limited to, waste disposal at the end of their licensed operation and increases in minimum funding requirements or costs of decommissioning.

The NRC has broad authority under federal law to impose licensing, security and safety-related requirements for the operation of nuclear generation facilities. In the event of non-compliance, the NRC has the authority to impose fines and/or shut down a unit, depending upon its assessment of the severity of the situation, until compliance is achieved. Revised safety requirements promulgated by the NRC could necessitate substantial capital expenditures at nuclear plants, including ours. Also, a serious nuclear incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or relicensing of any domestic nuclear unit. See "Potential NRC Regulation in Response to the Incident at Japan's Fukushima Daiichi Nuclear Plant Could Adversely Affect Our Business and Financial Condition" below and "Note 16, Commitments, Guarantees and Contingencies - Environmental Matters" of the Combined Notes to the Consolidated Financial Statements. Any one of these risks relating to our nuclear generation could have a material adverse effect on our business, results of operations and financial condition.
There Are Uncertainties Relating to Our Participation in RTOs Which Could Result In Significant Additional Fees and Increased Costs to Participate in an RTO, Limit the Recovery of Costs from Retail Customers and Have an Adverse Effect on our Results of Operations and Cash Flows and Financial Condition
RTO rules could affect our ability to sell energy and capacity produced by our generating facilities to users in certain markets. The rules governing the various regional power markets may change from time to time, which could affect our costs or revenues. In some cases these changes are contrary to our interests and adverse to our financial returns. The prices in day-ahead and real-time energy markets and RTO capacity markets have been volatile and RTO rules may contribute to this volatility.
All of our generating assets currently participate in PJM, which conducts RPM auctions for capacity on an annual planning year basis. The prices our generating companies can charge for their capacity are determined by the results of the PJM auctions, which are impacted by the supply and demand of capacity resources and load within PJM and also may be impacted by transmission system constraints and PJM rules relating to bidding for DR, energy efficiency resources, and imports, among others. Auction prices could fluctuate substantially over relatively short periods of time. To the extent PJM's Capacity Performance market reforms do not work as intended, energy and capacity market prices may remain volatile and low. We cannot predict the outcome of future auctions, but if the auction prices are sustained at low levels, our results of operations, financial condition and cash flows could be adversely impacted.
We incur fees and costs to participate in RTOs. Administrative costs imposed by RTOs, including the cost of administering energy markets, may increase. To the degree we incur significant additional fees and increased costs to participate in an RTO, and are limited with respect to recovery of such costs from retail customers, our results of operations and cash flows could be significantly impacted.
We may be allocated a portion of the cost of transmission facilities built by others due to changes in RTO transmission rate design. We may be required to expand our transmission system according to decisions made by an RTO rather than our own internal planning processes. Various proposals and proceedings before FERC may cause transmission rates to change from time to time. In addition, RTOs have been developing rules associated with the allocation and methodology of assigning costs associated with improved transmission reliability, reduced transmission congestion and firm transmission rights that may have a financial impact on us.
As a member of an RTO, we are subject to certain additional risks, including those associated with the allocation among members of losses caused by unreimbursed defaults of other participants in that RTO’s market and those associated with complaint cases filed against the RTO that may seek refunds of revenues previously earned by its members.
Risks Related to Business Operations Generally

We Are Subject to Risks Arising from the Operation of Our Power Plants and Transmission and Distribution Equipment Which Could Reduce Revenues, Increase Expenses and Have a Material Adverse Effect on our Business, Financial Condition and Results of Operations

33




Operation of generation, transmission and distribution facilities involves risk, including the risk of potential breakdown or failure of equipment or processes due to aging infrastructure, fuel supply or transportation disruptions, accidents, labor disputes or work stoppages by employees, human error in operations or maintenance, acts of terrorism or sabotage, construction delays or cost overruns, shortages of or delays in obtaining equipment, material and labor, operational restrictions resulting from environmental requirements and governmental interventions, and performance below expected levels. In addition, weather-related incidents and other natural disasters can disrupt generation, transmission and distribution delivery systems. Because our transmission facilities are interconnected with those of third parties, the operation of our facilities could be adversely affected by unexpected or uncontrollable events occurring on the systems of such third parties.
Operation of our power plants below expected capacity could result in lost revenues and increased expenses, including higher operation and maintenance costs, purchased power costs and capital requirements. Unplanned outages of generating units and extensions of scheduled outages due to mechanical failures or other problems occur from time to time and are an inherent risk of our business. Unplanned outages typically increase our operation and maintenance expenses or may require us to incur significant costs as a result of operating our higher cost units or obtaining replacement power from third parties in the open market to satisfy our sales obligations. Moreover, if we were unable to perform under contractual obligations, including, but not limited to, our coal and coal transportation contracts, penalties or liability for damages could result, which could have a material adverse effect on our business, financial condition and results of operations.
Failure to Provide Safe and Reliable Service and Equipment Could Result in Serious Injury or Loss of Life That May Harm Our Business Reputation and Adversely Affect our Operating Results
We are obligated to provide safe and reliable service and equipment in our franchised service territories. Meeting this commitment requires the expenditure of significant capital resources. However, our employees, contractors and the general public may be exposed to dangerous environments, due to the nature of our operations. Failure to provide safe and reliable service and equipment due to a number of factors, including, equipment failure, accidents and weather, could result in serious injury or loss of life that may harm our business reputation and adversely affect our operating results through reduced revenues and increased capital and operating costs and the imposition of penalties/fines or other adverse regulatory outcomes.
The Use of Non-Derivative and Derivative Contracts by Us to Mitigate Risks Could Result in Financial Losses That May Negatively Impact Our Financial Results
We use a variety of non-derivative and derivative instruments, such as swaps, options, futures and forwards, to manage our commodity and financial market risks. In the absence of actively quoted market prices and pricing information from external sources, the valuation of some of these derivative instruments involves management’s judgment or use of estimates. As a result, changes in the underlying assumptions or use of alternative valuation methods could affect the reported fair value of some of these contracts. Also, we could recognize financial losses as a result of volatility in the market value of these contracts if a counterparty fails to perform or if there is limited liquidity of these contracts in the market.
Financial Derivatives Reforms Could Increase Our Liquidity Needs and Collateral Costs and Impose Additional Regulatory Burdens
The Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank) was enacted into law in July 2010 with the primary objective of increasing oversight of the United States financial system, including the regulation of most financial transactions, swaps and derivatives. Dodd-Frank requires CFTC and SEC rulemaking to implement such provisions. Although the CFTC and the SEC have completed certain of their rulemaking, other rulemaking remains.
We rely on the OTC derivative markets as part of our program to hedge the price risk associated with our power portfolio. As a qualified end-user, we are required to comply with regulatory obligations under Dodd-Frank, which includes record-keeping, reporting requirements and the clearing of some transactions that we would otherwise enter into over-the-counter and the posting of margin. Also, the total burden that the rules could impose on all market participants could cause liquidity in the bilateral OTC swap market to decrease. These rules could impede our ability to meet our hedge targets in a cost-effective manner. FirstEnergy cannot predict the future impact Dodd-Frank rulemaking will have on its results of operations, cash flows or financial position.
Our Risk Management Policies Relating to Energy and Fuel Prices, and Counterparty Credit, Are by Their Very Nature Subject to Uncertainties, and We Could Suffer Economic Losses Resulting in an Adverse Effect on Results of Operations Despite Our Efforts to Manage and Mitigate Our Risks
We attempt to mitigate the market risk inherent in our energy, fuel and debt positions. Procedures have been implemented to enhance and monitor compliance with our risk management policies, including validation of transaction and market prices, verification of risk and transaction limits, sensitivity analysis and daily portfolio reporting of various risk measurement metrics. Nonetheless, we cannot economically hedge all of our exposure in these areas and our risk management program may not operate as planned. For example, actual electricity and fuel prices may be significantly different or more volatile than the historical trends and assumptions reflected in our analyses. Also, our power plants might not produce the expected amount of power during a given day or time period due to weather conditions, technical problems or other unanticipated events, which could require us to make energy purchases at higher prices than the prices under our energy supply contracts, and also to pay significant penalties under PJM's Capacity

34




Performance market reform. In addition, the amount of fuel required for our power plants during a given day or time period could be more than expected, which could require us to buy additional fuel at prices less favorable than the prices under our fuel contracts. As a result, actual events may lead to greater losses or costs than our risk management positions were intended to hedge.
Our risk management activities, including our power sales agreements with counterparties, rely on projections that depend heavily on judgments and assumptions by management of factors such as the creditworthiness of counterparties, future market prices and demand for power and other energy-related commodities. These factors become more difficult to predict and the calculations become less reliable the further into the future these estimates are made. Even when our policies and procedures are followed and decisions are made based on these estimates, results of operations may be adversely affected if the judgments and assumptions underlying those calculations prove to be inaccurate.
The Outcome of Litigation, Arbitration, Mediation, and Similar Proceedings, Involving Our Business, or That of One or More of Our Operating Subsidiaries, Including Certain Fuel and Fuel Transportation Contracts, is Unpredictable and an Adverse Decision in Any Material Proceeding Could Have a Material Adverse Effect on Our Financial Condition and Results of Operations, and in the Case of Proceedings Related to Certain Fuel Transportation Contracts, Adverse Decisions Could Cause FES to Seek Bankruptcy Protection and Result in One or More Events of Default Under Various Agreements Related to the Indebtedness of FES
We are involved in a number of litigation, arbitration, mediation, and similar proceedings including, but not limited to, such proceedings relating to certain fuel and fuel transportation contracts as described in Note 16, Commitments, Guarantees, and Contingencies, of the Combined Notes to the Consolidated Financial Statements and further discussed above in the risk factor “Disruptions in Our Fuel Supplies and Changes in Our Fuel Transportation Needs Could Adversely Affect Our Relationships With Suppliers, Our Ability to Operate Our Generation Facilities or Lead to Business Disputes, and Material Judgments Against Us, Any of Which May Adversely Impact Financial Results, and in the Case of Certain Fuel Transportation Contracts, Adverse Resolutions Could Cause FES to Seek Bankruptcy Protection and Result in One or More Events of Default Under Various Agreements Related to the Indebtedness of FES.” These and other matters may divert financial and management resources that would otherwise be used to benefit our operations. Further, no assurances can be given that the resolution of these matters will be favorable to us. If certain matters were ultimately resolved unfavorably to us, the results of operations and financial condition of both FirstEnergy and FES could be materially adversely impacted, and in the case of proceedings related to certain coal transportation contracts, such unfavorable results could require FES to seek protection under U.S. bankruptcy laws, which in turn would result in one or more events of default under various agreements related to the indebtedness of FES. In the event FES seeks such protection, FENOC may similarly seek protection under U.S. bankruptcy laws.
In addition, we are sometimes subject to investigations and inquiries by various state and federal regulators due to the heavily regulated nature of our industry. Any material inquiry or investigation could potentially result in an adverse ruling against us, which could have a material adverse impact on our financial condition and operating results.
We Have a Significant Percentage of Coal-Fired Generation Capacity Which Exposes Us to Risk from Regulations Relating to Coal, GHGs and CCRs
Approximately 55% of FirstEnergy's generation fleet capacity is coal-fired, totaling 9,406 MWs, of which 6,313 MWs is within the CES segment. Historically, coal-fired generating plants have greater exposure to the costs of complying with federal, state and local environmental statutes, rules and regulations relating to air emissions, including GHGs, and CCR disposal, than other types of electric generation facilities. In December 2014, the EPA finalized regulations for CCRs (non-hazardous waste), establishing national standards for the safe disposal of CCRs from electric generating plants. In August 2015, the EPA finalized the CPP (which has been stayed in the United States Supreme Court pending resolution of legal challenges) requiring reductions in GHG emissions from existing electric generating plants. These legal requirements and any future initiatives could impose substantial additional costs and, in the case of GHG requirements, could raise uncertainty about the future viability of fossil fuels, particularly coal, as an energy source for new and existing electric generation facilities. Failure to comply with any such existing or future legal requirements may also result in the assessment of fines and penalties. Significant resources also may be expended to defend against allegations of violations of any such requirements.
Capital Market Performance and Other Changes May Decrease the Value of Pension Fund Assets and Other Trust Funds, Which Could Require Significant Additional Funding and Negatively Impact our Results of Operations and Financial Condition
Our financial statements reflect the values of the assets held in trust to satisfy our obligations to decommission our nuclear generating facilities and under pension and other postemployment benefit plans. Certain of the assets held in these trusts do not have readily determinable market values. Changes in the estimates and assumptions inherent in the value of these assets could affect the value of the trusts. If the value of the assets held by the trusts declines by a material amount, our funding obligation to the trusts could materially increase. These assets are subject to market fluctuations and will yield uncertain returns, which may fall below our projected return rates. Forecasting investment earnings and costs to decommission FirstEnergy's nuclear generating facilities, to pay future pension and other obligations, requires significant judgment and actual results may differ significantly from current estimates. Capital market conditions that generate investment losses or that negatively impact the discount rate and increase the present value of liabilities may have significant impacts on the value of the decommissioning, pension and other trust funds, which could require significant additional funding and negatively impact our results of operations and financial position.

35




We Could be Subject to Higher Costs and/or Penalties Related to Mandatory Reliability Standards Set by NERC/FERC or Changes in the Rules of Organized Markets
Owners, operators, and users of the bulk electric system are subject to mandatory reliability standards promulgated by NERC and approved by FERC. The standards are based on the functions that need to be performed to ensure that the bulk electric system operates reliably. NERC, RFC and FERC can be expected to continue to refine existing reliability standards as well as develop and adopt new reliability standards. Compliance with modified or new reliability standards may subject us to higher operating costs and/or increased capital expenditures. If we were found not to be in compliance with the mandatory reliability standards, we could be subject to sanctions, including substantial monetary penalties. FERC has authority to impose penalties up to and including $1 million per day for failure to comply with these mandatory electric reliability standards.
In addition to direct regulation by FERC, we are also subject to rules and terms of participation imposed and administered by various RTOs and ISOs. Although these entities are themselves ultimately regulated by FERC, they can impose rules, restrictions and terms of service that are quasi-regulatory in nature and can have a material adverse impact on our business. For example, the independent market monitors of ISOs and RTOs may impose bidding and scheduling rules to curb the perceived potential for exercise of market power and to ensure the markets function appropriately. Such actions may materially affect our ability to sell, and the price we receive for, our energy and capacity. In addition, PJM may direct our transmission-owning affiliates to build new transmission facilities to meet PJM's reliability requirements or to provide new or expanded transmission service under the PJM Tariff.
We Rely on Transmission and Distribution Assets That We Do Not Own or Control to Deliver Our Wholesale Electricity. If Transmission is Disrupted, Including Our Own Transmission, Not Operated Efficiently, or if Capacity is Inadequate, Our Ability to Sell and Deliver Power May Be Adversely Affected
We depend on transmission and distribution facilities owned and operated by utilities and other energy companies to deliver the electricity we sell. If transmission is disrupted (as a result of weather, natural disasters or other reasons) or not operated efficiently by ISOs and RTOs, in applicable markets, or if capacity is inadequate, our ability to sell and deliver products and satisfy our contractual obligations may be adversely affected, or we may be unable to sell products on the most favorable terms. In addition, in certain of the markets in which we operate, we may be required to pay for congestion costs if we schedule delivery of power between congestion zones during periods of high demand. If we are unable to hedge or recover such congestion costs in retail rates, our financial results could be adversely affected.
Demand for electricity within our Utilities’ service areas could stress available transmission capacity requiring alternative routing or curtailing electricity usage that may increase operating costs or reduce revenues with adverse impacts to our results of operations. In addition, as with all utilities, potential concerns over transmission capacity could result in PJM or FERC requiring us to upgrade or expand our transmission system, requiring additional capital expenditures that we may be unable to recover fully or at all.
FERC requires wholesale electric transmission services to be offered on an open-access, non-discriminatory basis. Although these regulations are designed to encourage competition in wholesale market transactions for electricity, it is possible that fair and equal access to transmission systems will not be available or that sufficient transmission capacity will not be available to transmit electricity as we desire. We cannot predict the timing of industry changes as a result of these initiatives or the adequacy of transmission facilities in specific markets or whether ISOs or RTOs in applicable markets will operate the transmission networks, and provide related services, efficiently.
Temperature Variations as well as Weather Conditions or other Natural Disasters Could Have a Negative Impact on Our Results of Operations and Demand Significantly Below or Above Our Forecasts Could Adversely Affect Our Energy Margins
Weather conditions directly influence the demand for electric power. Demand for power generally peaks during the summer and winter months, with market prices also typically peaking at that time. Overall operating results may fluctuate based on weather conditions. In addition, we have historically sold less power, and consequently received less revenue, when weather conditions are milder. Severe weather, such as tornadoes, hurricanes, ice or snowstorms, or droughts or other natural disasters, may cause outages and property damage that may require us to incur additional costs that are generally not insured and that may not be recoverable from customers. The effect of the failure of our facilities to operate as planned under these conditions would be particularly burdensome during a peak demand period and could have an adverse effect on our financial condition and results of operations.
Customer demand could change as a result of severe weather conditions or other circumstances over which we have no control. We satisfy our electricity supply obligations through a portfolio approach of providing electricity from our generation assets, contractual relationships and market purchases. A significant increase in demand could adversely affect our energy margins if we are required to provide the energy supply to fulfill this increased demand at fixed rates, which we expect would remain below the wholesale prices at which we would have to purchase the additional supply if needed or, if we had available capacity, the prices at which we could otherwise sell the additional supply. A significant decrease in demand, resulting from factors including but not limited to increased customer shopping, more stringent energy efficiency mandates and increased DR initiatives could cause a decrease in the market price of power. Accordingly, any significant change in demand could have a material adverse effect on our results of operations and financial position.

36




We Are Subject to Financial Performance Risks Related to Regional and General Economic Cycles and also Related to Heavy Manufacturing Industries such as Automotive and Steel
Our business follows economic cycles. Economic conditions impact the demand for electricity and declines in the demand for electricity will reduce our revenues. The regional economy in which our Utilities operate is influenced by conditions in industries in our business territories, e.g. shale gas, automotive, chemical, steel and other heavy industries, and as these conditions change, our revenues will be impacted. Additionally, the primary market areas of our CES segment overlap, to a large degree, with our Utilities' territories and hence its revenues are substantially impacted by the same economic conditions, such as changes in industrial demand.
We Face Certain Human Resource Risks Associated with Potential Labor Disruptions and/or With the Availability of Trained and Qualified Labor to Meet Our Future Staffing Requirements
We are continually challenged to find ways to balance the retention of our aging skilled workforce while recruiting new talent to mitigate losses in critical knowledge and skills due to retirements. Additionally, a significant number of our physical workforce are represented by unions. While we believe that our relations with our employees are generally fair, we cannot provide assurances that the company will be completely free of labor disruptions such as work stoppages, work slowdowns, union organizing campaigns, strikes, lockouts or that any labor disruption will be favorably resolved. Mitigating these risks could require additional financial commitments and the failure to prevent labor disruptions and retain and/or attract trained and qualified labor could have an adverse effect on our business.
Significant Increases in Our Operation and Maintenance Expenses, Including Our Health Care and Pension Costs, Could Adversely Affect Our Future Earnings and Liquidity
We continually focus on limiting, and reducing where possible, our operation and maintenance expenses. However, we expect to continue to face increased cost pressures related to operation and maintenance expenses, including in the areas of health care and pension costs. We have experienced health care cost inflation in recent years, and we expect our cash outlay for health care costs, including prescription drug coverage, to continue to increase despite measures that we have taken requiring employees and retirees to bear a higher portion of the costs of their health care benefits. The measurement of our expected future health care and pension obligations and costs is highly dependent on a variety of assumptions, many of which relate to factors beyond our control. These assumptions include investment returns, interest rates, discount rates, health care cost trends, benefit design changes, salary increases, the demographics of plan participants and regulatory requirements. Additionally, there is an increased uncertainty related to our operation and maintenance expenses as a result of the new Trump Administration and Republican control of the U.S. Congress. While we anticipate that our operation and maintenance expenses will continue to increase, if actual results differ materially from our assumptions, our costs could be significantly higher than expected which could adversely affect our future earnings and liquidity.
Our Results May be Adversely Affected by the Volatility in Pension and OPEB Expenses
FirstEnergy recognizes in income the change in the fair value of plan assets and net actuarial gains and losses for its defined Pension and OPEB plans. This adjustment is recognized in the fourth quarter of each year and whenever a plan is determined to qualify for a remeasurement, which could result in greater volatility in pension and OPEB expenses and may materially impact our results of operations.
Additionally, following the November 2016 United States presidential and congressional elections, U.S. and global financial markets have responded with significant volatility. FirstEnergy recognizes as a pension and other post-employment benefits (OPEB) mark-to-market adjustment the change in the fair value of plan assets and net actuarial gains or losses for its pension and OPEB plans in the fourth quarter of each fiscal year and whenever a plan is determined to qualify for a remeasurement.
Cyber-Attacks, Data Security Breaches and Other Disruptions to Our Information Technology Systems Could Compromise Our Business Operations, Critical and Proprietary Information and Employee and Customer Data, Which Could Have a Material Adverse Effect on Our Business, Financial Condition and Reputation
In the ordinary course of our business, we use and are dependent upon information technology systems that utilize sophisticated operational systems and network infrastructure to run all facets of our generation, transmission and distribution services. Additionally, we store sensitive data, intellectual property and proprietary or personally identifiable information regarding our business, employees, shareholders, customers, suppliers, business partners and other individuals in our data centers and on our networks. The secure maintenance of information and information technology systems is critical to our operations.
Over the last several years, there has been an increase in the frequency of cyber-attacks by terrorists, hackers, international activist organizations, countries and individuals. These and other unauthorized parties may attempt to gain access to our network systems or facilities, or those of third parties with whom we do business in many ways, including directly through our network infrastructure or through fraud, trickery, or other forms of deceiving our employees, contractors and temporary staff. Additionally, our information and information technology systems may be increasingly vulnerable to data security breaches, damage and/or interruption due to

37




viruses, human error, malfeasance, faulty password management or other malfunctions and disruptions. Further, hardware, software, or applications we develop or procure from third parties may contain defects in design or manufacture or other problems that could unexpectedly compromise information and/or security.
Despite security measures and safeguards we have employed, including certain measures implemented pursuant to mandatory NERC Critical Infrastructure Protection standards, our infrastructure may be increasingly vulnerable to such attacks as a result of the rapidly evolving and increasingly sophisticated means by which attempts to defeat our security measures and gain access to our information technology systems may be made. Also, we may be at an increased risk of a cyber-attack and/or data security breach due to the nature of our business.
Any such cyber-attack, data security breach, damage, interruption and/or defect could: (i) disable our generation, transmission (including our interconnected regional transmission grid) and/or distribution services for a significant period of time; (ii) delay development and construction of new facilities or capital improvement projects; (iii) adversely affect our customer operations; (iv) corrupt data; and/or (v) result in unauthorized access to the information stored in our data centers and on our networks, including, company proprietary information, supplier information, employee data, and personal customer data, causing the information to be publicly disclosed, lost or stolen or result in incidents that could result in economic loss and liability and harmful effects on the environment and human health, including loss of life. Additionally, because our generation, transmission and distribution services are part of an interconnected system, disruption caused by a cybersecurity incident at another utility, electric generator, RTO, or commodity supplier could also adversely affect our operations.
Although we maintain cyber insurance and property and casualty insurance, there can be no assurance that liabilities or losses we may incur will be covered under such policies or that the amount of insurance will be adequate. Further, as cyber threats become more difficult to detect and successfully defend against, there can be no assurance that we can implement adequate preventive measures, accurately assess the likelihood of a cyber-incident or quantify potential liabilities or losses. Also, we may not discover any data security breach and loss of information for a significant period of time after the data security breach occurs. For all of these reasons, any such cyber incident could result in significant lost revenue, the inability to conduct critical business functions and serve customers for a significant period of time, the use of significant management resources, legal claims or proceedings, regulatory penalties, increased regulation, increased capital costs, increased protection costs for enhanced cyber security systems or personnel, damage to our reputation and/or the rendering of our internal controls ineffective, all of which could materially adversely affect our business and financial condition.
Physical Acts of War, Terrorism or Other Attacks on any of Our Facilities or Other Infrastructure Could Have an Adverse Effect on Our Business, Results of Operations and Financial Condition
As a result of the continued threat of physical acts of war, terrorism, or other attacks in the United States, our electric generation, fuel storage, transmission and distribution facilities and other infrastructure, including nuclear and other power plants, transformer and high voltage lines and substations, or the facilities or other infrastructure of an interconnected company, could be direct targets of, or indirect casualties of, an act of war, terrorism, or other attack, which could result in disruption of our ability to generate, purchase, transmit or distribute electricity for a significant period of time, otherwise disrupt our customer operations and/or result in incidents that could result in harmful effects on the environment and human health, including loss of life. Any such disruption or incident could result in a significant decrease in revenue, significant additional capital and operating costs, including costs to implement additional security systems or personnel to purchase electricity and to replace or repair our assets over and above any available insurance reimbursement, higher insurance deductibles, higher premiums and more restrictive insurance policies, greater regulation with higher attendant costs, generally, and significant damage to our reputation, which could have a material adverse effect on our business, results of operations and financial condition.
Capital Improvements and Construction Projects May Not be Completed Within Forecasted Budget, Schedule or Scope Parameters or Could be Canceled Which Could Adversely Affect Our Business and Results of Operations
Our business plan calls for execution of extensive capital investments in electric generation, transmission and distribution, including but not limited to our Energizing the Future transmission expansion program, which has been extended to include $4.2 to $5.8 billion in investments from 2018 through 2021. We may be exposed to the risk of substantial price increases in, or the adequacy or availability of, the costs of labor and materials used in construction, nonperformance of equipment and increased costs due to delays, including delays relating to the procurement of permits or approvals, adverse weather or environmental matters. We engage numerous contractors and enter into a large number of construction agreements to acquire the necessary materials and/or obtain the required construction-related services. As a result, we are also exposed to the risk that these contractors and other counterparties could breach their obligations to us. Such risk could include our contractors’ inabilities to procure sufficient skilled labor as well as potential work stoppages by that labor force. Should the counterparties to these arrangements fail to perform, we may be forced to enter into alternative arrangements at then-current market prices that may exceed our contractual prices, with resulting delays in those and other projects. Although our agreements are designed to mitigate the consequences of a potential default by the counterparty, our actual exposure may be greater than these mitigation provisions. Also, because we enter into construction agreements for the necessary materials and to obtain the required construction related services, any cancellation by FirstEnergy of a construction agreement could result in significant termination payments or penalties. Any delays, increased costs or losses or

38




cancellation of a construction project could adversely affect our business and results of operations, particularly if we are not permitted to recover any such costs in rates.
Changes in Technology and Regulatory Policies May Make Our Generating Facilities Significantly Less Competitive and Adversely Affect Our Results of Operations
We primarily generate electricity at large central station generation facilities. This method results in economies of scale and lower unit costs than newer generation technologies such as fuel cells, microturbines, windmills and photovoltaic solar cells. It is possible that advances in newer generation technologies will make newer generation technologies more cost-effective, or that changes in regulatory policy will create benefits that otherwise make these newer generation technologies more competitive with central station electricity production. Increased competition, whether from such advances in technologies or from changes in regulatory policy, could result in permanent reductions in our historical load, adversely impact scheduling of generation, and decrease sales and revenues from our existing generation assets, which could have a material adverse effect on our results of operations.
Further, to the extent that newer generation technologies are connected directly to load, bypassing the transmission and distribution systems, potential impacts could include decreased transmission and distribution revenues, stranded assets and increased uncertainty in load forecasting and integrated resource planning and could adversely affect our business and results of operations.
Certain FirstEnergy Companies Have Guaranteed the Performance of Third Parties, Which May Result in Substantial Costs or the Incurrence of Additional Debt
Certain FirstEnergy companies have issued guarantees of the performance of others, which obligates such FirstEnergy companies to perform in the event that the third parties do not perform. For instance, FE is a guarantor under a syndicated senior secured term loan facility, under which Global Holding borrowed $300 million. In the event of non-performance by the third parties, FirstEnergy could incur substantial cost to fulfill this obligation and other obligations under such guarantees. Such performance guarantees could have a material adverse impact on our financial position and operating results.
Additionally, with respect to FEV's investment in Global Holding, it could require additional capital from its owners, including FEV, to fund operations and meet its obligations under its term loan facility. These capital requirements could be significant and if other partners do not fund the additional capital, resulting in FEV increasing its equity ownership and obtaining the ability to direct the significant activities of Global Holding, FEV may be required to consolidate Global Holding, increasing FirstEnergy's long-term debt by $300 million.
Energy Companies are Subject to Adverse Publicity Causing Less Favorable Regulatory and Legislative Outcomes Which Could have an Adverse Impact on Our Business
Energy companies, including FirstEnergy's utility subsidiaries, have been the subject of criticism on matters including the reliability of their distribution services and the speed with which they are able to respond to power outages, such as those caused by storm damage. Adverse publicity of this nature, as well as negative publicity associated with the operation or bankruptcy of nuclear and/or coal-fired facilities or proceedings seeking regulatory recoveries may cause less favorable legislative and regulatory outcomes and damage our reputation, which could have an adverse impact on our business.
Risks Associated With Regulation

Any Subsequent Modifications to, Denial of, or Delay in the Effectiveness of the PUCO’s approval of the DMR could impose significant risks on FirstEnergy’s operations and Materially and Adversely Impact the Credit Ratings, Results of Operations and Financial Condition of FirstEnergy
On October 12, 2016, the PUCO denied the Ohio Companies’ modified Rider RRS and, in accordance with the PUCO Staff’s recommendation, approved a new DMR providing for the collection of $204 million annually (grossed up for income taxes) for three years with a possible extension for an additional two years. On November 10, 2016 and November 14, 2016, several parties, including the Ohio Companies, filed additional applications for rehearing on the Ohio Companies’ ESP IV with the PUCO. On December 7, 2016, the PUCO granted reconsideration for further consideration of the matters specified in the applications for rehearing. The matter remains pending before the PUCO. Any subsequent modification to, denial of, or delay in the effectiveness of, the PUCO’s order approving the DMR could impose risks on our operations and materially and adversely impact the credit ratings, results of operations and financial condition of FirstEnergy.
Complex and Changing Government Regulations, Including Those Associated With Rates and Rate Cases Could Have a Negative Impact on Our Results of Operations
We are subject to comprehensive regulation by various federal, state and local regulatory agencies that significantly influence our operating environment. Changes in, or reinterpretations of, existing laws or regulations, or the imposition of new laws or regulations, could require us to incur additional costs or change the way we conduct our business, and therefore could have an material adverse impact on our results of operations.

39




On January 26, 2017, FERC Commissioner Norman Bay announced his resignation from FERC effective February 3, 2017. Commissioner Bay’s departure means there will be only two sitting commissioners on the commission; accordingly FERC will not have the FPA-required quorum of at least three commissioners to conduct commission business, including the issuance of final commission orders on pending proceedings. Delays in FERC orders could adversely impact the timing and implementation of pending or planned FERC-jurisdictional rate cases and transactions, and therefore could have a material adverse impact on our business, financial condition, results of operations and cash flow.
Our transmission and operating utility subsidiaries currently provide service at rates approved by one or more regulatory commissions. Thus, the rates a utility is allowed to charge may be decreased as a result of actions taken by FERC or by one or more of the state regulatory commissions in which our utility subsidiaries operate. Also, these rates may not be set to recover such utility's expenses at any given time. Additionally, there may also be a delay between the timing of when costs are incurred and when costs are recovered. For example, we may be unable to timely recover the costs for our energy efficiency investments or expenses and additional capital or lost revenues resulting from the implementation of aggressive energy efficiency programs. While rate regulation is premised on providing an opportunity to earn a reasonable return on invested capital and recovery of operating expenses, there can be no assurance that the applicable regulatory commission will determine that all of our costs have been prudently incurred or that the regulatory process in which rates are determined will always result in rates that will produce full recovery of our costs in a timely manner. Further, there can be no assurance that we will retain the expected recovery in future rate cases.
In addition, as a U.S. corporation, we are subject to U.S. laws, Executive Orders, and regulations administered and enforced by the U.S. Department of Treasury and the Department of Justice restricting or prohibiting business dealings in or with certain nations and with certain specially designated nationals (individuals and legal entities). If any of our existing or future operations or investments, including our joint venture investment in Signal Peak or our continued procurement of uranium from existing suppliers, are subsequently determined to involve such prohibited parties we could be in violation of certain covenants in our financing documents and unless we cease or modify such dealings, we could also be in violation of such U.S. laws, Executive Orders and sanctions regulations, each of which could have a material adverse effect on our business, financial condition, results of operations and cash flows.
State Rate Regulation May Delay or Deny Full Recovery of Costs and Impose Risks on Our Operations. Any Denial of or Delay in, Cost Recovery Could Have an Adverse Effect on Our Business, Results of Operations, Cash Flows and Financial Condition
Each of the Utilities' retail rates are set by its respective regulatory agency for utilities in the state in which it operates - in Maryland by the MDPSC, in Ohio by the PUCO, in New Jersey by the NJBPU, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC through traditional, cost-based regulated utility ratemaking. As a result, any of the Utilities may not be permitted to recover its costs and, even if it is able to do so, there may be a significant delay between the time it incurs such costs and the time it is allowed to recover them. Factors that may affect outcomes in the distribution rate cases include: (i) the value of plant in service; (ii) authorized rate of return; (iii) capital structure (including hypothetical capital structures); (iv) depreciation rates; (v) the allocation of shared costs, including consolidated deferred income taxes and income taxes payable across the FirstEnergy utilities; (vi) regulatory approval of rate recovery mechanisms for capital spending programs (including for example accelerated deployment of smart meters); and (vii) the accuracy of forecasts used for ratemaking purposes in "future test year" cases.
FirstEnergy can provide no assurance that any base rate request filed by any of the Utilities will be granted in whole or in part. Any denial of, or delay in, any base rate request could restrict the applicable Utility from fully recovering its costs of service, may impose risks on its operations, and may negatively impact its results of operations, cash flows and financial condition. In addition, to the extent that any of the Utilities seeks rate increases after an extended period of frozen or capped rates, pressure may be exerted on the applicable legislators and regulators to take steps to control rate increases, including through some form of rate increase moderation, reduction or freeze. Any related public discourse and debate can increase uncertainty associated with the regulatory process, the level of rates and revenues that are ultimately obtained, and the ability of the Utility to recover costs. Such uncertainty may restrict operational flexibility and resources, and reduce liquidity and increase financing costs.
Federal Rate Regulation May Delay or Deny Full Recovery of Costs and Impose Risks on Our Operations. Any Denial or Reduction of, or Delay in Cost Recovery Could Have an Adverse Effect on Our Business, Results of Operations, Cash Flows and Financial Condition
FERC policy currently permits recovery of prudently-incurred costs associated with wholesale power rates and the expansion and updating of transmission infrastructure within its jurisdiction. If FERC were to adopt a different policy regarding recovery of transmission costs or if transmission needs do not continue or develop as projected, or if there is any resulting delay in cost recovery, our strategy of investing in transmission could be affected. If FERC were to lower the rate of return it has authorized for FirstEnergy's cost-based wholesale power rates or transmission investments and facilities, it could reduce future earnings and cash flows, and impact our financial condition.

40




There are multiple matters pending before FERC, including without limitation, MAIT's and JCP&L's formula rate proceedings. There can be no assurance as to the outcome of these proceedings and an adverse result could have an adverse impact on FirstEnergy’s results of operations and business conditions.
Regulatory Changes in the Electric Industry Could Affect Our Competitive Position and Result in Unrecoverable Costs Adversely Affecting Our Business and Results of Operations
As a result of regulatory initiatives, changes in the electric utility business have occurred, and are continuing to take place throughout the United States, including the states in which we do business. These changes have resulted, and are expected to continue to result, in fundamental alterations in the way utilities and competitive energy providers conduct their business. FERC and the U.S. Congress propose changes from time to time in the structure and conduct of the electric utility industry.
If any regulatory efforts result in costs, decreased margins and/or unrecoverable costs, our business and results of operations would be adversely affected. We cannot predict the extent or timing of further regulatory efforts to modify our business or the industry.
The Business Operations of Our Subsidiaries That Sell Wholesale Power Are Subject to Regulation by FERC and Could be Adversely Affected by Such Regulation
FERC granted the Utilities and certain FirstEnergy generating subsidiaries authority to sell electric energy, capacity and ancillary services at market-based rates. These orders also granted waivers of certain FERC accounting, record-keeping and reporting requirements, as well as, for certain of these subsidiaries, waivers of the requirements to obtain FERC approval for issuances of securities. FERC’s orders that grant this market-based rate authority reserve with FERC the right to revoke or revise that authority if FERC subsequently determines that these companies can exercise market power in transmission or generation, or create barriers to entry, or have engaged in prohibited affiliate transactions. In the event that one or more of FirstEnergy's market-based rate authorizations were to be revoked or adversely revised, the affected FirstEnergy subsidiary(ies) may be subject to sanctions and penalties, and would be required to file with FERC for authorization of individual wholesale sales transactions, which could involve costly and possibly lengthy regulatory proceedings and the loss of flexibility afforded by the waivers associated with the current market-based rate authorizations.
Energy Efficiency and Peak Demand Reduction Mandates and Energy Price Increases Could Negatively Impact Our Financial Results
A number of regulatory and legislative bodies have introduced requirements and/or incentives to reduce peak demand and energy consumption. Such conservation programs could result in load reduction and adversely impact our financial results in different ways. To the extent conservation results in reduced energy demand or significantly slows the growth in demand, the value of our competitive generation and other unregulated business activities could be adversely impacted. We currently have energy efficiency riders in place to recover the cost of these programs either at or near a current recovery time frame in the states where we operate.
Currently, only our Ohio Companies recover lost distribution revenues that result between distribution rate cases. In our regulated operations, conservation could negatively impact us depending on the regulatory treatment of the associated impacts. Should we be required to invest in conservation measures that result in reduced sales from effective conservation, regulatory lag in adjusting rates for the impact of these measures could have a negative financial impact. We have already been adversely impacted by reduced electric usage due in part to energy conservation efforts such as the use of efficient lighting products such as CFLs, halogens and LEDs. We could also be adversely impacted if any future energy price increases result in a decrease in customer usage. We are unable to determine what impact, if any, conservation and increases in energy prices will have on our financial condition or results of operations.
Additionally, failure to meet regulatory or legislative requirements to reduce energy consumption or otherwise increase energy efficiency could result in penalties that could adversely affect our results.
Mandatory Renewable Portfolio Requirements Could Negatively Affect Our Costs and Have An Adverse Effect on Our Financial Condition and Results of Operations
Where federal or state legislation mandates the use of renewable and alternative fuel sources, such as wind, solar, biomass and geothermal and such legislation does not also provide for adequate cost recovery, it could result in significant changes in our business, including material increases in REC purchase costs, purchased power costs and capital expenditures. Such mandatory renewable portfolio requirements may have an adverse effect on our financial condition and results of operations.
The EPA is Conducting NSR Investigations at a Number of Generating Plants that We Currently or Formerly Owned, the Results of Which Could Negatively Impact Our Results of Operations and Financial Condition
We may be subject to risks in connection with changing or conflicting interpretations of existing laws and regulations, including, for example, the applicability of EPA's NSR programs. Under the CAA, modification of our generation facilities in a manner that results

41




in increased emissions could subject our existing generation facilities to the far more stringent new source standards applicable to new generation facilities.
The EPA has taken the view that many companies, including many energy producers, have been modifying emissions sources in violation of NSR standards in connection with work considered by the companies to be routine maintenance. EPA has investigated alleged violations of the NSR standards at certain of our existing and former generating facilities. We intend to vigorously pursue and defend our position, but we are unable to predict their outcomes. If NSR and similar requirements are imposed on our generation facilities, in addition to the possible imposition of fines, compliance could entail significant capital investments in pollution control technology, which could have an adverse impact on our business, results of operations, cash flows and financial condition.
Costs of Compliance with Environmental Laws are Significant, and the Cost of Compliance with New Environmental Laws, Including Limitations on GHG Emissions, Could Adversely Affect Cash Flow and Profitability
Our operations are subject to extensive federal, state and local environmental statutes, rules and regulations. Compliance with these legal requirements requires us to incur costs for, among other things, installation and operation of pollution control equipment, emissions monitoring and fees, remediation and permitting at our facilities. These expenditures have been significant in the past and may increase in the future. We may be forced to shut down other facilities or change their operating status, either temporarily or permanently, if we are unable to comply with these or other existing or new environmental requirements, or if we make a determination that the expenditures required to comply with such requirements are unreasonable.
For example, in December 2011, the EPA finalized MATS to establish emission standards for, among other things, mercury, PM and HCI, for electric generating units. The costs associated with MATS compliance, and other environmental laws, is substantial. As a result of a comprehensive review of FirstEnergy's coal-fired generating facilities in light of MATS and other expanded requirements, we deactivated twenty-six (26) older coal-fired generating units in 2012, 2013, and 2015.
Moreover, new environmental laws or regulations including, but not limited to EPA's CPP requiring reductions of GHG emissions and CWA effluent limitations imposing more stringent water discharge regulations, or changes to existing environmental laws or regulations may materially increase our costs of compliance or accelerate the timing of capital expenditures. Because of the deregulation of certain of our generation facilities, we will not directly recover through rates additional costs incurred for such compliance. Our compliance strategy, including but not limited to, our assumptions regarding estimated compliance costs, although reasonably based on available information, may not successfully address future relevant standards and interpretations. If we fail to comply with environmental laws and regulations or new interpretations of longstanding requirements, even if caused by factors beyond our control, that failure could result in the assessment of civil or criminal liability and fines. In addition, any alleged violation of environmental laws and regulations may require us to expend significant resources to defend against any such alleged violations.
At the international level, the Obama Administration submitted in March 2015, a formal pledge for the U.S. to reduce its economy-wide greenhouse gas emissions by 26 to 28 percent below 2005 levels by 2025 and joined in adopting the agreement reached on December 12, 2015 at the United Nations Framework Convention on Climate Change meetings in Paris. The Paris Agreement has since been ratified by over 125 countries representing more than 80% of global GHG emissions and its non-binding obligations to limit global warming to well below two degrees Celsius have become effective. Further, due to the uncertainty of control technologies available to reduce GHG emissions, any other legal obligation that requires substantial reductions of GHG emissions could result in substantial additional costs, adversely affecting cash flow and profitability, and raise uncertainty about the future viability of fossil fuels, particularly coal, as an energy source for new and existing electric generation facilities. It remains unclear whether and how the results of the 2016 U.S. election could impact the regulation of GHG emissions at the federal and state level.
We Could be Exposed to Private Rights of Action Relating to Environmental Matters Seeking Damages Under Various State and Federal Law Theories
Private individuals may seek to enforce environmental laws and regulations against us and could allege personal injury, property damages or other relief. For example, claims have been made against certain energy companies alleging that CO2 emissions from power generating facilities constitute a public nuisance under federal and/or state common law. While FirstEnergy is not a party to this litigation, it, and/or one of its subsidiaries, could be named in other actions making similar allegations. An unfavorable ruling in any such case could result in the need to make modifications to our coal-fired plants or reduce emissions, suspend operations or pay money damages or penalties. Adverse rulings in these or other types of actions could have an adverse impact on our results of operations and financial condition and could significantly impact our operations.
Various Federal and State Water and Solid, Non-Hazardous and Hazardous Waste Regulations May Require Us to Make Material Capital Expenditures
In September 2015, the EPA finalized new, more stringent effluent limits for arsenic, mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water under the CWA. The EPA has also established performance standards under the CWA for reducing impacts on fish and shellfish from cooling water intake structures at certain existing electric generating plants, specifically, reducing impingement mortality (when aquatic organisms are pinned against screens or other parts of a cooling water intake system) to a 12% annual average and entrainment (which occurs when aquatic life is drawn

42




into a facility's cooling water system) using site-specific controls based on studies to be submitted to permitting authorities. FirstEnergy is studying the cost and effectiveness of various control options to divert fish away from its plants' cooling water intake systems. Depending on the results of such studies and implementation of impingement and entrainment performance standards by permitting authorities, the future costs of compliance with these standards may require material capital expenditures.
We Are or May be Subject to Costs of Remediation of Environmental Contamination at Current or Formerly Owned Facilities
We may be subject to liability under environmental laws for the costs of remediating environmental contamination of property now or formerly owned or operated by us and of property contaminated by hazardous substances that we may have generated regardless of whether the liabilities arose before, during or after the time we owned or operated the facilities. We are currently involved in a number of proceedings relating to sites where hazardous substances have been released and we may be subject to additional proceedings in the future. We also have current or previous ownership interests in sites associated with the production of gas and the production and delivery of electricity for which we may be liable for additional costs related to investigation, remediation and monitoring of these sites. Remediation activities associated with our former MGP operations are one source of such costs. Citizen groups or others may bring litigation over environmental issues including claims of various types, such as property damage, personal injury, and citizen challenges to compliance decisions on the enforcement of environmental requirements, such as opacity and other air quality standards, which could subject us to penalties, injunctive relief and the cost of litigation. We cannot predict the amount and timing of all future expenditures (including the potential or magnitude of fines or penalties) related to such environmental matters, although we expect that they could be material.
In some cases, a third party who has acquired assets from us has assumed the liability we may otherwise have for environmental matters related to the transferred property. If the transferee fails to discharge the assumed liability or disputes its responsibility, a regulatory authority or injured person could attempt to hold us responsible, and our remedies against the transferee may be limited by the financial resources of the transferee.
We Are and May Become Subject to Legal Claims Arising from the Presence of Asbestos or Other Regulated Substances at Some of Our Facilities
We have been named as a defendant in pending asbestos litigations involving multiple plaintiffs and multiple defendants, in several states. The majority of these claims arise out of alleged past exposures by contractors (and in Pennsylvania, former employees) at both currently and formerly owned electric generation plants. In addition, asbestos and other regulated substances are, and may continue to be, present at currently owned facilities where suitable alternative materials are not available. We believe that any remaining asbestos at our facilities is contained and properly identified in accordance with applicable governmental regulations, including OSHA. The continued presence of asbestos and other regulated substances at these facilities, however, could result in additional actions being brought against us. This is further complicated by the fact that many diseases, such as mesothelioma and cancer, have long latency periods in which the disease process develops, thus making it impossible to accurately predict the types and numbers of such claims in the near future. While insurance coverages exist for many of these pending asbestos litigations, others have no such coverages, resulting in FirstEnergy being responsible for all defense expenditures, as well as any settlements or verdict payouts.
The Continuing Availability and Operation of Generating Units is Dependent on Retaining or Renewing the Necessary Licenses, Permits, and Operating Authority from Governmental Entities, Including the NRC
We are required to have numerous permits, approvals and certificates from the agencies that regulate our business. We believe the necessary permits, approvals and certificates have been obtained for our existing operations and that our business is conducted in accordance with applicable laws; however, we are unable to predict the impact on our operating results from future regulatory activities of any of these agencies and we are not assured that any such permits, approvals or certifications will be renewed.
Potential NRC Regulation in Response to the Incident at Japan's Fukushima Daiichi Nuclear Plant Could Adversely Affect Our Business and Financial Condition
As a result of the NRC's investigation of the incident at the Fukushima Daiichi nuclear plant, the NRC has begun to promulgate new or revised requirements with respect to nuclear plants located in the United States, which could necessitate additional expenditures at our nuclear plants. For example, as a follow up to the NRC near-term Task Force's review and analysis of the Fukushima Daiichi accident, in January 2012, the NRC released an updated seismic risk model that plant operators must use in performing the seismic reevaluations recommended by the task force. The NRC has also issued orders and guidance that increases procedural and testing requirements, requires physical modifications to our plants and is expected to increase future compliance and operating costs. These reevaluations could result in the required implementation of additional mitigation strategies or modifications. The impact of any such regulatory actions could adversely affect FirstEnergy's and FES' financial condition or results of operations.
The Risks Associated with Climate Change May Impact Our Results of Operations and Cash Flows

43




Physical risks of climate change, such as more frequent or more extreme weather events, changes in temperature and precipitation patterns, changes to ground and surface water availability, and other related phenomena, could affect some, or all, of our operations. Severe weather or other natural disasters could be destructive, which could result in increased costs, including supply chain costs. An extreme weather event within the Utilities' service areas can also directly affect their capital assets, causing disruption in service to customers due to downed wires and poles or damage to other operating equipment. Climate change could also affect the availability of a secure and economical supply of water in some locations, which is essential for continued operation of generating plants. Further, as extreme weather conditions increase system stress, we may incur costs relating to additional system backup or service interruptions, and in some instances we may be unable to recover such costs. For all of these reasons, these physical risks could have an adverse financial impact on our operations and operating results. Climate change poses other financial risks as well. To the extent weather conditions are affected by climate change, customers’ energy use could increase or decrease depending on the duration and magnitude of the changes. Increased energy use due to weather changes may require us to invest in additional system assets and purchase additional power. Additionally, decreased energy use due to weather changes may affect our financial condition through decreased rates, revenues, margins or earnings.
Future Changes in Accounting Standards May Affect Our Reported Financial Results
The SEC, FASB or other authoritative bodies or governmental entities may issue new pronouncements or new interpretations of existing accounting standards that may require us to change our accounting policies. These changes are beyond our control, can be difficult to predict and could materially impact how we report our financial condition and results of operations. We could be required to apply a new or revised standard retroactively, which could adversely affect our financial position.
Changes in Local, State or Federal Tax Laws Applicable To Us or Adverse Audit Results or Tax Rulings, and Any Resulting Increases in Taxes and Fees, May Adversely Affect Our Results of Operations, Financial Condition and Cash Flows
FirstEnergy is subject to various local, state and federal taxes, including income, franchise, real estate, sales and use and employment-related taxes. We exercise significant judgment in calculating such tax obligations, booking reserves as necessary to reflect potential adverse outcomes regarding tax positions we have taken and utilizing tax benefits, such as carryforwards and credits. Additionally, various tax rate and fee increases may be proposed or considered in connection with such changes in local, state or federal tax law. We cannot predict whether legislation or regulation will be introduced, the form of any legislation or regulation, or whether any such legislation or regulation will be passed by legislatures or regulatory bodies. Any such changes, or any adverse tax audit results or adverse tax rulings on positions taken by FirstEnergy or its subsidiaries could have a negative impact on its results of operations, financial condition and cash flows.
In addition, the new presidential administration of the U.S. and the majority political party of the U.S. Congress have announced a potential reform of U.S. tax laws. The details of the President's comprehensive tax plan have not yet emerged but during the presidential campaign, he outlined several proposed changes to corporate taxes. In addition, House Republicans have drafted an initial tax reform, known as the "Blueprint," to significantly amend the current income tax code. Areas of tax reform under discussion include, without limitation, the following proposals: (i) elimination (partial or full) of the deductibility of interest expense on corporate debt, (ii) reduction in the corporate federal income tax rate from 35 percent to 20 percent, and (iii) immediate expensing of capital investment expenditures.

No details regarding the transition from the current tax code to potential new tax reforms have emerged. We cannot predict whether, when or to what extent new U.S. tax laws, regulations, interpretations or rulings will be issued, nor is the long-term impact of proposed tax reform clear. A reform of U.S. tax laws may be enacted in a manner that negatively impacts our results of operations, financial condition, business operations, earnings and is adverse to FE's shareholders. Furthermore, with respect to the Utilities, FirstEnergy cannot predict what, if any, response state regulatory commissions may have if any such tax reforms are enacted and the potential response of such authorities may include imposition of rate reductions in order to pass through to customers any perceived benefit of any such tax reform.


44




Risks Associated With Financing and Capital Structure

In the Event of Volatility or Unfavorable Conditions in the Capital and Credit Markets, Our Business, Including the Immediate Availability and Cost of Short-Term Funds for Liquidity Requirements, Our Ability to Meet Long-Term Commitments, Our Ability to Hedge Effectively Our Generation Portfolio and the Competitiveness and Liquidity of Energy Markets May be Adversely Affected, Which Could Negatively Impact Our Results of Operations, Cash Flows and Financial Condition
We rely on the capital markets to meet our financial commitments and short-term liquidity needs if internal funds are not available from our operations. We also use letters of credit provided by various financial institutions to support our hedging operations. We also deposit cash in short-term investments. In the event of volatility in the capital and credit markets, our ability to draw on our credit facilities and cash may be adversely affected. Our access to funds under those credit facilities is dependent on the ability of the financial institutions that are parties to the facilities to meet their funding commitments. Those institutions may not be able to meet their funding commitments if they experience shortages of capital and liquidity or if they experience excessive volumes of borrowing requests within a short period of time. Any delay in our ability to access those funds, even for a short period of time, could have a material adverse effect on our results of operations and financial condition.
Should there be fluctuations in the capital and credit markets as a result of uncertainty, changing or increased regulation, reduced alternatives or failures of significant foreign or domestic financial institutions or foreign governments, our access to liquidity needed for our business could be adversely affected. Unfavorable conditions could require us to take measures to conserve cash until the markets stabilize or until alternative credit arrangements or other funding for our business needs can be arranged. Such measures could include deferring capital expenditures, changing hedging strategies to reduce collateral-posting requirements, and reducing or eliminating future dividend payments or other discretionary uses of cash.
Energy markets depend heavily on active participation by multiple counterparties, which could be adversely affected should there be disruptions in the capital and credit markets. Reduced capital and liquidity and failures of significant institutions that participate in the energy markets could diminish the liquidity and competitiveness of energy markets that are important to our business. Perceived weaknesses in the competitive strength of the energy markets could lead to pressures for greater regulation of those markets or attempts to replace those market structures with other mechanisms for the sale of power, including the requirement of long-term contracts, which could have a material adverse effect on our results of operations and cash flows.
Interest Rates and/or a Credit Rating Downgrade Could Negatively Affect Our or Our Subsidiaries' Financing Costs, Ability to Access Capital and Requirement to Post Collateral and the Ability to Continue Successfully Implementing Our Retail Sales Strategy
We have near-term exposure to interest rates from outstanding indebtedness indexed to variable interest rates, and we have exposure to future interest rates to the extent we seek to raise debt in the capital markets to meet maturing debt obligations and fund construction or other investment opportunities. Past disruptions in capital and credit markets have resulted in higher interest rates on new publicly issued debt securities, increased costs for certain of our variable interest rate debt securities and failed remarketings of variable interest rate tax-exempt debt issued to finance certain of our facilities. Similar future disruptions could increase our financing costs and adversely affect our results of operations. Also, interest rates could change as a result of economic or other events that are beyond our risk management processes. As a result, we cannot always predict the impact that our risk management decisions may have on us if actual events lead to greater losses or costs that our risk management positions were intended to hedge. Although we employ risk management techniques to hedge against interest rate volatility, significant and sustained increases in market interest rates could materially increase our financing costs and negatively impact our reported results of operations.
We rely on access to bank and capital markets as sources of liquidity for cash requirements not satisfied by cash from operations. A downgrade in our or our subsidiaries' credit ratings from the nationally recognized credit rating agencies, particularly to a level below investment grade, could negatively affect our ability to access the bank and capital markets, especially in a time of uncertainty in either of those markets, and may require us to post cash collateral to support outstanding commodity positions in the wholesale market, as well as available letters of credit and other guarantees. A downgrade in our credit rating, or that of our subsidiaries, could also preclude certain retail customers from executing supply contracts with us and therefore impact our ability to successfully implement our retail sales strategy. Furthermore, a downgrade could increase the cost of such capital by causing us to incur higher interest rates and fees associated with such capital. A rating downgrade would increase our interest expense on certain of FirstEnergy's long-term debt obligations and would also increase the fees we pay on our various existing credit facilities, thus increasing the cost of our working capital. A rating downgrade could also impact our ability to grow our regulated businesses by substantially increasing the cost of, or limiting access to, capital.
Any Default by Customers or Other Counterparties Could Have a Material Adverse Effect on Our results of Operations and Financial Condition
We are exposed to the risk that counterparties that owe us money, power, fuel or other commodities could breach their obligations. Should the counterparties to these arrangements fail to perform, we may be forced to enter into alternative arrangements at then-current market prices that may exceed our contractual prices, which would cause our financial results to be diminished and we might incur losses. Some of our agreements contain provisions that require the counterparties to provide credit support to secure

45




all or part of their obligations to FirstEnergy or its subsidiaries. If the counterparties to these arrangements fail to perform, we may have a right to receive the proceeds from the credit support provided, however the credit support may not always be adequate to cover the related obligations. In such event, we may incur losses in addition to amounts, if any, already paid to the counterparties, including by being forced to enter into alternative arrangements at then-current market prices that may exceed our contractual prices. Although our estimates take into account the expected probability of default by a counterparty, our actual exposure to a default by customers or other counterparties may be greater than the estimates predict, which could have a material adverse effect on our results of operations and financial condition.
We Must Rely on Cash from Our Subsidiaries and Any Restrictions on Our Utility Subsidiaries' Ability to Pay Dividends or Make Cash Payments to Us May Adversely Affect Our Cash Flows and Financial Condition
We are a holding company and our investments in our subsidiaries are our primary assets. Substantially all of our business is conducted by our subsidiaries. Consequently, our cash flow, including our ability to pay dividends and service debt, is dependent on the operating cash flows of our subsidiaries and their ability to upstream cash to the holding company. For example, reduced availability of FES cash flow resulting from a high level of indebtedness and related collateral pledges or any decision to seek protection under U.S. bankruptcy laws, could have a material adverse impact on FES’ ability to pay dividends to FE. In the event FES seeks such protection under the U.S. bankruptcy laws, FENOC may similarly seek protection under U.S. bankruptcy laws. Any inability of our subsidiaries to pay dividends or make cash payments to us may adversely affect our cash flows and financial condition.
Additionally, our utility and transmission subsidiaries are regulated by various state utility and federal commissions that generally possess broad powers to ensure that the needs of utility customers are being met. Those state and federal commissions could attempt to impose restrictions on the ability of our utility and transmission subsidiaries to pay dividends or otherwise restrict cash payments to us.
FE May Issue Additional Equity Securities, Which Would Likely Lead to Dilution of Its Issued and Outstanding Common Stock and May Materially and Adversely Affect the Price of FE's Common Stock
As part of its capital program, FE expects to issue $500 million of equity in each year 2017 through 2019 to help meet long-term cash needs, including cash requirements to fund Regulated Transmission's Energizing the Future program and for other general corporate and business purposes. The issuance of additional shares of FE's previously authorized and unissued common stock would likely result in the dilution of the ownership interests of FE's existing shareholders and a large issuance of additional shares may negatively impact the market price of FE's common stock. FE is authorized to issue 490 million shares of common stock. As of December 31, 2016, 442,344,218 shares of FE's common stock were issued and outstanding, and there were outstanding options and restricted stock awards totaling an additional 1,529,167 shares of FE's common stock. FE also has additional shares available for grant under the FirstEnergy Corp. 2015 Incentive Compensation Plan and equity compensation plans or amendments to existing equity compensation plans for employees and directors may be adopted from time to time. Issuance of these shares of common stock would likely dilute the ownership interests of FE's then existing shareholders.
Because FE's decision to issue additional equity securities in any future offering will depend on market conditions and other factors beyond FE's control, it cannot predict or estimate the amount, timing or nature of FE's future issuances, if any, and/or otherwise predict the extent of any future dilution.
We Cannot Assure Common Shareholders that Future Dividend Payments Will be Made, or if Made, in What Amounts They May be Paid
Our Board of Directors will continue to regularly evaluate our common stock dividend and determine an appropriate dividend each quarter taking into account such factors as, among other things, our earnings, financial condition and cash flows from subsidiaries, as well as general economic and competitive conditions. We cannot assure common shareholders that dividends will be paid in the future, or that, if paid, dividends will be at the same amount or with the same frequency as in the past.
The Recognition of Impairments of Goodwill and Long-Lived Assets Has Adversely Effected Our Results of Operations and Additional Impairments in the CES Segment Could Result Under Certain Circumstances In One or More Events of Default Under Various Agreements Related to the Indebtedness of FE and Have a Material Adverse Effect on FirstEnergy’s Business, Financial Condition, Results of Operations, Liquidity and the Trading Price of FirstEnergy's Securities
We have approximately $5.6 billion of goodwill on our consolidated balance sheet as of December 31, 2016. Goodwill is tested for impairment annually as of July 31 or whenever events or changes in circumstances indicate impairment may have occurred. Key assumptions incorporated in the estimated cash flows used for the impairment analysis requiring significant management judgment include: discount rates, growth rates, future energy and capacity pricing, projected operating income, changes in working capital, projected capital expenditures, projected funding of pension plans, expected results of future rate proceedings, the impact of pending carbon and other environmental legislation and terminal multiples. For example, as a result of low capacity prices associated with the 2019/2020 PJM Base Residual Auction in May 2016, as well as its annual update to its fundamental long-term capacity and energy price forecast in the second quarter of 2016, FirstEnergy determined that an interim impairment analysis of the goodwill at

46




CES was necessary in connection with the preparation of its financial statements for the three-month period ended June 30, 2016. Based on such impairment analysis, FirstEnergy’s second quarter 2016 results included a pre-tax non-cash impairment charge of approximately $800 million, representing the total goodwill at the CES segment, including $23 million at FES.
In addition, we also review our long-lived assets and investments for impairment when circumstances indicate the carrying value of these assets may not be recoverable. For example, in 2016, we recorded a $647 million non-cash pre-tax impairment charge associated with exit operations of Bay Shore Unit 1 and W.H. Sammis, Units 1-4, including $517 million at FES. In connection with the intention to exit competitive generation, FirstEnergy recognized in the fourth quarter of 2016 a non-cash pre-tax impairment charge of approximately $9.2 billion ($8.1 billion - FES) in FirstEnergy’s 2016 consolidated statement of income.
We are unable to predict whether further impairments of one or more of our long-lived assets or investments may occur in the future. The actual timing and amounts of any impairments to goodwill, or long-lived assets in the future depends on many factors, including the outcome of the strategic review, interest rates, sector market performance, our capital structure, natural gas or other commodity prices, market prices for power, results of future rate proceedings, operating and capital expenditure requirements, the value of comparable acquisitions, environmental regulations and other factors. A determination that goodwill, a long-lived asset, or other investments are impaired would result in a non-cash charge that could materially adversely affect our results of operations and capitalization. Additionally, although the recent amendment to FE’s credit facility revised the debt to total capitalization ratio covenant to exclude non-cash after-tax charges of up to $5.5 billion related to asset impairments attributable to the power generation assets owned by FES, AE Supply and each of their subsidiaries, charges beyond that amount could result in an event of default related to the indebtedness of FE and have a material adverse effect on FirstEnergy’s business, financial condition, results of operations, liquidity and the trading price of FirstEnergy's securities.


47




ITEM 1B.
UNRESOLVED STAFF COMMENTS

None.
ITEM 2.
PROPERTIES

The first mortgage indentures for the Ohio Companies, Penn, MP, PE, WP, FG and NG constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures. See "Note 7, Leases", and "Note 12, Capitalization", of the Combined Notes to Consolidated Financial Statements for information concerning leases and financing encumbrances affecting certain of the Utilities’, FG’s and NG’s properties.

FirstEnergy controls the following generation sources as of February 21, 2017, shown in the table below. Except for the leasehold interests, OVEC participation and wind and solar power arrangements referenced in the footnotes to the table, substantially all of FES' competitive generating units are owned by NG (nuclear) and FG (non-nuclear); the regulated generating units are owned by JCP&L and MP.
 
 
 
 
 
 
Competitive
 
 
Plant (Location)
 
Unit
 
Total
 
FES
 
AE Supply
 
Regulated
 
 
 
 
Net Demonstrated Capacity (MW)
Super-critical Coal-fired:
 
 

 
 
 
 
 
 
 
 
Bruce Mansfield (Shippingport, PA)
 
1

 
830

(1)
830

 

 

Bruce Mansfield (Shippingport, PA)
 
2

 
830

 
830

 

 

Bruce Mansfield (Shippingport, PA)
 
3

 
830

 
830

 

 

Harrison (Haywood, WV)
 
1-3

 
1,984

 

 

 
1,984

Pleasants (Willow Island, WV)
 
1-2

 
1,300

 

 
1,300

 

W. H. Sammis (Stratton, OH)
 
6-7

 
1,200

  
1,200

 

 

Fort Martin (Maidsville, WV)
 
1-2

 
1,098

 

 

 
1,098

 
 
 
 
8,072

 
3,690

 
1,300

 
3,082

Sub-critical and Other Coal-fired:
 
 
 
 
 
 
 
 
 
 
W. H. Sammis (Stratton, OH)
 
1-5

 
1,010

 
1,010

 

 

Bay Shore (Toledo, OH)
 
1

 
136

 
136

 

 

OVEC (Cheshire, OH) (Madison, IN)
 
1-11

 
188

(3)
110

 
67